Text
~Entergy GNR0-2018/00038 August 27, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
REFERENCES:
Dear Sir or Madam:
Updated Final Safety Analysis Report Submittal Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29 Entergy Operations, Inc.
P.O. Box756 Port Gibson, Mississippi 39150 Eric A. Larson Site Vice President Grand Gulf Nuclear Station Tel: 601-437-7500 50.71 (e) 54.37(b)
Pursuant to the 10 CFR 50.71(e) and 50.4(b)(6), Entergy OperatioRs Inc. (Entergy) hereby submits one pdf copy on CD-ROM (Enclosure) of the Grand Gulf Nuclear Station (GGNS)
Updated Final Safety Analysis Report (UFSAR). The UFSAR pdf is a complete copy of the 10 CFR 50 Appendix 8 controlled copy of the UFSAR. This revision of the UFSAR includes changes made in the facility as described in the UFSAR during the period of May 1, 2016 through April 30, 2018. In addition, one pdf copy of a redacted version of the UFSAR is included on a second CD-ROM (Enclosure).
This submittal is a significant revision to the UFSAR that incorporates the extended power uprate final safety analysis report, MELLLA+, the identification of information which is historical and retained for completeness and clarity of understanding, as well as deletion of obsolete material. Attachment 1 provides a list of the GGNS license bases document changes incorporated into this revision of the UFSAR, as well as the Fire Protection Program, and supersedes the version submitted in 2017 (GNR0-2017/00032). The GGNS UFSAR maintenance program is under review. Inconsistencies and errors found as a result of this review will be entered into the corrective action program.
Due to the number of changes, in 2017 _the entire document was repaginated arid reformatted into a single book versus multiple sub-~ooks. This enhancement simplifies movement through, searching, and understanding the material contained within the UFSAR. Changes made since the 2017 conversion are noted with the change number on the affected UFSAR pages. To comply with NRC requirements for electronic media, each chapter is broken into separate pdfs.
GNR0~2018/00038 Page 2of 3 In addition, pursuant to the requirements of 10 CFR 54.37(b) and the guidance specified in Regulatory Issue Summary 2007-16, Revision 1, "Implementation of the Requirements of 10 CFR *54.37(b)for Holders of Renewed Licenses," the UFSAR update required by 10 CFR 50.71(e)must include any Structures,.Systems, or Components (SSCs) newly identified that would have been subject to an aging management review or evaluation of Time-Limited Aging Analyses in accordance with 10 CFR 54.21. There were no newly identified SSCs subject to aging management review or evaluation during the specified period.
This letter contains no new commitments. If you have any questions or require additional information, please contact Douglas Neve at 601-437-2103.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 2?1h day of August 2018."
Sincerely,
~e,L ____
Eric A. Larson Site Vice President Grand Gulf Nuclear Station EAL/tdf I
Attachment:
Licensing Basis Document Changes Incorporated into this Revision cc:
(See Next Page)
GNR0-2018/00038 Page 3 of 3 cc:
NRG Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission ATTN: Ms. Jennifer Bridges 1600 East Lamar Boulevard Arlington, TX 76011 *A511
GNR0-2018/00038 to GNRO 2018/00038 License Basis Document Changes Incorporated in this Revision
GNR0~201 a10003a Page 1 of 5
- 1111:111;1 t1~1,~11
- It:
//C{'.:'\\)::/i/fc;~*
- "*,.,:,*,:,.,,::; /< //.,;:\\ :::*: '\\O ),,\\ ',
- ,;/<:
- ..,,\\':\\/:*/ {f: }) :;) y::.),t*?\\ '.>,//: ll;i
- ',,:', (!\\(;r;
- }< j)'
i
- . '.'.*.,.,***.;,"'.o".
- :>*:*:.
- ,;. *~'
- t> '/ *>
%t
- .",H:tt:;:\\/ ***et+*
(%'..{/~
IC '\\t.) '.*.
- /;\\\\'
- '}{
- c;,, >........ :.:'
i'[
,..,.::::::*.,,-.:',',.,.~:?,:/\\.*,,.:';
,J,'. *.,*,
(*.,'.://;,
..:?"
