NRC-2018-000525 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed
ML19063B419
Person / Time
Issue date: 02/26/2019
From:
NRC/OCIO
To:
References
FOIA, NRC-2018-000525
Download: ML19063B419 (28)


Text

.

~

a

LES-17-00079-NRC

.l'1op1lata19 h1fu11natiu11

\ \1iHtlaold u11des 18 erR 2.988 Enclosure 1 2017 DOE Cost Estimate 1 *. -

Department of Energy

  • Washington, DC 20585 APR 21 2017 U'v-Y"1-0QOSO-D08 Mr. Jay Laughlin Chief N1iclear Officer and Head of Operations Louisiana Energy Services P.O. Box 1789 . .

Eunice, New Mexico 88231 D.er:1r Mr. Laughlin:

Thank you for your February 24, 2017, letter requesting a revised conversion and disposal cost estimate-for Depleted Uranium Hexafluoride (DUF6) generated by the URENCO Louisiana Energy Services (LES) centrifuge enrichment facility. The revision updates the previously provided estimate to LES ~ated May 19,. 2016.

The Department has incorporated the LES revised production estimates and included that volume of additional DUFG ip this updated cost estimate. We have also determined that the total cost of conversion contained in the w1certainty estimates/cost estimate range previously provided is still valid. Since the last estimate provided in*the May 19, 2016,.lettedCb)(4)  !(2016 dollars)], the ranJte has increased to (b)(4l (2016 dollars). Considering inflation, the updated estima~e range is (b)( 4l * (2017 dollars). This represents the best ayailable cost-estimate of the cost range to accept; process and dispose of LES DUF6 tails.

However, as the factors associated with this estimate are dynamic, they are subject to future adjustment.

If you have any questions or require additional infonnation, please contact Mr. Doug Tonkay, Director, Office of Waste Disposal, ?t (301) 903-7212"or.me at (301) 903-7514.

  • Sincerely, Mark-Send mg Deputy Assistant Secr~tary for Waste and Matenals Management

@ Printed wilh sciy ink on ~ecycle<l paper

LES-17-00079-NRC P1op1iat~1y h1fu11natiu11 IO'ilARIIIII WRll&r 18 QFR 2.986 Enclosure 2 Updated Decomrnissioning Funding Cost Estimate

P1opiiato1; hafe1W1aliaR

'Nitk~eld IIRder 19 QFR i!.998 OVERVIEW This document presents the cost basis for calculating the estimated sum total for decommissioning funding required for the Centrifuge Assembly Building (CAB), other non-Separations Building Module structures; Separations Building Module (SBM) 1001 (including extension), SBM 1003, 16 cascades of SBM 1005 and depleted uranium tails produced through June, 2018 at the URENCO USA Facility in 2017 dolla~.

When License Amendment Request Number 07-004 was approved by the NRC on March 14, 2008, LES received authorization .to sequentially fund'decommlssioning for facility structures as they are placed Into service, rather than at the receipt of licensed material as originally considered in the LES License Application. In order to sequentially fund decommissioning for the facilities as they* are placed into service, a review of the estimated costs and underlying assumptions*was performed in order to determine how to allocate any* necessary costs for decommissioning of the respective facilities. *Table 12 below (as supported by Tables 1 through 11) and its associated notes reflect Total Decommission~ng Costs to account for the decommissioning funds for the CAB, Other Buildings, SBM 1001 (including extension), SBM 1003, 16 cascades of SBM 1005 and depleted uranium tails estimated to be produced through June, 2018.

