MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2019-10024 USER INFORMATION:
GERLACH*ROSEY M Address: NUCSA2 Phone#:
542-3194 EMPL#: 028401 CA#:
0363 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSEY M 06/20/2019 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
Page 1
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS
- '~OM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF
. tRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 06/07/2019 ADD MANUAL TABLE OF CONTENTS DATE: 06/19/2019 CATEGORY: DOCUMENTS TYPE: TRM2 of 2
UUll.
L..V,
..C::.U..L.:,
ID:
TEXT B3.7.3.4 ADD:
REV: 3 REMOVE:
REV:2 Page 2
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
of 2
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:
06/19/2019 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 99 01/03/2019
Title:
LIST OF EFFECTIVE SECTIONS dv<<;))
' ~
TEXT TOC 27 03/05/2019
Title:
TABLE OF CONTENTS TEXT 1.1 0
11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1
Title:
PLANT PROGRAMS AND TEXT 2. 2 11 01/3;::.2'ii~
Title:
PLANT PROGRAMS AND SETPOINTS I~STR,E~FP SETPOINT TABLE TEXT 3.0 7 ~<'fl$i1t
Title:
APPLICABILITY TECHNICAL<_f~~UI'REMiN:?FoR OPERATION (TRO) APPLICABILITY TEXT 3.1.1
~~9/2007
Title:
REACTIVITY CONTROL~SY.S~EMS~TICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATrfcAR,~D~** iN~RUMENTATION TEXT 3.1.2
~\\ ~
0 11/19/2002
/ /'
Title:
REACTIVI,TY<:ONTReJ:J;,-SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT
~
TEXT 3.1.3 5
12/18/2017
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 16 04/18/2019
Title:
CORE OPERATING LIMITS REPORT (COLR)
Page 1 of 15 Report Date: 06/20/19
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0
11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3
03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 11 07/21/2017
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 5
03/05/2019
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 2
11/10/2015
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INTENTIONALLY LEFT BLANK TEXT 3.3.9 3
05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 2
04/02/2019
Title:
WATER MONITORING INSTRUMENTATION Page 2 of 15 Report Date: 06/20/19
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1
04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1
04/16/2009
Title:
INTENTIONALLY LEFT BLANK TEXT 3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.4 2
05/14/2009
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1
04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 1
04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 2
03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT 3.5.2 2
03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT 3.5.3 1
03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 3
01/03/2019
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3 of 15 Report Date: 06/20/19
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 5
02/16/2017
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3
04/16/2009
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 4
05/16/2016
Title:
PLANT SYSTEMS CO2 SYSTEMS TEXT 3.7.3.4 2
04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2
04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2
04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1
04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 14 12/18/2017
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1,
04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Page 4 of 15 Report Date: 06/20/19
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1 1
03/05/2015.
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0
11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1
04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3
06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2
09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 9
03/05/2015
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 2
03/05/2019
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 2
04/29/2014
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 2
11/01/2018
Title:
PLANT SYSTEMS TEXT 3.8.1.
3 06/20/2012
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.l 2
11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2
12/14/2004 Page 5
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC of 15 Report Date: 06/20/19
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3 3
03/05/2019
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1
02/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 1
11/14/2013
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 3
03/05/2019
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2
10/22/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.l 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 1
03/12/2019
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1
04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2
06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 2
04/17/2009
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)
Page 6 of 15 Report Date: 06/2ri/19
SSES MANUAL Manual Name :
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.1 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3. 11. 1. 3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3. 11. 1. 4 2
10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3. 11. 1. 5 3
03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 4
03/12/2019
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11. 2. 2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE -
NOBLE GASES TEXT 3. 11. 2. 3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3. 11. 2. 5 4
- 07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 8
07/21/2017
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11. 3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE Page 7 of 15 Report Date: 06/20/19
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.1 4
03/05/2015
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3. 11. 4. 2 2
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0
11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4
04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 1
01/03/2019
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 1
01/03/2019
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1
12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM Page 8 of 15 Report Date: 06/20/19
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.7 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 6
03/05/2015
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.l 2
04/29/2014
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.l.2 0
11/19/2002.
