MEETING WITH THE INDUSTRY AND STAKEHOLDERS TO DISCUSS THE CUMULATIVE EFFECTS OF REGULATION AND FUEL CYCLE REGULATORY ACTIVITIES U.S. Nuclear Regulatory Commission Office of Nuclear Material Safety and Safeguards Division of Fuel Cycle Safety, Safeguards and Environmental Review April 2, 2019

Opening Remarks Michael King, Director Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards

Cumulative Effects of Regulation DyLanne Duvigneaud Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards 3

Updated Integrated Schedule Regulatory Activity Revised Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec

l

90-day comment 90-day comment Issue final rule l

l l

l l

49-day comment To Commission To Commission

l l

Issue final rule Part 73-Cyber Security Rulemaking

POC: Gary Comfort/James Downs l

l l

Driver: SRM-SECY-14-0147 90-day comment To Commission Issue final rule

l Issue final rule

l

l

RIC Session

= Reg. Basis/Draft Guidance

= Proposed Rule/Draft Guidance

= Final Rule/Final Guidance

= Public Interaction

= Implementation

= Non-rulemaking/NRC Activities

= Meeting occurrence l = Marks a milestone with text

= Change occurred below arrow http://www.nrc.gov/materials/fuel-cycle-fac/regs-guides-comm.html#cumeffects V = Site Visit A = ACRS Meeting 2021 03/27/2019 03/27/2019 2020 2019 03/27/2019 03/27/2019 03/27/2019 03/27/2019 Docket ID - NRC-2015-0179. Awaiting Commission direction.

RIC POC: Mollie Semmes Driver: Staff ANS 57.11 (ISA)

POC: April Smith Driver: SRM Part 73-Enhanced Security for SNM POC: Ed Lohr/Nick Baker Driver: SRM Docket ID - NRC-2009-0096 and Docket ID NRC-2013-0195 RIS - Clarification of Export Reporting Requirements POC: Hector Rodriguez Driver: Staff 03/27/2019 03/27/2019 Enhanced Weapons Rulemaking POC: Robert Beall/Nick Baker Driver: SRM Financial Assurance for Material Licensees (ISG)

POC: Kenneth Kline Driver: Staff Part 74-MC&A POC: Thomas Young/Tom Pham Driver: SRM Awaiting Commission direction.

Part 61 - LLW Disposal POC: Gary Comfort Driver: SRM Comments 2022 Commission directed staff to issue a supplemental rule for comment.

This rulemaking has resumed.

03/27/2019

5 Part 61 Proposed Rule: Low-Level Radioactive Waste Disposal

Contact:

Gary Comfort NMSS/MSTR/RPMB 301-415-8106 Key Information The final rule package was submitted to the Commission on September 15, 2016.

The Commission issued an SRM on September 8, 2017, directing the staff to issue a supplemental rule for comment.

Meeting Information June 2019 day comment period on supplemental proposed rule begins.

July 2019 - Public meeting to support comment period on the supplemental proposed rulemaking.

(Note: These dates are tentative. Additional public meetings will be conducted, as needed).

Regulatory Activity Revised Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec 2021 2020 2019 2022

l

90-day comment 12/12/2018 Part 61 - LLW Disposal POC: Gary Comfort Driver: SRM

l

90-day comment Part 61 - LLW Disposal POC: Gary Comfort Driver: SRM 03/27/2019

Part 73 Part 73-Enhanced Security for SNM 6

Key Information In April 2016, the Commission directed the NRC staff to suspend efforts on the Enhanced Security of SNM rulemaking. Later, the Commission directed staff to interact with DOE in order to share and discuss perspectives and ideas on the material attractiveness approach in the Enhanced Security of SNM Rulemaking. In August 2018, the Commission directed the staff to resume rulemaking with the exclusive scope of codifying the post 9/11 security orders.

The NRC published the draft regulatory basis on March 1, 2019. Public comments on the draft close on April 19, 2019.

Meeting Information None Scheduled.

Contact:

Edward Lohr NMSS/DRM/MRPB 301-415-0253

Contact:

Nick Baker NMSS/FCSE/FMB 301-415-7119 Regulatory Activity Revised Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec 2021 2020 2019 2022 90-day comment Issue final rule l

l l

l l

49-day comment To Commission To Commission Part 73-Enhanced Security for SNM POC: Ed Lohr/Nick Baker Driver: SRM 03/27/2019 Part 73-Enhanced Security for SNM POC: Ed Lohr/Nick Baker Driver: SRM 12/12/2018

Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Rulemaking 7

Key Information The final rule was sent to the Commission in May 2018.

The staff anticipates submitting supplemental Commission paper to the Commission in Spring 2019.

Meeting Information None scheduled.

Contact:

Robert Beall NMSS/DRM/RRPB 301-415-3874

Contact:

Nick Baker NMSS/FCSE/FMB 301-415-7119 Regulatory Activity Revised Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec 2021 2020 2019 2022

l l

Issue final rule 03/27/2019 Enhanced Weapons Rulemaking POC: Robert Beall/Nick Baker Driver: SRM l

Issue final rule 12/12/2018 Enhanced Weapons Rulemaking POC: Robert Beall/Nick Baker Driver: SRM

Part 73 Cyber Security Key Information

  • The proposed rule package was submitted to the Commission on October 4, 2017, as SECY-17-0099 (ML17018A218). The proposed rule package consists of the Commission paper, Federal Register notice (FRN), Draft Regulatory Analysis, Draft Backfit Analysis, and Draft Environmental Assessment.
  • The staff is awaiting Commission direction.

