ML19108A296
| ML19108A296 | |
| Person / Time | |
|---|---|
| Issue date: | 05/03/2019 |
| From: | Kristine Svinicki NRC/Chairman |
| To: | Carper T, Whitehouse S US SEN, Comm on Environment & Public Works, US SEN, Subcomm on Clean Air & Nuclear Safety |
| R. Rihm, 415-1717 | |
| Shared Package | |
| ML19091A187 | List: |
| References | |
| CORR-19-0039, LTR-19-0134 | |
| Download: ML19108A296 (2) | |
Text
Attachment 2 Facility Location Owner/Operator Weather Event Cause Date of Event Additional Information*
Duration of Impact 6 Pilgrim Plymouth, MA Entergy Nuclear Operations Winter Storm Electrical fault caused by high winds and/or precipitation 12/19/2008 ML090570049 3 days St. Lucie 2 Jensen Beach, FL Florida Power & Light Ultimate Heat Sink (UHS)
Grassing Greater than expected influx of debris into intake 4/1/2009 ML091600364 3 days Salem 2 Hancock's Bridge, NJ PSEG Nuclear Cold/Icing Cooling water icing 1/3/2010 ML100640546 1 day Calvert Cliffs 1 Lusby, MD Exelon Severe Weather Water intrusion 2/18/2010 ML101530461 10 days Calvert Cliffs 2 Lusby, MD Exelon Severe Weather Water intrusion 2/18/2010 ML101530461 10 days Palo Verde 1 Wintersburg, AZ Arizona Public Service Co.
Severe Weather Water intrusion 3/7/2010 ML101330267 3 days Fermi 2 Newport, MI DTE Electric Company Tornado Loss of offsite power 6/6/2010 ML102230423 9 days LaSalle 1 1 Marseilles, IL Exelon UHS Temp Elevated heat sink temperature 8/12/2010 EN 46171
< 1 day LaSalle 2 2 Marseilles, IL Exelon UHS Temp Elevated heat sink temperature 8/12/2010 EN 46171
< 1 day Turkey Point 3 Homestead, FL Florida Power & Light Severe Weather Electrical fault caused by high winds and/or precipitation 9/23/2010 ML103340517 2 days LaSalle 1 Marseilles, IL Exelon Winter Storm Electrical fault caused by high winds and/or precipitation 2/1/2011 ML110890949 10 days Surry 1 Surry, VA Dominion Generation Tornado Loss of offsite power 4/16/2011 ML11178A032 6 days Surry 2 Surry, VA Dominion Generation Tornado Loss of offsite power 4/16/2011 ML11178A032 6 days Salem 1 Hancock's Bridge, NJ PSEG Nuclear UHS Grassing Greater than expected influx of debris into intake 4/21/2011 ML11172A108 2 days Browns Ferry 1 Limestone County, AL Tennessee Valley Authority Tornado Loss of offsite power 4/27/2011 ML11180A056 23 days Browns Ferry 2 Limestone County, AL Tennessee Valley Authority Tornado Loss of offsite power 4/27/2011 ML11180A056 27 days Browns Ferry 3 Limestone County, AL Tennessee Valley Authority Tornado Loss of offsite power 4/27/2011 ML11180A056 35 days Prairie Island 2 Welch, MN Xcel Energy Severe Weather Electrical fault caused by high winds and/or precipitation 5/9/2011 ML111810621 1 day Calvert Cliffs 1 Lusby, MD Exelon Hurricane Electrical fault caused by high winds and/or precipitation 8/27/2011 ML11297A113 4 days Millstone 2 Waterford, CT Dominion Generation UHS Temp Elevated heat sink temperature 8/12/2012 ML12285A229 11 days Waterford Killona, LA Entergy Nuclear Operations Hurricane Preemptive shutdown 8/29/2012 EN 48251 5 days Indian Point 3 Buchanan, NY Entergy Nuclear Operations Hurricane Electrical fault caused by high winds and/or precipitation 10/29/2012 ML13002A019 4 days Nine Mile Point 1 Scriba, NY Exelon Hurricane Electrical fault caused by high winds and/or precipitation 10/29/2012 ML13318A006 4 days Salem 1 Hancock's Bridge, NJ PSEG Nuclear Hurricane Greater than expected influx of debris into intake 10/30/2012 ML13002A004 3 days Oyster Creek 3 Forked River, NJ Exelon Hurricane Electrical fault caused by high winds and/or precipitation 10/29/2012 ML13190A465 1 day Pilgrim Plymouth, MA Entergy Nuclear Operations Winter Storm Electrical fault caused by high winds and/or precipitation 2/8/2013 ML13114A293 8 days Beaver Valley 1 Shippingport, PA First Energy Nuclear Operating Co.
