ML18341A141
| ML18341A141 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim (DPR-035) |
| Issue date: | 12/04/2018 |
| From: | Calabrese D Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 2.18.079 | |
| Download: ML18341A141 (2) | |
Text
~Entergx Letter Number 2.18.079 December 4, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
PNPS Emergency Plan Revision Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35
Dear Sir or Madam:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth. MA 02360 In accordance with Title 1 O Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision of the PNPS Emergency Plan, EP-PP-01 and the associated 10 CFR 50.54(q) Review.
The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CFR 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.
If you have any questions or require additional information, please contact me at (508) 830-8227.
There are no regulatory commitments contained in this letter.
,-....-ma M. r-:,_Mf'~~
Emergency Planning Manager DMC/mjg Attachments: 1. EP-PP-01, PNPS Emergency Plan, Revision 49
- 2. 50.54(q) Review for EP-PP-01, PNPS Emergency Plan, Revision 49
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station cc:
Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 1 - Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 NRG Resident Inspector Pilgrim Nuclear Power Station Letter No. 2.18.079 Page 2