It has been determined since the previous submittals (Refs. 1 and 3) that the CAB will sufficiently house the decommissioning efforts and, therefore, the costs for a separate building that were included in the earlier sµbmittals have been removed. The decontamination equipment can be retrofitted to; use for (?oth centrifuge types (i.e., TC-12 and TC-21) in SBM 1001, 'SBM 1003 and S.BM 1005. Incremental capital costs to

.accommodate both centrifuge types have been included. Earlier submissions assumed costs for removal and disposal of liners and ~arthen covers of the Treated Effluent Evaporative Basin (TEEB). Current project plans do not include the construction of a TEEB. All radioactive liquid effluents will b~ treated through the Liquid Effluent Collection and Treatment System (LECTS). Baseline costs have been inflated 13.98%

by using the change in the CPI-U index from th~ 2009 average to the 2017 April ending value. This funding estimate.submission includes the decommissioning funding required as of June, 2017 to include the CAB, other non-~eparation~ Building Module structures, SBM 1001, SBM 1003, 16 cascades. of SBM 1OQ5 and depleted uranium tails produced through June, 2018. Note that the submission *provides the decommissioning funding

  • estimate to include all cascades of Assay 10051and four cascades in Assay 1006 that will be placed in service before December 31, 2018. License Amendment Request Number 15-10was approved June 8, 2016 to ajlow LES to provision decommissioning funding on a cascade basis. The requirement t<>; submit for NRC review; 6 months_ prior to feed inlet is not applicable as current funding covers all planned centrifuges to be taken operational in SBM' .1005. Decommissioning I fundin including the first four cascades of Assay 1006 ls estimated at a value tjf (b)(4) *.

Pr&1J!Retary l,ifeJW1elleP1

  • Withhold under 18 SFR iiMlll9 Table 1 Planning and Preparation* .

Costs * *. Labor

  • Labor Labor Activity Activity. (SOOO) *
  • Shift-worker
  • Project .. *BP&S *
  • Duration

_(multi-fnncti~) _Management (Man-days) (Months)

. (Man-days) . (!\fan-days) .

(b)(4)

  • Project Plan & Schedule
  • Site Characterization Plan Site Characterization .

Decommissioning Plan NRC Review Period Site_ Services Specifications Project Procedures TOTA(;

Note:

1. 100% of planning and preparation costs assumed to be utilized for the CAB and Other Buildings and Separations Building Module (SBM) 1001. SBM 1003 and SBM -1005 planning costs remain consistent with SBM 1001 costs.

Pre11ri11laP)' lnfeP1t1111le" Wil:liheltl 11"!1er 1g SlaR 3,agg Table 2 R~storation of Contaminated Areas on Facility Grounds (Work Days)

. "Labor * * 'l:,abor Labor Labor ,Labof Labor:

Acthity :Category Catcgoey Category eategor.y Category- Category*

J?ac~ll and Restore Sitl;l (Note 1) NIA. 'N/A NIA NIA N/A NIA Note:

1*. Previous *submissions assumed costs for removal and disposal of liners and earthen covers of the Treated Effluent Evaporative. Basin (TEEB). Current project plans do not include the construction of a TEEB, All radioactive liquid effluents "will be *treated through the Liquid Effluent Co11ection and Treatment System (LECTS). Based on URENCO experience, other areas outside of the plant buildings arc not expected to be contaminated.

Table 3 Final Radiation Survey

.. Activit)*

Costs Labor Labor l,;ibor

°Activity Shift-worker Project BP&S' Duration

. (SOOO)

(multi-functional) Managem.ent (Man-days) (Months)

.. (Man-days) (Man-days)

Prepare Survey Plans and Grid Areas (b)(4)

Collect Suivey Readings and Analyze Data Sample Analysis Final Status Survey Report and NRC Review Ci?nfinnatory Survey and Report Terminate Site License TOTAL Notes:

I. Thel(b)(4 ) !cost assigned to the preparation of the final radiation survey includes a cost od(b)( 4)  !

to conduct the sampling and perform the sampt anrrsis by a contractor. The sampling labor cost componen4fb\(4) !was estimated assumin (b)(4 (HP&S man-hour rate) for an estimated fb 4 with an average sample duration o ,1 amo c e analysis cost component b 4) for th (b)(4 samples was estimated using a conscrvativ (b )( 4) based on actual 2004 value of b) 4 lab analysis costs escalated*at~ecause of the modeling for this activity, this sample analysis cost is expressed in terms of equivalent man-hours at the Project Management man-hour rate.

i.. Some activities will be conducted in parallel during a 36 month radiation smYeyperiod for SBM 1001.

