Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth. Texas 77483 February?, 2019 NOC-AE-19003624 10CFR50.55a U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Unit 1 Docket No. STN 50-498 Inservice Inspection Summary Report-1RE21 Attached is the South Texas Project Electric Generating Station Unit 1 summary report for inservice inspections performed prior to and during scheduled refueling outage 1RE21 completed in November 2018. This summary report satisfies the reporting requirements of American Society of Mechanical Engineers ASME Code Section Xl, Article IWA-6230.
There are no commitments in this letter.
If there are any questions regarding this report, please contact Wendy Brost at (361) 972-8516 or me at (361) 972-7806.
- ^c<
"Christopher Georg^son Manager, Design Engineering web
Attachment:
Summary Report for 1RE21 Inservice Inspection of Unit 1 South Texas Project Electric Generating Station STI:34799132
NOC-AE-19003624 Page 2 of 2 ec:
(paper copy)
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (09E01) 11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 Wadsworth.TX 77483
NOC-AE-19003624 Page 1 of 8
SUMMARY
REPORT For 1RE21 INSERVICE INSPECTION Of UNIT 1 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Nuclear Operating Company STP NUCLEAR OPERATING COMPANY 04/29/17-11/11/18
NOC-AE-19003624 Page 2 of 8 COVER SHEET 1RE21 INSERVICE INSPECTION
SUMMARY
REPORT SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 1 P.O. BOX 289 WADSWORTH, TEXAS 77483 USNRC DOCKET NO: 50.498 OPERATING LICENSE NO: NPF-78 COMMERCIAL OPERATION DATE: AUGUST 25,1988
<$Ws^
Lanlz, ISITrogram Engineer
^
Prepared bv: C^W^^ _ Date ^FeSWf Erie Lanlz, ISITrogram Engineer Reviewed by: /^//^ 7 _ Date 2/4/Wf Brian IVIigl^upervisor, /Testing Programs f
NOC-AE-19003624 Page 3 of 8 SCOPE COMPONENT SUPPORTS, REPAJR/REPLACEMENT ACTIVITIES, SYSTEM PRESSURE TESTS, CONTAINMENT METAL LINER, AND WELD INSPECTION PROGRAMS (IWB, IWC, IWD, IWF, IWL}
The examinations summarized in this report were perfQrmed in accdrdance with Ihe 2004 Edition of the ASME Cocte, Section Xl that is applicable to the South Texas Project. Unit 1, third 1an-year interval (09/25/2010-09/24/2020), third period (12/20/2017-09/24/2020). This repQrt covers selected ASME Code Class 1, 2, and 3 Systems/Comppnents. This report is documented in accordance with the requirements of ASME Section Xl Code Case N-532-4, Examinations and tests required by the Code are scheduled in accordance with "Inspection Program B" as defined In 1WB-2412 for ASME Code Class 1 Systeme/Components, IWO-2412forASME Code Class 2 Systems/Componehts, IWD-2412 for ASME Code Class 3 Systems/Components, ^nd IWF-2410 component supports, ASME Code Class 1 components were examined as prescribed by Table IWB~2500-1 and the applicable Examination Categories, which established the examinatJQn frequency at each refueling outage. The ASME Code Class 2 Systems/CQmponents were examined in accordance with Table IWC-2500~1, Examination Categories, The ASME Code Class 3 Systems/Components were examined in accordance with Table tWD-250Q-1, ExaminatiQH Categories. Gomponent Supports were examinecl in accordance with IWF-Table 2500-1, Examination Categories.
The Containment Tendon Test / End Anchorage and Adjacent Concrete Inspection was perfQrmed in accordance with the 2004 Edition bftheASNE Code>> Sedion Xl, Subsection IWL as sypplemented and modified by 10CFR50.55a(b)(2)(viti).
NOC-AE-19003624 Page 4 of 8 TORMOAR-l OWNER'S ACTTV1TY REPORT (Code CaseN-532-4)
ReportNumnber_OAR-1.RE21, Plant_South Texas Project Electric Generating Station Unit No, I
_ommerGiaI service date August 25,1988 (If applicable)
Current inspection rntem! IWB. WC. IWD. IWF-3hi__: WE -3n{.