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.l.3 4
12/18/2017
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 1
01/31/2014
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2
03/31/2011
Title:
INST~UMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2
11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 7
07/21/2017
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2
11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Page 9 of 15 Report Date: 06/20/19
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.6 6
03/05/2019
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 2
11/10/2015
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1
10/22/2003
Title:
INTENTIONALLY BLANK TEXT B3.3.9 4
01/03/2019
Title:
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 3
02/22/2012
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1
10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 1
04/02/2019
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1
04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 1
01/03/2019
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Page 10 of 15 Report Date: 06/20/19
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.6 2
01/03/2019
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.1 1
03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT B3.5.2 2
03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT B3.5.3 2
03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1
04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 4
02/16/2017
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2
04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11 of 15 Report Date: 06/20/19
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS.MANUAL UNIT 2 TEXT B3.7.3.3 0
11/19/2002
Title:
-PLANT SYSTEMS BASES CO2 SYSTEMS TEXT B3.7.3.4 3
06/19/2019
Title:
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1
04/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1
04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0
11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3
09/27/2012
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0
11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.l 0
11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0
11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP.TANKS TEXT B3.7.6 4
06/04/2013
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2
01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 12 of 15 Report Date: 06/20/19
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.8 4
01/31/2014
Title:
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 3
03/05/2019
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 3
11/01/2018
Title:
STRUCTURAL INTEGRITY TEXT B3.8.1 2
03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0
11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1
09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0
11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0
11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1
11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 4
03/05/2019
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2
06/04/2013
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM Page 13 of 15 Report Date: 06/20/19
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 1
03/12/2019
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1
04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.ll.1.l 1
05/10/2016
\\
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.ll.1.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.ll.1.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3. 11.1. 4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3. 11.1. 5 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.ll.2.l 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE Page 14 of 15 Report Date: 06/20/19 j
)
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
NOBLE GASES TEXT B3. 11. 2. 3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3. 11. 2. 4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 5
07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.ll.2.6 2
09/08/2016
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3. 11. 3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 5
03/05/2015
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4. 2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.ll.4.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1
10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1
12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 15 of 15 Report Date: 06/20/19
Rev. 3 Halon Systems B 3.7.3.4 B 3.7.3.4 Halon Systems BASES TRO ACTIONS The OPERABILITY of the fire suppression Halon systems is one part of ensuring that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water supply system, spray and sprinkler systems, CO2 systems, Halon systems, fire hose stations, and fire hydrants. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.
An OPERABLE Halon system will have storage tanks with at least 95%
of full charge weight and 90% of full charge pressure.
Any time a Power Generation Control Complex (PGCC) panel drawer is removed, the opening must be covered with a blank to keep the Halon System OPERABLE. Removal of any PGCC Floor panel or opening of any PGCC panel door causes the affected PGCC module Halon system to become inoperable if the floor panel or panel door must be left open and unattended or cannot be immediately closed.
The basis for those systems included within the scope of this TRO includes both Safety Related and Safe Shutdown system protection.
The Halon systems are described in FPRR.
The Actions are defined to ensure proper corrective measures and compensatory actions are taken in response to the inoperable systems or components.
Hourly Firewatch Patrols shall be completed once each clock hour.
Individual zones on the hourly firewatch patrol shall be toured at intervals (i.e. - zone A and back to zone A) of sixty minutes with a margin of fifteen minutes.
A Continuous Firewatch must remain in the specified area at all times and must patrol the required fire zones in the specified area at least once per fifteen minutes with a margin of five minutes. Areas exist within the plant where the posting of a firewatch does not provide acceptable radiological ALARA practices. For these inaccessible areas, alternate measures should be taken to assure an adequate level of fire protection is maintained.
(continued)
SUSQUEHANNA - UNIT 2
- TRM / B 3.7-8
Rev.3 BASES ACTIONS
( continued)
TRS REFERENCES Halon Systems B 3.7.3.4 The specified area can be as small as one fire zone or as large as a firewatch can reasonably patrol within the fifteen minute time period.
The specified area is limited to two floors of the Control Structure or Reactor Buildings. The floors must be adjacent or served by an operable elevator.
The TRSs provide assurances that the minimum OPERABILITY requirements of the fire suppression Halon systems are met. An allowance is made for ensuring a sufficient volume of Halon in the Halon storage tanks by verifying the weight and pressure of the tanks.
Tank level measurement may be used to confirm full charge weight when supported by engineering analysis.
The Surveillances are modified by a Note to indicate that when a system is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Upon completion of the test, or expiration of the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> allowance, the system must be restored to an operable condition, or the applicable Condition entered and 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Required Action(s) completed. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> allowance is a reasonable out 'at service time based on prior plant test performance. This allowance also does not result in an increased risk of a fire. Required Surveillances include those surveillances under other subsections of TRM 3.7.3.
TRS 3.7.3.4.3 The purpose of the flow test is to verify that there are no obstructions /
blockages in the Halon system headers or nozzles. The use of air or nitrogen is acceptable for use in the performance of the flow test.
- 1. FPRR Section 4.9 SUSQUEHANNA - UNIT 2 TRM / B 3.7-9