Subsequent SBM's have.assumed consistent treatment and timing.

  • Pre11rlelt") IRl'eAflelieR Wit~l:lelil 11Riler 1e SFR 2.aee Table 4 Site Stabilization and Long-Term Surveillance (Work Days)

Labor Labor ..;.bor* Lahcir Labor Labor Ac.tivity Categol')'.. Category _.Category Category -Category .. Category (Note I) ~IA NIA NIA NIA NIA NIA Note:

I; URENCO experience with decommissioning gas centrifuge uranium enrichment plants has been that there is no resultant ground contamination. As a result, site stabilization and long-tenn surveillance will not be*

required and associated decommissioning provisions are not provided.

Table S '.fotal Work.Days by Labor Category (Based on a 7.5 br "\_Vorking Day) .

  • Task

. *

  • Shift- .*craftsman

~

S~pervision . Project BP&S**

  • Cleaner worker . *.l\-1Bliageml,!nt.
  • (multi-functional) ..

Planning and Preparation (see (b){4)

Table I)

Decontamination and/or Dismantling of Radioactive Facility Components (Note I)

Restoration of Contaminated Areas on Facility Grounds (Note 2) (see Table 2)

Final Radiation Survey (see Table 3)

Site Stabilization and Long-Term Surveillance (seeTable4)

Notes:

1. The values shown ?fC inclusive of the Separations Building Module l 001 input derived using the total costs in Table 8 and dividing by the cost per day for each labor categoiy
2. Cost estimate is activity-based Table 6 Worker Unit Cost Schedule Shift--: . . * * *: .'

0

. .' - * *:P,toject.

  • :~abor*c?st~comp~u~~t worker *'; C.r~f'tsman
  • S1qferyisicm ' . ...

~-

  • Management * .. . BP&S...

~

': ..  ;. .(multi*. . *.-:*.' .*

  • *" ... 1 I

" functional).*, ~ ,, "\" . .~ .;

Salary & Fringe ($/hr) {b)(4)

Shift Charge ($/hr)

Total ($/hr)

Total (S/yr)

Total Cost Per Work Day (S/day) (Note 1)

Note:

1. Based on~ork days/yr at!._(b_l_(4_)_ _ _ ___,L
  • P1op1ielti1J l11fo1111atio11 Wllllhelel 1111eler 18 SFR 2.898 Table 7 Total Labor Costs by Major Decommissioning Task ($000)

,.. '., Task': * *. *. :. ': ':Sliirt-worRer* . Craftsman  ; ~ll~e~1~i91i" * *. ,* }rr~J.eci . .'.:: : 'J!P&S'::* * *:ele:i~:cr:'*.: *_-:-'Jotnl*; :i

'*;*:~-:;\,),:,*: ': ._; : :,I: : .' *.c~utti~ ' . :. . -*.::;'..,.; *,';'

-. . . *....,:..:. '* *... .functional).*

. <: . "*.:: . .'Management *. . . * . - . '. .<:Costs ...

. ' .' .:.:"*. .'.. **. ....:. , ... /*:. ':. . '.{ ;.'::-* .. : *: ....*. *. *.:,soiJOs);:

Planning and (b)( 4)

Preparation (see Table 1)

Decontamination and.for.

Dismantling of Radioactive Facility

.Components

  • Restoration of Contaminated Areas on Facility Grounds

<Note 1)(see Table 2)

Final Ra~iation Survey (see Table 3)

Site Stabilization and Long-T~nn Surveillance (see Table 4)

  • Note:
1. Cost estimate is activity~based.

