ML18297A092
| ML18297A092 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/24/2018 |
| From: | NRC |
| To: | NRC/NRO/DLSE/LB4 |
| References | |
| Download: ML18297A092 (4) | |
Text
1 Vogtle PEmails From:
Gleaves, Bill Sent:
Wednesday, October 24, 2018 9:44 AM To:
Chamberlain, Amy Christine; Wes Sparkman (WASPARKM@southernco.com)
Cc:
Patel, Chandu; Dixon-Herrity, Jennifer; Vogtle PEmails; Neil Haggerty - SNC (neil.haggerty@EXCELservices.com); Roberts, Kelli Anne; Patel, Pravin; Paige Ridgway PTAPSCOT@SOUTHERNCO.COM
Subject:
Acceptance Letter for Vogtle, Unit 3 only, LAR-18-026 "Column Line 1 Wall Reinforcement Area Change" Attachments:
Vogtle LAR-18-026 Column Line 1 Wall Reinforcement Area Change ACCEPTANCE LETTER.pdf Amy and Wes, The NRC has accepted for review your LAR 18-026, Column Line 1 Wall Reinforcement Area Change, dated October 19, 2018. By this email, the staff is issuing the associated acceptance letter into the public record. The enclosed acceptance letter accepts your proposed schedule for completion of this action by April 19, 2019, however, if the review requires a different target date we will contact you.
Respectfully, Billy William (Billy) Gleaves Senior Project Manager Licensing Branch 4 Office OWFN 8H17 US NRC, Office of New Reactors The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author are not binding on The Commission.
Hearing Identifier:
Vogtle_COL_Docs_Public Email Number:
379 Mail Envelope Properties (BN7PR09MB291620AFDCEA23824ED74FDF9FF60)
Subject:
Acceptance Letter for Vogtle, Unit 3 only, LAR-18-026 "Column Line 1 Wall Reinforcement Area Change" Sent Date:
10/24/2018 9:43:42 AM Received Date:
10/24/2018 9:43:48 AM From:
Gleaves, Bill Created By:
Bill.Gleaves@nrc.gov Recipients:
"Patel, Chandu" <Chandu.Patel@nrc.gov>
Tracking Status: None "Dixon-Herrity, Jennifer" <Jennifer.Dixon-Herrity@nrc.gov>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None "Neil Haggerty - SNC (neil.haggerty@EXCELservices.com)" <neil.haggerty@EXCELservices.com>
Tracking Status: None "Roberts, Kelli Anne" <KROBERTS@southernco.com>
Tracking Status: None "Patel, Pravin" <Pravin.Patel@nrc.gov>
Tracking Status: None "Paige Ridgway PTAPSCOT@SOUTHERNCO.COM" <PTAPSCOT@SOUTHERNCO.COM>
Tracking Status: None "Chamberlain, Amy Christine" <ACCHAMBE@southernco.com>
Tracking Status: None "Wes Sparkman (WASPARKM@southernco.com)" <WASPARKM@southernco.com>
Tracking Status: None Post Office:
BN7PR09MB2916.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 963 10/24/2018 9:43:48 AM Vogtle LAR-18-026 Column Line 1 Wall Reinforcement Area Change ACCEPTANCE LETTER.pdf 162005 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
October 24, 2018 Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.
42 Inverness Center Parkway BIN B237 Birmingham, AL 35242
SUBJECT:
ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REQUEST FOR LICENSE AMENDMENT FOR THE VOGTLE ELECTRIC GENERATING PLANT, UNIT 3: COLUMN 1 WALL REINFORCEMENT AREA CHANGE (LAR 18-026) (EPID NO. L-2018-LLA-0278)
Dear Mr. Whitley:
By letter dated October 19, 2018, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18292A660), the Southern Nuclear Operating Company (SNC) submitted a license amendment request (LAR) for the Vogtle Electric Generating Plant (VEGP)
Combined License (COL) Number NPF-91 only. The requested amendment proposes to depart from certified AP1000 Design Control Document (DCD) Tier 2* material that has been incorporated into the Updated Final Safety Analysis Report (UFSAR). Specifically, the proposed changes are to Tier 2* information in the UFSAR (which includes the plant-specific DCD information) to change the vertical reinforcement information provided in the VEGP Unit 3 column line 1 wall from elevation 135'-3" to 137'-0".
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the LAR. The acceptance review is a staff process to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.90, an amendment to the license must fully describe the changes requested and follow, as closely as applicable, the form prescribed for original applications. Section 52.79 of the 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
B. Whitley The NRC staff has reviewed your application against the regulatory requirements and has concluded that it provides sufficient technical detail to enable the NRC staff to begin its detailed review and make an independent assessment regarding the acceptability of the proposed changes in terms of regulatory requirements and the protection of public health and safety and the environment.
Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
You have requested an amendment issuance date of April 19, 2019. The staff intends to complete all actions necessary to support that date. However, if the review requires a different target date we will contact you. The staff estimate to support this review based on this limited acceptance review is approximately 160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br />, but may change as the review proceeds.
If you have any questions, please contact me at (301) 415-5848 or bill.gleaves@nrc.gov.
Sincerely,
/RA/
William (Billy) Gleaves, Senior Project Manager Licensing Branch 4 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Docket No.:
52-025 cc: Chandu Patel Jennifer Dixon-Herrity Amy Chambelain, SNC Neil Haggerty, SNC Wes Sparkman, SNC Kelli Roberts, SNC Pravin Patel, NRC