ML19199A367

From kanterella
Jump to navigation Jump to search
Ack Receipt of Re 761214 Rept of Design Deficiency in make-up Pump Pressure Switch.Matter to Be Reviewed During Subsequent Insp
ML19199A367
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/17/1977
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19199A368 List:
References
NUDOCS 7905010621
Download: ML19199A367 (1)


Text

..

~

UNITED S~ATES NUCLEAR R EGU LATO R Y COMMISSICN REGICN I

$31 PARK AVENUE KING cP PstV551 A. PENNSYLV ANI A 194C6 January 17, 1977 Metropolitan Edison Compiny Docket No. 50-320 Attention:

Mr. R. C. Arnold License No. CPPR-66 Vice President P. O. Box 5/-2 Reading, Pennsylvania 19603 Gentlemen:

Reference:

Report of Design Deficiency in Make-Up Pu=p Pressure Switch dated Dece=ber l', 197 6 Thank you for your letter dated December la,1976 which forcarded a report pursuant to 10 CFR 50.55 (e) regarding the above referenced item.

This matter will be reviewed during a subsr:quent inspection.

Your cooperation with us is appreciated.

Sincerely, r

hg M

Robert T. Carlson, Chief Reactor Construction and Engineering Suppcrt 3 ranch cc:

R. L. Wayne, QA Manager, Design & Construction T. M. Cri== ins, Jr., Safety & Licensing Manager R. W. Heward, Jr., Project Manager W. A. Verrochi, Vice President, Design a Construction Gerald Charnoff, Esquire Miss Mary V. Southrrd, Chair =an Citizens for a Safe Environ =ent q&,cuur:c, G,

~3

/

9 e

c i<

i e =

v m

M 2

s

,5s.,e+

V 0 0 5 01. 0 62,4

%y'%y -

t

(

sr< - )