Table 8 Packaging, Shipping, and Disposal of Radioactive Wastes (Excluding Labor Costs) a) Waste Disposal Costs (includes packaging and shipping costs)

  • . * . ., l . . . . . ', ** **. **, ... "*'*. * .* ," '*"a ',.*f I . . "* 1  : \ * \' * : * : * . ; , : \', '_r Disposid'volumc ,.. ; *. :*uiiit.Cost*(S/ft'j','.' .. .~~-},f:~(n'iiis :* '. .: * **Tot.aJ.1,)is~~s.iil. : ~

'.'... *.. l\13.'(ftlj' ...... : .; . ... .,.... : .'.' . ' : .... ' .: , . *: *. * *~ ..-.. . Cosis*csoilOs) ,*:,

_o_th_e_r_B_u....~-~-*n_gs_:_ _ _........._ _ (b)( 4)

Miscellaneous low level waste Separatio1_1 l\lodule 1001: --

Solidified Liquid Wastes Centrifuge Components, Piping and Other Parts Aluminum TOTAL --

b) Processing costs including melting Aluminum Other materials (b)(4)

TOTAL I

-Pflll'liDleP) IP1feM1atle,i

\\'iH ,held bt :dCJ 1e SFR !.:59~

I:

Table 9 Equipment & Supply Costs (Excluding Contajncrs)

~:~,~:,.~:::. ' . .*.

~ . . * :: -  ;,. * *

  • o
  • w\,-.,.-:.,.  !

~ . ..Q~n,ti~ ' : -*:. Unit.Cost . :.. Total Cost' * ,*

.:: **, ..CSLWJi.t),. * .* * .Equipme~tC$0'.Q6),'

  • * ** ' * * .1
  • , * ,i.. ** * *'

1--=-P_la:::n.tE=':i.On:::l:c;om=en:::t:.-.-----------+1<b)(4)

Basic decontamination eauipment Decontamination line equipment Evaooration installation Radiation and control equioment Electrical. and Instrumentation Electrical system lnstrumentation Desbm and Enitincerine Plant and cauinment Electrical and Instrumentation Mninten:mce of Eauloment --

Maintenance of facility equinment Other Bw1dinl!S Dismantling/Cleaning Tools, Equipment and Consumables

  • T0TAL(Note2) -

Note:

I. Allocation based on URENCO d~ommissioning experience. Jtiiic4>"1

2. Original submission included costs* for separate decommissioning buildi.ng for a total oti_____J Building costs have been removed due to the use of the CAB for decommissioning activ111es.

1 **.......

~

. . I t* _I *o *: '

' i } ;_** :,; *.,. *,.

. ,* .* ' .. ,I

... . *(bf.*supply ~otti1j * * .. *,. :** *. :. *. /tJnitCost . ,~o:tal c&t"Suppli *

    • * * . ,* I '  : ',,. *
  • :i ,. csooli> r :* *

......*-*_*.- - - - - - - - - - - * - '_.,._._._.*~.:._*.*----+.t"(b_)_(4_)....;.._ _ _ _ _ _....._ . ! -_ _ _.--i_ ._,{;f,,!.

Electricitv, kWh Gas, ft3 Water, fl3 Materials TOTAL Note:

1. Allocation based on URENCO decommissioning experience.

Preprieltll) lrtfe1Msll1111

\\'ill.I.eh! 11rteler 19 SFR 2.899 Table 10 Laboratory Costs (Internal)

't .... 1;

  • , : o ~~ ~ 0 ,* a ..

t ***

={  !~... )

ActMiY

. "*  :,. . ' : . *Qlian~t/ ."Unit.Cost Total *costs**,*.

) -

~ ($)' 'i ..,soitio*.*: . t:

Analyze Sampling Material (b)(4)

Mells (Note 1).

TOTAL ,__ __________ -- _,

Note: *

1. Sample analysis costs are for aluminum only. The unit cost for this sampling is the cost ofperfonning the analysis uspi.g.pnsite laboratory equipment, and assumes 8 samples for each of the estimated L..::Jbatch-melts.-Gosts.associaled..w.i.lh_Q!b..Cl!.______ ~ )( 4) sampling and analyses are included in Table 3, Final Radiation Survey. ----

Table 11 Period Dependent Costs

,*,:.-TotdCost'. :'*

.. .-:csoilo) .