Meeting Information

  • May 2019 day comment period on proposed rulemaking begins.
  • June 2019 - Public meetings to support comment period on the proposed rulemaking.

(Note: These dates are tentative. Additional public meetings will be conducted, as needed).

8

Contact:

James Downs NMSS/FCSE/ECB 301-415-7744 Regulatory Activity Revised Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec 2021 2020 2019 2022 Part 73-Cyber Security Rulemaking

POC: Gary Comfort/James Downs l

l l

Driver: SRM-SECY-14-0147 90-day comment To Commission Issue final rule 03/27/2019 Part 73-Cyber Security Rulemaking

POC: Gary Comfort/James Downs l

l l

Driver: SRM-SECY-14-0147 90-day comment To Commission Issue final rule 12/12/2018

Part 74 Material Control & Accounting of Special Nuclear Material 9

Contact:

Thomas Young NMSS/MSTR/RPMB 301-415-5795 Key Information

  • On October 15, 2018, Draft Final Rule: Amendments to Material Control and Accounting Regulations (RIN 3150-Al61; NRC-2009-0096) was sent to the Commission and designated as SECY-18-0104.
  • The implementation period of 24 months was recommended to accommodate licensees that may choose to prepare revisions to their MC&A plans that would be submitted to the NRC for review and approval prior to implementation of the final rule.

Meeting Information

  • None scheduled.

Contact:

Tom Pham NMSS/FCSE/MCAB 301-415-7254 Regulatory Activity Revised Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov 2021 2020 2019 2022

l Issue final rule 03/27/2019 Part 74-MC&A POC: Thomas Young/Tom Pham Driver: SRM

l

Issue final rule 12/12/2018 Part 74-MC&A POC: Thomas Young/Tom Pham Driver: SRM

ANS 57.11 ISA Standard Key Information On November 14, 2018, the Working Group Chair presented the status of the draft standard to the Nonreactor Nuclear Facilities Committee (NNFC) of ANS.

The NNFC tasked the working group with submitting the latest draft of the standard to the NNFC with the goal of holding a first round vote by Spring 2019.

On March 16, 2019, the Working Group Chair submitted the latest draft to the working group for review and comment, after making revisions as requested per ANS formatting requirements.

Meeting Information ANS Consensus Committee meeting is scheduled for June 10, 2019. The standard may come to the committee at this time for first review.

10

Contact:

April Smith NMSS/FCSE/PORSB 301-415-6547 Regulatory Activity Revised Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov 2021 2020 2019 2022

03/27/2019 ANS 57.11 (ISA)

POC: April Smith Driver: SRM ANS 57.11 (ISA)

POC: April Smith Driver: SRM 12/12/2018

Financial Assurance for Material Licensees (ISG)

Key Information Comments on the draft ISG were submitted by October 5, 2018.

The final ISG is scheduled to be completed by April 2019.

Meeting Information

  • None scheduled.

11

Contact:

Kenneth Kline NMSS/DUWP/PAB 301-415-7075 Regulatory Activity Revised Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec 2021 2020 2019 2022

l 03/27/2019 Financial Assurance for Material Licensees (ISG)

POC: Kenneth Kline Driver: Staff l

Issue ISG 12/12/2018 Financial Assurance for Material Licensees (ISG)

POC: Kenneth Kline Driver: Staff

Draft RIS - Clarification of Export Reporting Requirements for Nuclear Facilities, Equipment, and Non-Nuclear Materials 12 Key Information

Public Interaction

  • None scheduled.

Contact:

Hector Rodriguez NMSS/FCSE/MCAB 301-415-6004 Regulatory Activity Revised Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec 2021 2020 2019 2022

l 03/27/2019 RIS - Clarification of Export Reporting Requirements POC: Hector Rodriguez Driver: Staff

l 12/12/2018 RIS - Clarification of Export Reporting Requirements POC: Hector Rodriguez Driver: Staff

RIC 13

Contact:

Mollie Semmes NMSS/FCSE/ECB 301-415-7486 Key Information

  • FCSE hosted five sessions during March 2019 RIC. The sessions descriptions can be found at the link below.
  • The RIC is held annually.

Related Documents

  • Link to the NRC public website on the RIC:

https://www.nrc.gov/public-involve/conference-symposia/ric/.

Meeting Information

  • The next RIC will be held in March 2020.

Regulatory Activity Revised Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec Jan Febr Marc April May June July Aug Sept Oct Nov Dec 2021 2020 2019 2022

RIC Session 03/27/2019 RIC POC: Mollie Semmes Driver: Staff

RIC Session RIC POC: Mollie Semmes Driver: Staff 12/12/2018

Summary Main Integrated Schedule and Supplement CER public website:

http://www.nrc.gov/materials/fuel-cycle-fac/regs-guides-comm.html#cumeffects 14