ND-19-0482, Vogtie Electric Generating Plant Unit 3 - ITAAC Closure Notification on Completion of ITAAC 2.3.04.11 (Index Number 338)

From kanterella
(Redirected from ML19123A310)
Jump to navigation Jump to search
Vogtie Electric Generating Plant Unit 3 - ITAAC Closure Notification on Completion of ITAAC 2.3.04.11 (Index Number 338)
ML19123A310
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/03/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ITAAC 2.3.04.11, ND-19-0482
Download: ML19123A310 (6)


Text

Michael J. Yox 7825 River Road Sk.Southern Nuclear Regulatory Affairs Director Vogtle 3 & 4 Waynesboro, GA 30830 706-848-6459 tel MAY 0 3 2019 Docket No.;52-025 ND-19-0482 10CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.3.04.11 findex Number 3381 Ladles and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter Is to notify the Nuclear Regulatory Commission (NRC)of the completion of Vogtle Electric Generating Plant(VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.04.11 [Index Number 338]

for verifying Valve FPS-PL-V101 exists and can connect the Fire Protection System (FPS)seismic standpipe subsystem to the FPS plant fire main. The closure process for this ITAAC Is based on the guidance described In NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC In Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice In the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted, Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.3.04.11 [Index Number 338]

MJY/GCW/sfr

U.S. Nuclear Regulatory Commission ND-19-0482 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company M . D. A. Bost(w/o enclosures)

M . D. L. McKinney (w/o enclosures)

M . M. D. Meier(w/o enclosures)

M . D. H. Jones(w/o enclosures)

M J. B. Klecha M G. Chick M M. J. Yox M A. 8. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. W.A. Sparkman Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Ms. K. M. Stacy Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reaulatorv Commission Mr. W.Jones(w/o enclosures)

Mr. F. D. Brown Ms. J. M. Heisserer Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. I. Cozens Mr. J. Gaslevic Mr. V. Hall Oalethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros

U.S. Nuclear Regulatory Commission ND-19-0482 Page 3 of 3 Westlnahouse Electric Companv. LLC Dr. L. Oriani(w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Ms. J. Monahan Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch BIngham

U.S. Nuclear Regulatory Commission NED-19-0482 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-19-0482 Enclosure Vogtle Electric Generating Plant(VEGP)Unit 3 Completion of ITAAC 2.3.04.11 [Index Number 338]

U.S. Nuclear Regulatory Commission ND-19-0482 Enclosure Page 2 of 3 ITAAC Statement Design Commitment

11. The FPS seismic standpipe subsystem can be supplied from the FPS fire main by opening the normally closed cross-connect valve to the FPS plant fire main.

Inspections/Tests/Analvses Inspection for the existence of a cross-connect valve from the FPS seismic standpipe subsystem to FPS plant fire main will be performed.

Acceptance Criteria Valve FPS-PL-V101 exists and can connect the FPS seismic standpipe subsystem to the FPS plant fire main.

ITAAC Determination Basis An inspection of the as-built Fire Protection System (FPS)system was performed to verify that a cross-connect valve exists and can connect the FPS seismic standpipe subsystem to the FPS plant fire main by opening the normally closed cross-connect valve (FPS-PL-V101).

An inspection (walkdown) was conducted to confirm that the cross-connect valve FPS-PL-V101 (labeled as 3-FPS-V101), exists and is connected to the FPS seismic standpipe subsystem and the FPS plant fire main as shown on Figure 2.3.4-1 of the Combined License(COL)Appendix C. Inspection Plan NCSP 02-24(Reference 1) was used to conduct the inspection, which involved visual observation that the cross-connect valve was installed in its specified location with the correct tag number, and that the associated piping was installed to provide a continuous flow path between the FPS seismic standpipe subsystem and the FPS plant fire main when the cross connect valve is opened.

The inspection results are documented in the Unit 3 Principal Closure Document(Reference 2) and confirm that a cross-connect valve exists and can connect the FPS seismic standpipe subsystem to the FPS plant fire main by turning the handwheel on the normally closed cross-connect valve (3-FPS-V101)and meets the ITAAC acceptance criteria.

Reference 2 is available for NRC inspection as part of the Unit 3 ITAAC completion package (Reference 3).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company(SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found that there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.3.04.11 (Reference 3)and is available for NRC review.

U.S. Nuclear Regulatory Commission NE)-19-0482 Enclosure Page 3 of 3 ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRG that ITAAC 2.3.04.11 was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References lavailable for NRG inspection)

1. NCSP 02-24, Rev. 2,"ITAAC Support Activities(API000)"
2. SV3-FPS-ITR-800338, Rev. 0."Unit 3 Inspection of Fire Protection System (FPS)Cross Connect Valve form FPS Seismic Standpipe to FPS Plant Fire Main"
3. 2.3.04.11-U3-CP-Rev0, ITAAC Completion Package