.License Fees Insurance

  • (b)(4)

Taxes Decommission Facility -

'J..:OTAL Note:

1.
  • Period Dependent Costs include management, insurance, taxes, and other costs for the period beginning with the termination of operations of Separations Buildinfi Module 1001 and the remaining J)lant facilities. This assumcs!(b)(4) _per year for each ofthef(b)"lotal year decomm1~s1ompg period ~

Tablo 12. Total Docommlsslonlng Costs r ole

~~~c~~po~~n~~.

Planning and Preprepara!lon (see Table 1)

. CAB and Other :ssM 100j Total Cost Btilldi(lgs Cosis *

  • Cos.i * ' 2<109

. * ($000)"

(b)(4)

.. * . (SOOO) (SOOO)

Adjustments SBM 1003

($000) * * *($000)

-SBM 1005 16 ...

Cascades. . ..tnflallori .** *

(SOOO) (13.98%) Produ"ct / Tails I I,,,

.:rotal Cost. * * * *

(SOOO) . . Notes .

Decontamination and Dlsmantllng of Radloactil.e Facmty Components (see Table 7)

Restoration of Contamination Areas* on Facility Grounds (see Table 2)

Final Radiation Suney (see Table 3)

Cost of.lhlrd Party Use Site Stabilization and Long-term Surwillance Waste Processing Costs (see Table 8b)

Waste Dlsposal Costs (see Table Ba)

Equipment Costs (See Table 9a) \

  • supply Costs (see Table 9b)

Laboratory Cost_s (see Table 10)

Miscellaneous Costs (see Table 11)

Subtotal 4

Trans ortation of an filled (b)( ) olfslte (Maxi~um or (b)(4) onslte through June, 2018)

Tails Disposition (Total figure Includes SBM 1001, 1003 and SBM 1005 tails produced through June, 2018) l76TI4i1 ConlingencyL:....J New Mexico Settlement Contingency Total

Notes:

4 Thel(b)( l hncludes planning, site characterization," Decommiss;oning Plan preparation and NRC review for the CAB *and Other Buildings and Separations Building Modules. SBM 1003 and prorated SBM 1005 costs are consistent with SBM 1001 costs.

2. Earlier submissions assumed costs for removal and disposal of.liners and earthen covers of.the Treated Effluent Evaporative Basin (TEEB). Current project plans do not includ~ the construction of a TEEB. All radioactive liquid effluents will be treated through the Liquid Effluent Collection and Treatment System (LECTS). \_
3. TI1c Final Radiation St1rvcy, NRC review, confil'!llatory surveys nnd license termination for the entire plant arc included in this total.
4. Site stabilization and Iong-tenn surveillance will not be required.
5. Waste processing costs are based on (b)( 4l Waste processing costs for SBM 1003 and prorated SBM 1005 arc {b)(4) over SBM 1001 levcls based on the ratio oftotal TC21 centrifuge length in SBM 1003 and SBM 1005 to TC12 lerigth_in SBM 1001.

.: r)(4) .

_(b)(4)

7. Approximatel)~ofthc decommissioning costs for the CAB, Other Buildjngs, and SBM 1001, 1003 and prorated 1005 are attributed to the dism~tling, decontamination, processing and disposal of centrifuges and other equipment in SBM 1001, SBM 1003 and SBM 1005, which are considered classified. Gi\*en the classified nature of these buildings, the data presented in these Tables have been struc.turcd to *meet the applicable NUREG-1757 recommendations, to the extent practicable. However, specific information such as numbets of components and unit rates has been intentionally excluded to protect the classified nature of the data. Tire rcmaininglftinofthc decommissioning costs arc for tbc remaining systems and components in the CAB and Other Buildings. ~ * .
8. The!(b)( 4) !ror Other Buildings includes the deeo9taminatir and dismantlin -of contaminated equipment in the Blending and Liquid Sampling.Area, Centrifuge Test ~nd Post Mortem Facilities and Gaseous Effluent Vent System. Thel_(b)(4) _for SBM 1001 (b)(4) for SBM 1003 and (b)(4) for SBM 1005 include decontamination and dismantling of the centrifuges, components and other equipment SBM 1003 and prorated SBM 1005 costs are (b)(4) . The adjustments column reflects!(b)(4 jofdecontarnination and dismantling costs associated with LECTS components.