(lst,2>>(I,3M4tb^her) purreot inspedion period IWB, IWC. IWD. IWF - 3rd ^
jtefueling outage no, 1HJS21
<!5V?nd,3rf)
,2Q04Edition_
Edition and Addenda of Section XI applicable to the inspection plan Bate and revisioa ofmspection plan^ Revision 8 Effecdve date: 02/27/2018 Edition and Addenda of Section. XI applicable to rejpairs/replacement activifies, if different than fh.e iAspection plan N/A Code Cases used: N-46D< ?532-4< N-578-1. N-706-l< ?729-4 N-770-2, N-722-1 _
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspectipn Plan as required by the ASME Code,Section XI; and (e) the repair/replacement activities and evaluaticms supporting the cQmpletion of
_1RE21_ conform to the requirements of Section XI.
(RNueIing outage number)
Signed mC_t^T^
^6 T^,ar>{-maa 1T^-
(Owner of Owner^Designee, Title]
ISIProsram Engineer Date: January :30,2019 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holdirig a valid commission issued by the National Board of Boiler and pressure Vessel Inspectors and the State or Province of
_T^as__^_ and employed by_ABS Boiler & Marine Insurance Co>__ of__Hou?t<3n, Texas^^.have ins^cted the items described m this Owner's A.cfivity Report, and state that, to the best of my knowledge and belief the Owner Ns perfoFmed all activities represented by this report in accordance with the requirements of Section XL ;:
fiy signing this certificate neither the Inspector nor his employer.makes my warranty,, expressed pr implied, concemmg the repairs/
replacements activities and eyalyatlpn described this report, Furtliennore., neither the inspector nor his employer shall be liable ift my manner for any personal mjury or property damage or alossofanylcind arising j&om the connected with this inspection.
^^.^^^<^ yijF'y-5^
actor's Signature
[^%i
'^^^D^
Natfonal Board, Slate, Province, andBhdoKiements
NOC-AE-19003624 Page 5 of 8 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE 1RE21 FALL 2018 Examination Category N/A Item Number N/A Item Description N/A Evaluation Description N/A NOTES:
1, No items with flaws or relevant conditions that required evaluatlQn for continued service were found during 1 RE21.
NOC-AE-19003624 Page 6 of 8 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 1RE21 FALL 2018 Code Class 3
3 2
2 T
3 3
3 3
3 3
3/NF 3
3/NF 311 Corrective Measure REPLACEMENT REPLACEyENT REPLACEMENT REPAIR REPLACEMENT REPLACEMENT REPAIR REPLACEMENT REPLACEMENT REPLACEMENT REPLACEMENT REPAIR REPLACEMENT REPLACEMENT REPAIR.
Item Description VAWE VALVE VALVE VAD^/E VALVE VALVE VALVE VALVE PIPING PIPING PIPING SUPPORTS PIPING PIPING FLANGES Systerft ESSENTIAL COOLING WATER CHILLED WATER MAIN STEAM VAIN STEAM STARTINGAIR ESSENTIAL COOLING WATER ESSENTIAL COOLING WATER ESSENTIAL COOLING WATER ESSENTIAL COOLING WATER ESSENTIAL COOLING WATER ESSENTIAL
/COOUN3 WATER ESSENTIAL COOLING WATER ESSENTIAL COOLING WATER ESSENTIAt COOLING WATER ESSENTIAL COOLING WATER Description of Work Replaced Valve At EWR/6935 Replaced Valve 3VH1TCH0590 Refurbish 3Q" Valve, Replaced stem Assembly.
Refurbish 30" Valve. Replaced stem Assembly and Studs.
Replaced Valve 3Q1 B1XSD0007C Replaced Valve 3R281TEW0079 Refurbished and returned to warehouse.
Replaced Vatve B1EWR/%36 Removed Range to use under WAN 556955.