Cold/Icing Cold weather impact on equipment 1/6/2014 ML14358A171 22 days Fort Calhoun Fort Calhoun, NE Omaha Public Power District Cold/Icing Cold weather impact on equipment 1/8/2014 ML14069A348 3 days Calvert Cliffs 1 Lusby, MD Exelon Winter Storm Water intrusion 1/21/2014 ML14080A309 4 days Calvert Cliffs 2 Lusby, MD Exelon Winter Storm Water intrusion 1/21/2014 ML14080A309 4 days Arkansas Nuclear One 2 London, AR Entergy Nuclear Operations Severe Weather Preemptive shutdown 4/27/2014 ML14177A307 17 days Donald C. Cook 1 Bridgman, MI Indiana Michigan Power Company Severe Weather Greater than expected influx of debris into intake 11/1/2014 ML14364A023 3 days Donald C. Cook 2 Bridgman, MI Indiana Michigan Power Company Severe Weather Greater than expected influx of debris into intake 11/1/2014 ML14364A023 5 days Pilgrim Plymouth, MA Entergy Nuclear Operations Winter Storm Electrical fault caused by high winds and/or precipitation 1/27/2015 ML15097A259 12 days Pilgrim Plymouth, MA Entergy Nuclear Operations Winter Storm Preemptive shutdown 2/15/2015 Power Status for 02/15/2015 3 days
Event Notification Reports (EN numbers), and Power Reactor Status Reports are all available on the NRCs Web site.
Facility Location Owner/Operator Weather Event Cause Date of Event Additional Information*
Duration of Impact 6 Byron 1 Byron, IL Exelon Cold/Icing Electrical fault caused by high winds and/or precipitation 3/3/2015 ML15121A035 6 days FitzPatrick Scriba, NY Entergy Nuclear Operations Cold/Icing Cooling water icing 1/23/2016 ML16083A504 7 days Brunswick 1 South Port, NC Duke Energy Severe Weather Water intrusion 2/7/2016 ML16104A391 6 days St. Lucie 2 Jensen Beach, FL Florida Power & Light Hurricane Preemptive shutdown 10/6/2016 EN 52280 8 days H.B. Robinson Hartsville, SC Duke Energy Hurricane Electrical fault caused by high winds and/or precipitation 10/8/2016 ML17054C345 3 days Surry 2 Surry, VA Dominion Generation Hurricane Water intrusion 10/9/2016 ML16350A101 4 days Pilgrim Plymouth, MA Entergy Nuclear Operations Severe Weather Preemptive shutdown 2/9/2017 Power Status for 02/10/2017 3 days Arkansas Nuclear One 1 London, AR Entergy Nuclear Operations Severe Weather High winds 4/26/2017 ML17177A314 22 days Turkey Point 3 4 Homestead, FL Florida Power & Light Hurricane Water intrusion 9/10/2017 ML17311A666 7 days Turkey Point 4 5 Homestead, FL Florida Power & Light Hurricane Water intrusion 9/10/2017 ML17311A666 7 days St. Lucie 1 Jensen Beach, FL Florida Power & Light Hurricane Preemptive shutdown 9/11/2017 Power Status for 09/12/2017 1 day Pilgrim Plymouth, MA Entergy Nuclear Operations Severe Weather Electrical fault caused by high winds and/or precipitation 1/4/2018 ML18079A105 7 days Brunswick 1 South Port, NC Duke Energy Hurricane Preemptive shutdown 9/13/2018 EN 53609 7 days Brunswick 2 South Port, NC Duke Energy Hurricane Preemptive shutdown 9/13/2018 EN 53609 9 days Salem 1 Hancock's Bridge, NJ PSEG Nuclear Cold/Icing Cooling water icing 1/31/2019 ML19091A260 3 days Notes 1 - LaSalle 1 commenced a shutdown required by technical specifications.
UHS temperature lowered and allowed unit to cease shutdown.
2 - LaSalle 1 commenced a shutdown required by technical specifications.
UHS temperature lowered and allowed unit to cease shutdown.
3 - Oyster Creek was already shutdown since it was in a scheduled refueling outage during this event.
4 - Turkey Point 3 completed a preemptive shutdown.
5 - Turkey Point 4 was manually shutdown during the event.
6 - Time the plant was not at 100% power because of the weather event.
Event Notification Reports (EN numbers), and Power Reactor Status Reports are all available on the NRCs Web site.