9. Obtained a letter from the De artment of Energy confirming 2017 cost to deconvert and dispose of depleted uranium tails. Estimated the amount of depicted uranium produced through June, 2018 at approximate!) / ) assu ing operational tails assay in line with contractual obligations and operational planning. DOE has provided a 2017 disposal value for DUF6 of1I6I1IM*hcn_converted equals (b){4) DU. Addltionnll , the DOE has communicated that transportation from LES to the deconversion site is not included in the rate and a l(t)i(4il per kg rate (2015 dollars) has been added and inflated b (b)(4) to include inflation to 2017 dollars. The combined 2017 DOE rate plus transportation isl<b)(4) !per kg. TI1e~tails

~missioning value also includes a!(b)(4lper kg DU contingency as specified by the settlement agreement with the State of New Mexico and has been excluded from the (b)(4) contingency.

10. Combined total for both decommissioning and tails disposition.
11. As communicated in the last submi s*on. t 1is u da e c nti ues i.m:J~JtdJ!n_d.nr.!ill! argin for third parties in the rates embedded in the individual line items. Th~ updated rates used in the estimate were based on (b)(4) , third party US suppliers in 2009 or escalated using the Gross Domestic Pr?duct Implicit Price Deflator from 2002 to 2009 (i...e-,,..b-(4---------....-an--.""th_e_a_v_er-ag-e-C""o_n_s..,..umer Price Index (CPI-U) for 2009*April 2017 (an additional 13.98%). .
12. (b)(4)

(b)(4)

13. Supply costs include electricity, gas, water. and materials for decommissioning.
14. Laboratory costs nre attributable to analysis of batch samples which are for aluminum only per Note I for Table I 0.
15. Period dependent costs include management, insurance, taxes and other costs for the period beginning with the *termination of operations of the CAB ilnd Other Buildings, as* well as SBM 1001, SBM 1003 and SBM 1005. * .. . . .

. ~ .

16. Transportation cost is an estimate to rcmovcl!::LJproduct cylinders from the LES site in the event of decommissioning. Based on cui:rent operational estimates, there will be a maximum of

!{b )( 4) ~roduct cylinders onsitc between 7/1/17 and 6/30/18. The assumed freight rate isHb )( 4) !based on a blended average of base transportation charge to fuel

  • fabrication sites plus additional fuel and driver detention surcharges. .

./

i

LES-17-00079-NRC P1op1icta11 lnfeffflsleA

\MM .I 1old 011de1 16 6FR 2.3!0

- .... Enclosure 3 l(b)( > ISurety Bond Rider

LES-17-00079-NRC P1op1lem,, h1fofft'u~tieR 1Mlbbola UAQQF 1g*,;i.:i;;i 2.aQQ Enclosure 4 Draft~ Letter of ~redit

LES-17-00079-NRC Press1 ietar; IRfeFMatleA WiH.l,old a11da1 18 eFR !.390 Enclosure 5 Draft Amended Standby Trust Agreement

Proprielary lnformalion Withhold under to CFR 2~90 Schedule A Costs of Decommissioning This Agreement demonstrates*financial assurance for the following cost estimates or prescribed amounts for the following licensed activities:

COST ESTIMATES FOR U.S. NUCLEAR REGULATORY REGULATORY NAME AND ADDRESS ADDRESS OF ASSURANCESS COMMISSION OF LICENSED DEMONSTRATED BY THIS LICENSE NO. LICENSEE ACTIVITY AGREEMENT Louisiana Energy Services, URENCOUSA l(bl(4)

SNM-2010 LLC formerly known as P .0. Box 1789 National Enrichment Eunice, NM 88231 Facility located Five miles east of Eunice, New Mexico On Highway 176 in Lea County, New Mexico

, The cost estimates listed here were last adjusted as of XXXX~. 2017.

