NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance of LAR Associated with Revising TSs to Adopt TSTF-529, Rev.4, Clarify Use and Application Rules, Using the CLIIP
ML19025A285
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/25/2019
From: Siva Lingam
Plant Licensing Branch IV
To: Cox M
Arizona Public Service Co
References
L-2018-LLA-0725
Download: ML19025A285 (3)


Text

NRR-DMPSPEm Resource From: Lingam, Siva Sent: Friday, January 25, 2019 2:36 PM To: Matthew.Cox@aps.com Cc: Pascarelli, Robert; Cusumano, Victor; Tilton, Caroline; Thomas.N.Weber@aps.com; Michael.Dilorenzo@aps.com

Subject:

Palo Verde 1, 2, and 3 - Acceptance of LAR Associated with Revising TSs to Adopt TSTF-529, Rev.4, "Clarify Use and Application Rules," Using the CLIIP (EPID L-2018-LLA-0725)

By letter dated December 27, 2018 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML18361A845), Arizona Public Service Company (the licensee) submitted a license amendment request (LAR) to revise Technical Specifications (TSs) to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules, using the consolidated line item improvement process for Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3. The proposed LAR would modify TS requirements in Section 1.3 and Section 3.0 regarding Limiting Condition for Operation and Surveillance Requirement usage. These changes are consistent with the U.S. Nuclear Regulatory Commission (NRC)-approved TSTF-529 (ADAMS Accession No. ML16060A441).

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review for this LAR The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 150 hours6.25 days <br />0.893 weeks <br />0.205 months <br /> to complete. The NRC staff expects to complete this review approximately by December 31, 2019, or earlier. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, or unanticipated addition of scope to the review.

If you have any questions, please contact me at (301) 415-1564.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Grand Gulf Nuclear Station 1

Location: O-9E22; Mail Stop: O-9E03 Telephone: 301-415-1564 E-mail address: Siva.Lingam@nrc.gov 2

Hearing Identifier: NRR_DMPS Email Number: 778 Mail Envelope Properties (Siva.Lingam@nrc.gov20190125143500)

Subject:

Palo Verde 1, 2, and 3 - Acceptance of LAR Associated with Revising TSs to Adopt TSTF-529, Rev.4, "Clarify Use and Application Rules," Using the CLIIP (EPID L-2018-LLA-0725)

Sent Date: 1/25/2019 2:35:31 PM Received Date: 1/25/2019 2:35:00 PM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:

"Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>

Tracking Status: None "Cusumano, Victor" <Victor.Cusumano@nrc.gov>

Tracking Status: None "Tilton, Caroline" <Caroline.Tilton@nrc.gov>

Tracking Status: None "Thomas.N.Weber@aps.com" <Thomas.N.Weber@aps.com>

Tracking Status: None "Michael.Dilorenzo@aps.com" <Michael.Dilorenzo@aps.com>

Tracking Status: None "Matthew.Cox@aps.com" <Matthew.Cox@aps.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3304 1/25/2019 2:35:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: