ML19135A353

From kanterella
Jump to navigation Jump to search
2020 Inspection Procedure 71124 Update 30 May 2019 Public Meeting
ML19135A353
Person / Time
Issue date: 05/30/2019
From: Matthew Smith
NRC/NRR/DRA/ARCB
To:
Smith R
References
Download: ML19135A353 (12)


Text

2020 Inspection Procedure 71124 Update Micheal Smith, Health Physicist NRR/DRA/ARCB micheal.smith@nrc.gov (301) 415 - 3763 May 30, 2019 ML19135A353

Agenda

  • Background - Radiation Safety Cornerstones Inspection Procedure
  • Inspection Procedure (IP) Update Process
  • Schedule Looking Forward
  • Feedback/Discussion
  • Comments and input from the public 2

Radiation Safety Cornerstones 3

Radiation Safety Oversight and Assessment 8 Radiation Safety Baseline Inspections (IP 71124) 4

Baseline Inspection Procedures IP Number Title (%PRS/%ORS)* Nominal Hours Inspection Samples 71124 Radiation Safety-Public Occupational N/A N/A 71124.01 Radiological Hazard Assessment and Exposure Controls (0%/100%) 36 +/- 4 (annual) 6 71124.02 Occupational ALARA Planning and Controls (0%/100%)** 46 +/- 14 (biennial) 4 71124.03 In-Plant Airborne Radioactivity Control and Mitigation (0%/100%) 16 +/- 4 (biennial) 3 71124.04 Occupational Dose Assessment (0%/100%) 20 +/- 4 (biennial) 4 71124.05 Radiation Monitoring Instrumentation (20%/80%) 32 +/- 4 (biennial) 2 71124.06 Radioactive Gaseous and Liquid Effluent Treatment (100%/0%) 35 +/- 4 (biennial) 5 71124.07 Radiological Environmental Monitoring Program (100%/0%) 29 +/- 4 (biennial) 2 71124.08 Radioactive Solid Waste Processing and Radioactive Material 34 +/- 4 (biennial) 5 Handling, Storage and Transportation (80%/20%)

    • Staff has proposed retiring this procedure (with transfer of some of its contents) as part of the ROP Enhancement effort 5

Inspection Procedure (IP) Revision Process

  • Identify which IPs need to be revised based on:

- Inspection experience

- Stakeholder feedback

- Programmatic reviews

  • Develop revised procedures through internal collaboration
  • Provide external stakeholders an opportunity to preview significant changes (July 23, 2019 public meeting)
  • Finalize IPs
  • Train staff, as necessary
  • Issue final IP 6

Items Under Consideration

- Changes are pending Commission decision

  • Effluent and Instrumentation Inspection

- Consider industry feedback from ROP Enhancement effort

  • Inspection Planning

- Explore approaches to lessen unnecessary burden on licensees while maintaining inspection scope

- Grouping of inspection requirements

- Developing Outage Procedure

  • Oversight of Part 37 7

Oversight of Part 37

  • Part 37 is applicable to power reactors

- Clarifications in RIS 2015-15

  • Oversight Experience

- Temporary Instruction (TI) 2800/041, Rev 1 was completed in Jan 2018

- RIS 2018-01 provides a listing of common violations cited during the first two years of Part 37 inspections

  • Staff is working to develop a risk-informed, performance-based framework for oversight of Part 37 requirements at power reactors
  • Considerations:

- Inspections and mechanisms for dispositioning performance deficiencies under the ROP

- Observations from TI 2800/041, Rev 1

- Insights from other Part 37 inspection activities

- Insights from dispositioning Part 37 issues

- Rulemaking effort 8

New Baseline Inspection Procedure Format

- Section 01 Inspection Objectives

- Section 02 Inspection Requirements

- Section 03 Inspection Guidance

- Section 01 Inspection Excerpt from IP 71111.08 - Inservice Inspection Activities Objectives

- Section 02 General Guidance

- Section 03 Inspection Samples 9

Looking Forward

- Draft revisions (Spring/Summer 2019)

- Feedback Public Meeting (July 2019)

- Final Procedures Published (December 2019)

  • ROP Enhancement SECY (June 2019) 10

Discussion/Feedback 11

Questions/Comments?

Micheal Smith, Health Physicist NRR/DRA/ARCB micheal.smith@nrc.gov (301) 415 - 3673 12