Proprietary lnformalion Withhold under IO CFR 2.390 Schedule B Payments Constituting the Fund 4

PROPERTY AND AMOUNTS._l(b-)(_ >_ __.

AS EVIDENCED BY (b)( 4) ~ond N0Jb)( 4) !in the amount o~...(b_><_4 _> _ _ _,!and!(b){

4

) koc

LES-17-00079-NRC F'iop1lel'a1g haferfMtkiRi

'0~11:il:uallil wRliler 19 ;IPR a.i!99-Enclosure 6 Draft Certification of Financial Assurance

- - - - - - - - (---- -*--*---------------------------------

DRAFT CERTIFICATION OF FINANCIAL ASSURANCE Principal: Louisiana Energy Services, LLC 275 Highway 176 P. O. Box 1789 Eunice, NM 88231 License Number SNM-2010 Issued to: U.S. Nuclear Regulatory Commission I certify that Louisiana Energy Services, LLC is licensed to possess the following types of Source and/or Special Nuclear Material and/or By-product Material licensed under 10 CFR Parts 30, 31, 32, 3~. 34, 35, 36, 39, 40 and 70 in the following types and amounts: *

  • Type of Material Amount of Material Uranium (natural and (b)(4) depleted) and daughter oroducts Uranium enriched in Isotope U-235 and ,

uranium dauohters Americium-241 (sealed)

Americium-241- ..

/

(unsealed)

Barium-133 (sealed)

Califomium-252 (sealed)

Cesium-137 (sealed)

Cesium-137 (unsealed)

Cesium-139 {sealed)

  • Cesium-139 {unsealed)'

Cobalt-60 (sealed)

Cobalt-60 (unsealed)

Eurooium-152 {sealed)

Polonium-210 (sealed)

Polonium-210 (unsealed)

Strontium-90 (sealed)

,. Strontium-90 *(unsealed)

Technetium-99 * .. IS Technetium-99 (sealed)

Thorium-230 (sealed)

Thorium-230 (unsealed)

Uranium-232 (sealed)

Uranium-232 (unsealed)

Uranium-233 (sealed)

Uranium-233 (unsealed)*

Uranium-234 {sealed)

Uranium-234 (unsealed}

Uranium-235 {sealed)

Uranium-235 (unsealed}

Uranium-236 sealed Uranium-238 sealed Uranium-238 unsealed I. also certify that financial assurance in the amount ot!(b)( 4) Ihas been obtained for the purpose of decommissioning as prescribed by 10 CFR Part 70.

Stephen Cowne Chi13f Nuclear. Officer and Compliance Manager Corporate Seal and Date

i LES-17-00079-N RC Proprietary Information Withhold u~der 19 CFR 2~390 Enclosure 7 AFF.IDAVIT I, Stephen Cowne, Chief Nuclear Officer'and Compliance Manager for Louisiana Energy

  • Services, LLC (LES) at the URENCO USA Facility, make the following representations that to the best of my knowledge and belief:-
1. LES wishes to have withheld *trom public disclosure the following documents:
  • Enclosures 1 through 6 to LES-17-00079-NRC-Annual

. . Decommissioning Cost Estimate and Proposed Financial Assurance Instruments 2-. The information contained in this correspondence and enclosures is proprietary information related to commer_cial and financial aspects of the URENCO USA Facility, including the business strategy of LES. LES requests that this information be exempt from disclosure pursuant to the provisions in 10 CFR Part 2.390(a)(4). *

3. Public disclosure of the information in this submittal has the potential to result in substantial hal'fT! to the competitive position of LES, provide valuable business information to competitors of LES which they could_ duplicat~ without having fo expend their own resources to develop, and reduce or foreclose the availability of profit opportunities. *
4. The information stated in this affidavit has been submitted in accordance with the applicable parts of 10 CFR 2.390 and the guidance contained in NUREG-1556, Vol. 20, Appendix C.4.

~ . ~- . bl;z7/J7

'Steph Cowne - . " Dai c~~nceManager Louisiana Energy Services, LLC *

URENCO USA Facility I certjfy Jt?_e above named person appeared before me and executed this document on this 2i
_day of June, 2017_.

~AN,,,.~~ .

NotaPublic ~

  • My commission expires: lilen I lt I~~\