METROPOLITAN EDISON COMPANY :vc:icim or at:sem pusuc uriuric:coneonarian TELEPHONE 215 - 929 3601 GT OFFICE BOX 542 READING, PENNSYLVANI A 19603 June 3, 1977 GQL OTTk Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory C d ssion Office of Inspection fa Enforce =ent Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Sir:
Three Mile :aland Nuclear Station Unit 2 (IMI-2)
License No. CPPR-66 It.spection Report 77-14 Docket No. 50-320 The subject inspection report resulting from Mr. T. Rebelowski's inspection of April 6 - 8, 1977 containa an infraction concerning lack of Diesel Generator stator closure covers during performance of contaminant producing work above This letter constitutes the written response to this in-the generators.
fraction.
Infraction 10 CFR Part 50, Appendix 3, Criterion XIII states in part that " Measures shall be established to control the handling, storage, shipping, clearing and preservation of material and equip =ent in accordance with vork and inspection instruction to prevent da= age or deterioration".
Quality Control Procedure QC 27-2, Rev. 2. " Prevention of Frireign Material Entry and Control of Tools",Section III.B.2.C. directs the QC field superiisor or his designated representative to verify that all openings are properly closed with temporary covers at the end of ths work day or when work is suspended.
th licensee was accceplishing Centrary to the above, on April 7,1977, uh.1*
Diesel Generator Building Sheet Metal Wora, uncer P$o?.d Change Request 2340.1R1, e',:sure covers were not which inpcces the requir-nen of QC 27-2, tbn str ' E fc,rm of drilling in place on the Diesel Generators and c-onteinKs ice inspector.
chips in the windings of the generator were < c.
Corrective Action Taken 790421e the Dieser Ge=er tor ve=aor h s see= c==t=ctea e inaicates hnt the senerster O
vil.1 be cleaned and inspected by the vendor's personnel as part of their standard start-up procedure.
M' j fjg
June 3, 1977 c @ OTTL Mr. J. P. O'Reilly Corrective Action Taken to Avoid Further Violations The Heating, Ventilating and Air Conditioning subcontractor (Sheet metal vori) has been notified by letter that the Construction Manager is to be notifie.d whenever work is to be performed above equipment which may be nants produced by the activity. The Construction Manager affected by contn i will assure that the necessary covering is provided.
Date that Co=pliance vill be Achieved Cc=pliance vill be achieved by July 1, 1977.
Very truly yours, J. G. Herbein Vice President JGH/RWH/a=g ec: Dr. Ernst Volgenau, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Co= mission Washington, D.C.