|
---|
Category:Graphics incl Charts and Tables
MONTHYEARML23234A0302023-08-22022 August 2023 2022 Distinguished Faculty Advancement Executive Summaries ML23234A0312023-08-22022 August 2023 2022 Fellowship Executive Summaries ML23234A0322023-08-22022 August 2023 2022 Scholarship Executive Summaries ML22048B5932022-04-12012 April 2022 Attachment -1 Table - EDG Trips Bypass at Various Plants Based on TSs and FSARs ML21285A2742021-10-12012 October 2021 Rev 2 Public Comment Table Courtesy Copy for ACRS Review ML20287A1982021-01-0101 January 2021 Public Comment Dispositions on DG-1370 for Regulatory Guide (RG) 1.191, Rev 1, Fire Protection Program for Nuclear Power Plants During Decommissioning ML20325A2092020-11-23023 November 2020 DG 5041, RG 5.76, Rev. 1 Comment Resolution Table NUREG-2233, EPRI 3002016054 Comments Resolution2020-03-31031 March 2020 NUREG-2233 EPRI 3002016054 Comments Resolution ML19175A0482019-12-19019 December 2019 Public Comments on Rg 1.180 NUREG-2178, Comment Resolution - NUREG-2178 Vol 2 Final2019-08-31031 August 2019 Comment Resolution - NUREG-2178 Vol 2 Final ML19162A4082019-06-13013 June 2019 01_03_Exercise_B Task 2 Steps 2 and 3 ML19162A3992019-06-13013 June 2019 01_04_Exercise_A Task 5 Steps 1_2 New Exercise ML19162A4002019-06-13013 June 2019 01_04_Exercise_C Task 5 MSO Analysis Generic Print Color ML19162A4032019-06-13013 June 2019 01_05_00 Task 7 Demo Methods Handout Print Color ML19162A4042019-06-13013 June 2019 01_05_Exercise_A Task 7 Cutset Analysis Print Color ML19162A4072019-06-13013 June 2019 01_03_Exercise_A Task 2 Step 1 ML19162A4092019-06-13013 June 2019 01_03_Exercise_C Task 2 Steps 4 and 6 ML19162A4102019-06-13013 June 2019 01_04_Exercise_A Task 5 Steps 1 and 2 ML19158A4792019-06-0707 June 2019 2019 Handouts Color 8 5x11 ML19158A4802019-06-0707 June 2019 2019 Student Ex Bw Mixed 8 5x11 and 11x17 ML19158A4922019-06-0707 June 2019 2019 Handouts Color 11x17 ML19158A4812019-06-0707 June 2019 2019 Student Solutions Color Mixed 85x11 and 11x17 ML18191B0472018-07-10010 July 2018 Licensing Basis and Backfitting Workshops - Summer 2018 - Case Studies and Potential Answers ML18144A5222018-06-0101 June 2018 Enclosure for 2018 Annual Report of Value Added to Staff Proposals as a Result of Review by the Committee to Review Generic Requirements (June 2017 Through May 2018) ML18138A4582018-05-31031 May 2018 DG-1327 Comment Resolution Table for Public Meeting ML17221A2462018-05-31031 May 2018 Response to Public Comments ML1017203222010-12-15015 December 2010 Staff'S Responses to Public Comment on DG-4017 ML0712301642007-05-23023 May 2007 Regulatory Guides Update Program - Phase 2 ML0712301782007-05-23023 May 2007 Regulatory Guides Not Planned to Be Updated by Dec 2009 ML0712301812007-05-22022 May 2007 Regulatory Guides Considered for Withdrawal ML0712301672007-05-10010 May 2007 Regulatory Guide - Phase 3 ML0712301742007-05-0202 May 2007 Regulatory Guide Phase 1 ML0501003432005-07-0707 July 2005 Technical Assistance Related to Auditing Vermont Yankee Containment Analysis for Evaluation of NPSH 2023-08-22
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
Step 4: Identify Equipment with Potential Spurious Actuations that May Challenge the Mitigating Capability to be Credited Considered Description PRA System or Function Comments/Disposition spurious equipment Possibly Affected operations MOV-13 PORV block valve MOV-16 AFW-A test line isolation valve MOV-17 AFW-B test line isolation valve MOV-19 AFW-C test line isolation valve MOV-3 Containment sump recirc. valve MOV-4 Containment sump recirc. valve AOV-1 PORV AOV-2 Letdown isolation valve AOV-3 Charging pump injection valve AOV-4 Atmospheric dump valve RHR-B RHR-B pump
Step 5: Identify Additional Mitigating, Instrumentation, and Diagnostic Equipment Important to Human Response Instrumentation Description Potentially Affected Human Comments/Disposition required to perform Failure Event in PRA model human actions LI-1 RWST level LI-2 RWST level LI-3 Containment sump level LI-4 Containment sump level LI-5 SG secondary level LI-6 SG secondary level TI-1 Letdown heat exchanger outlet temp PT-1 RCS pressure A-1 AFW-A motor high temp Step 6: Include Potentially High Consequence Related Equipment Equipment or combinations of Description of high consequence Comments/Disposition equipment that can cause high event consequence event