NRR E-mail Capture - Acceptance of Submittal Post Shutdown Decommissioning Activities Report
ML19191A076
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 07/09/2019
From: Justin Poole
Plant Licensing Branch 1
To: Holden L
Exelon Generation Co
References
L-2019-LLL-0012
Download: ML19191A076 (3)


Text

NRR-DRMAPEm Resource From: Poole, Justin Sent: Tuesday, July 9, 2019 5:08 PM To: Holden, Leslie E.:(GenCo-Nuc)

Cc: Danna, James

Subject:

RE: ACCEPTANCE OF SUBMITTAL RE: POST SHUTDOWN DECOMMISSIONING ACTIVITIES REPORT (EPID L-2019-LLL-0012)

Leslie, As we talked yesterday, due to holding the 90 day notice in the Federal Register for public comments and the public meeting until after it was clear whether TMI would really cease operations or not, the NRCs now expects to complete the review of the PSDAR by November 2019.

Justin C. Poole Project Manager NRR/DORL/LPL I U.S. Nuclear Regulatory Commission (301)415-2048 From: Poole, Justin Sent: Friday, May 10, 2019 11:31 AM To: Holden, Leslie E.:(GenCo-Nuc)

Subject:

ACCEPTANCE OF SUBMITTAL RE: POST SHUTDOWN DECOMMISSIONING ACTIVITIES REPORT (EPID L-2019-LLL-0012)

SUBJECT:

ACCEPTANCE OF SUBMITTAL RE: POST SHUTDOWN DECOMMISSIONING ACTIVITIES REPORT (EPID L-2019-LLL-0012)

By letter dated April 5, 2019, Exelon Generation Company, LLC submitted the Post Shutdown Decommissioning Activities Report a for Three Mile Island Nuclear Station, Unit 1. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this submittal. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your submittal and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the submittal in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 610 hours25.417 days <br />3.631 weeks <br />0.836 months <br /> to complete. The NRC staff expects to complete this review by September 2019.

If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

1

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review.

Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

Justin C. Poole Project Manager NRR/DORL/LPL I U.S. Nuclear Regulatory Commission (301)415-2048 2

Hearing Identifier: NRR_DRMA Email Number: 98 Mail Envelope Properties (BL0PR0901MB3716912E861F4467B8CCB1FC9DF10)

Subject:

RE: ACCEPTANCE OF SUBMITTAL RE: POST SHUTDOWN DECOMMISSIONING ACTIVITIES REPORT (EPID L-2019-LLL-0012)

Sent Date: 7/9/2019 5:08:07 PM Received Date: 7/9/2019 5:08:00 PM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients:

"Danna, James" <James.Danna@nrc.gov>

Tracking Status: None "Holden, Leslie E.:(GenCo-Nuc)" <Leslie.Holden@exeloncorp.com>

Tracking Status: None Post Office: BL0PR0901MB3716.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3222 7/9/2019 5:08:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: