Letter Sequence Request |
|---|
EPID:L-2018-NEW-0000, Application Request for a Certificate of Compliance (CoC) for Holtec'S Model No. HI-STAR 100MB Type B(U)F-96 Transportation Package (Approved, Closed) |
Results
Other: ML18047A724, ML18047A725, ML18178A452, ML18178A453, ML18178A454, ML18192B758, ML18192B761, ML19058A444, ML19058A448, ML19079A005, ML19079A007, ML19079A009, ML19079A010, ML19151A482, ML19151A483, ML19221B655, ML19221B656
|
MONTHYEARML18047A7242018-02-16016 February 2018 International - Certificate of Compliance for Radioactive Material Packages Project stage: Other ML18047A7252018-02-16016 February 2018 International - Safety Analysis Report Project stage: Other ML18047A7232018-02-16016 February 2018 Application Request for a Certificate of Compliance (CoC) for Holtecs Model No. HI-STAR 100MB Type B(U)F-96 Transportation Package Project stage: Request ML18134A2062018-05-11011 May 2018 Letter to R. Ngwayah Request for Supplemental Information for the Review of the Model No. HI-STAR 100MB Package Project stage: Approval ML18134A2042018-05-11011 May 2018 Package: Request for Supplemental Information for the Review of the Model No. HI-STAR 100MB Package Project stage: Request ML18134A2052018-05-11011 May 2018 Enclosurequest for Supplemental Information (Letter to R. Ngwayah Request for Supplemental Information for the Review of the Model No. HI-STAR 100MB Package) Project stage: Approval ML18178A4542018-05-31031 May 2018 Enclosure 5: HI-STAR 100MB Safety Analysis Report, No. HI-2188080 Proposed Revision 1(Non-Proprietary) Project stage: Other ML18178A4532018-06-0101 June 2018 Enclosure 4: Updated Proposed CoC No. 9378 (Non-Proprietary) Project stage: Other ML18178A4522018-06-0101 June 2018 Enclosure 1: Responses to Rsis and Observations (Non-Proprietary) Project stage: Other ML18192B7612018-07-11011 July 2018 International - Responses to Rsi 3-2 and Observation 6-1 Project stage: Other ML18192B7582018-07-11011 July 2018 International - HI-STAR 1OOMB Resubmittal of Responses to NRC Rsi 3-2 and Observation 6-1 Project stage: Other ML19035A1162019-02-0404 February 2019 Letter to R. Ngwayah Request for Additional Information for the Review of the Model No. HI-STAR 100MB Package (W/Enclosure) Project stage: RAI ML19058A4442019-02-13013 February 2019 Enclosure 1: Holtecs RAI Responses Except for Criticality (Holtec Non-Proprietary Information) Project stage: Other ML19058A4482019-02-13013 February 2019 International, Submittal of RAIs Reponses Excluding Criticality for the Review of the Model No. HI-STAR 100MB Package Application Request Project stage: Other ML19079A0082019-03-14014 March 2019 Enclosure 2 to Letter 5026002_Summary of Proposed Changes_Non Proprietary Information Project stage: Request ML19079A0072019-03-14014 March 2019 Enclosure 1 to Letter 5026002_Holtecs Criticality RAI Responses_Non Proprietary Information Project stage: Other ML19079A0052019-03-14014 March 2019 International Submittal of Criticality RAI Reponses for the Review of the Model No. HI-STAR 100MB Package Application Request Project stage: Other ML19079A0092019-03-14014 March 2019 Enclosure 4 to Letter 5026002_Changes to the Proposed Coc_Non Proprietary Information Project stage: Other ML19079A0102019-03-14014 March 2019 Enclosure 5 to Letter 5026002_HI-STAR 100MB SAR Revision 1_Non Proprietary Information Project stage: Other ML19151A4832019-05-29029 May 2019 International - Submittal of the HI-STAR 100MB Safety Analysis Report Revision 2 Project stage: Other ML19151A4822019-05-29029 May 2019 HI-2188080, Revision 2, Safety Analysis Report on the HI-STAR 100MB Package Project stage: Other ML19179A0212019-06-28028 June 2019 Letter to B. Seawright Application for the Review of the Model No. HI-STAR 100MB Package - Updated CoC Issuance Schedule Project stage: Approval ML19221B6552019-08-0909 August 2019 Enclosure 1: Certificate of Compliance No. 9378, Rev. No. 0 (Letter to B. Seawright Certificate of Compliance No. 9378, Revision No. 0, for the Model No. HI-STAR 100MB Package) Project stage: Other ML19221B6562019-08-0909 August 2019 Letter to B. Seawright Certificate of Compliance No. 9378, Revision No. 0, for the Model No. HI-STAR 100MB Package Project stage: Other ML19221B6542019-08-0909 August 2019 Package: Certificate of Compliance No. 9378, Revision No. 0, for the Model No. HI-STAR 100MB Package Project stage: Request ML19221B6572019-08-0909 August 2019 Enclosure 2: Safety Evaluation Report (Letter to B. Seawright Certificate of Compliance No. 9378, Revision No. 0, for the Model No. HI-STAR 100MB Package) Project stage: Approval 2019-02-13
[Table View] |
Text
Summary of Proposed Changes (SOPC) for LAR 9378-0 Few additional changes are made to the HI-STAR 100MB SAR outside of the RAI responses in Revision 1 of the SAR. Below is a list of additional changes to the SAR. Additional minor editorial changes were made for clarity and consistency throughout the SAR. All changes in the SAR are marked appropriately with revision bars and listed in the SARs Summary of Revision section.
Changes to HI-STAR 100MB SAR Proposed Change #1 Revise Metamic-HT specific heat property value at 100°C in SAR Table 1.5.2 to reflect 832.3 J/kg-°C. The proposed change corrects an editorial inconsistency in the HISTAR 100MB SAR. However, due to this inconsistency, the thermal evaluation of the cask was performed using a specific heat of 823.3 J/kg-°C for 100°C. The proposed change will change this value to 832.3 J/kg-°C. Since the cask was evaluated at a specific heat lower than the changes value, the thermal evaluation will remain bounding/conservative.
Proposed Change #2 Remove Section 2.3.2, bullet point 7, paragraph 2. This paragraph of visual inspection of the internal surfaces is not an ASME Code NB requirement, and doesnt need to be performed.
Proposed Change #3 Editorial correction of the HI-STAR 100MB ASME code year references. The HI-STAR 100MB is designed to ASME Boiler & Pressure Vessel Code with the code year of 2015. To provide consistency throughout the SAR, the corrections are made in the SARs Reference Sections 1.7, 4.11, and 8.4.
Proposed Change #4 Editorial correction to the ASME article referenced in Section 8.1.5.5, Test (iv).2, for visual examination acceptance. This replaces a typographical error of the ASME Subsection NB Article 5362.
Proposed Change #5 Editorial correction to the ASTM E208 code year referenced in Table 8.1.5, Note 1. This editorial change made to align the ASTM E208 code year with the year referenced in ASME Section III, Subsection NCA, 2015 Edition.
Proposed Change #6 To provide clarity in the approved contents allowable cooling times, the format of Tables 7.7.6(a),
7.7.6(b), and 7.7.6(c) are revised. to Letter 5026002 Holtec Non-Proprietary Information Page 1 of 2
Drawing Change Log
[ PROPRIETARY INFORMATION WITHHELD PER 10CFR2.390 ] to Letter 5026002 Holtec Non-Proprietary Information Page 2 of 2