Replaced pipe and fitting. ASME Welds.
Reworked pipe supports. ASME Weldgi.
Replaced pipe and fittinQ. ASME Welds.
Replaced pipe and fitting. ASME Welds.
OVERLAY FLANGES WITH ALUMINUM BRONZE.
Date Completed 6/21/2018 6/20/2017 11/2/2018 11/2/2018 6/5/2017 6/6/2017 10/4/2017 7/2772017 7/13/2017 10/26/2017 10/26/2017 10/26/2017 10/26/2018 10/^6/2017 3/22/2018 Repair/Replacemenf Plan Number 1-15-063 1 *.16-028 1-16-031 1-16-032 1-17-012 1-17-016 1-17-017 1-17-018 1-17-019 1-17-021 1-17-022 1-17-023 1-17-024 W7-02S 1-17-026
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTMTIES REQUIRED FOR CONTINUED SERVICE 1 RE21 FALL 2018 NOC-AE-19003624 Page 7 of 8 Code Class 3
3 3
1 3
a 3
3:
3 2
2 1
1 1
Corrective IVIeasure REPLACEMENT REPLACEMENT REPLACENENT REPLACEMENT REPAIR REPLACEMENT REPLACEMENT REPLACEMENT REPAIR REPLACEMENT REPLACEMENT REPLACEMENT REPLACEMENT REPLACEMENT Item Description PIPING FASTENER8 PIPING SEAL PACKAGE PIPING PIPING PIPING PIPING PIPING VALVE VALVE VALVE VALVE VALVE System ESSENTIAL COOLING WATER CHILLED WATER COMPONENT COOLING REACTOR COOLANT ESSENTIAL COOUNG WATER ESSENTIAL COOUNG WATER ESSENTIAL COOLING WATER ESSENTIAL COOLING WATER ESSENTIAL COOLING WATER MAIN STEAM MAIN 8TEAV REACTOR COOLANT REACTOR CDOLANT REACTOR COOLAMT Description of Work Replaced Piping, ASME Welds.
Replace Fastehers N10HPSV9508 Replaced piping, ASME Welds.
Replaced CARTRIDGE SEAL PACKAGE.
A8ME, Welds, Replaced ptping/fittings.
Replaced plplng/fittings.
Replacect plpIng/TOngs.
Reworked pipe supports.
Replace Code part (Pilot Poppet).
Replace: Code part (Pilot Poppet and stud/boltlng).
Replaced 6" PZR Safety Valve N1RCP8V345D Replaced 6" PZR Safety Valve N1RCFG0006A Replaced 6" PZR Safety Valve H1RCPSV3452 Date Completed 8/15/2018 10/18/2017 8/15/2018 11/1/2Q18 8/13/2018 8/13/2(N8 8/13/2018 8/13/2018 8/13/2018 11/2/2018 1171/2018 10/25/2018 10/25/2018 10/25/20TO Repalr/RepIacement Plan Number 1-17-028 1-17-032 1-17<<036 1-17-037 1-18-003 1-18-004 1-18-005 1-18-006 M8-007 1-18-010 1-1MT1 1-18-016 1-18-017 M8-Q18
NOC-AE-19003624 Page 8 of 8 TABLE 2 ABSTRACT OF REPAIR/REPLAGEMENT ACTIVITIES REQUIRED FQR CONTINUED SERVICE 1RE21 FALL 2018 Code Class 1
2.
2 Corrective Measure REPLACEMENT REPLACEMENT REPLACEMENT Item Description BOLTING VALVE VALVE System REACTOR COOLANT CHEyiCAL&
VOLUME CONTROL MAIN STEAM Description of Work REPLACED RCP1A SEAL HOUSING BOLTS WITH INCONEL STUDS<
Replace Code Parts (Trim Set, Plug>>
Seat, and Cage).
Replaced Code Part (Bonnet)*
Date completed 10/17/2018 10/17^018 10/27/2018 Repair/RepIacement Plan Number 1-18-026 1-18-036 1-18-037