LBDCR 2013-003 U.pdate miscellaneous UFSAR Fi.gures I
LBDCR 2013-009 Change surveillance frequencies from 18 to 24 months in Technical Requirements Manual Section 6.2 (Fire Protection Plan components)
LBDCR 2013-011
. Update UFSAR Section 9.5.10.1.2 to addresses changes in water chemistry control LBDCR 2014-003 Update UFSAR Figure 7.2-1A and 7.2-11 to reflect change to Reactor Protection System Motor-Generator Set Protection c
LBDCR 2014-008 Update UFSAR Figures 5.4-021 and 7.6-017 r:,
LBDCR 2014-036 Update UFSAR Section 11.4 to reflect liquid radwaste discharge to solid radwaste system LBDCR 2014-042 Update UFSAR Chapter 13 to reflect relocation of information to Quality Assurance Program Manual LBDCR 2015-002 Update UFSAR Section 6.2.3.3 for secondary containment drawdown time LBDCR 2015-003 Load Reject Relay replacement and additional Electrohydraulic Control trip function.(turbine.trip)
LBDCR 2015-013 Update UFSAR Figures 10.3-001 and 10.4-010 for replacement of Main Steam drain valve LBDCR 2015-028 Update air receiver isolation valves on UFSAR Figure 9.3-33 LBDCR 2015-033 Update UFSAR Figure 9.5-138 LBDCR 2015-034 Update UFSAR Figure 9.1-26A LBDCR 2015-036 Revise Reactor Pressure Vessel Level 9 setpoint in Figure 5.3-2 LBDCR 2015-042 Update UFSAR Figure 9.2-027 LBDCR 2015-047 Update UFSAR Section 9.1 to reflect additional control rod blade hangers in the Spent Fuel Pool LBDCR 2015-048 Update UFSAR Figure 11.5-006 LBDCR 2015-052 Update UFSAR Sections 7.5 and 9.2 to re,flect new SGTS Rad Monitor LBDCR 2015-059 Add groundwater monitoring wells to Update UFSAR Section 2.4.13.2.3 and Table 2A-29A LBDCR 2015-062 Update UFSAR Figure 10.4-005 with new Circ Water Ph Monitors LBDCR *2015-067 Update Survey Information in Chapter 2 LBDCR 2015-083 Update UFSAR Figure 2.4-44 LBDCR 2015-084 Revise UFSAR Section 9.1 to reflect storage of irradiated material in Spent Fuel Pool LBDCR 2015-088 Remove primary water.pump vibration automatic trip function from Section 10.2 LBDCR 2016-006 Update UFSAR Figure 10.4-001 LBDCR 2016-011 Update Table 7.5-2 note 11 and add new Note 31 to Table 6.2-49 LBDCR 2016-014 Update In Service Test program codes in Sections 3.9 and 6.2 LBDCR 2016-024 Update UFSAR Figure 10.2-001 LBDCR 2016-026 Remove TORMIS code methodology from UFSAR Sections 3.5 and 3.8 LBDCR 2016-032 Update UFSAR Figure 8.3-007 to reflect new power supply to Central Alarm
. -Station LBDCR 2016-036 Remove reference to UFSAR Tables 8.3-1, 8.3-2, & 8.3-3 from Section 8.3.
LBDCR 2017-037 Incorporate time critical operator actions for MELLLA+ and feedwater leakage control system into Sections 6. 7.2 and 15.8.1 i
LBDCR 2016-039 Update UFSAR Section 5.3.2.2 to address negative reactor vessel pressure
GNRQ.:2018/00038 t-'a 1e 2 f 5 0
"*c;
,,.,,-;c,J,;,_ ::*,,*:,-.,,,,,,_:;
"_....,,,,;:,*,:;,",,,;,*i.c <.**,r"******,,
/':t
'~
'/ci:*: *.. -..... \\ -
~/.:;;<'
>.'/'.' ', ?, "t "'.':;
,;:.)i':'.\\{:' UY
,:) ;;}/':' ft% {Mt"I(:l'.t}/i**.' -C' -*' :.*
-~**/"<*<.
- i,;
- ::;;,;\\ ic,'}
.*..*,_.* *.-::::3i:}'f':t;
- 1r ~~~
--*/,':, (;--;:_
-~--:".','.
~)~ ~/J;:
J :/
- /} '*:?\\ft'
- {
- it\\({.}
}1:} iJ}*i*:;;; :?:\\
,,*i:
- ,,, >:/:\\ ::-;.'.-.:.,
.'.,, /,J
-:, ; ;"i'
- )::'});
":"'i \\' *:{~::,::/:.;;,,
. ;,? :;::','.
,:);:.,,,
- ,\\,;
-.,, \\/-:,,,,,:,**,',',
,-,,,,_;;::;;,,,.,"/":*' ;::; __,,_
during startup LBDCR 2016-047 Update Div Ill fuel tank inspection requirements in Section 3A tBDCR 20t6.;Q48 Delete conflicting information on Standby Service Water room temperatures from Update UFSAR Section 3.11.4.5 LBDCR 2016-049 Update UFSAR Figure 8.3-007 to reflect new power supply to Central Alarm Station-LBDCR 2016-052 Update UFSAR Section 9.4 to delete Freon Detection from the Control Room HVAC LBDCR 2016-054 Update UFSAR Appendix 3A/8.4-1 to capture revised REG GUIDE 8.4 LBDCR 2016-055 Update UFSAR Section 9.3 Table 9.3-4 Sheet 1 for MELLLA+
LBDCR 2016-060 Update UFSAR Figures 9.2-024 and 11.2-008 LBDCR 2016-061 Update UFSAR Section Chapter 13 Conduct of operations LBDCR 2016-065 Update UFSAR Figure 8.1-001 LBDCR 2016-074 Update UFSAR Section 6.2.2.3 to reflect secondary containment drawdown analysis LBDCR 2016-076 Update UFSAR Figure 1.8-001 LBDCR 2016-077
- Update UFSAR *section 2.1 to address editorial changes and *historical information LBDCR 2016-078 Update UFSAR Section 2.2 to address editorial changes and historical information LBDCR 2016-079 Update UFSAR Section 2.3 to address editorial changes and historical information LBDCR 2016-087 Update UFSAR Section 4.1 to address editorial changes and historical
-information LBDCR 2016-088 Update UFSAR Section 4.2 to implement editorial changes, identify historical information, and delete obsolete information.
LBDCR 2016-089 Update UFSAR Section 4.3 to implement editorial changes, identify historical information, and delete obsolete information.
LBDCR 2016-090 Update UFSAR Section 4.4 to address editorial changes and historical information LBDCR 2016-091 Update UFSAR Section 4.5 to implement editorial changes, identify historical information, and delete obsolete information.
LBDCR 2016-092 Update UFSAR Section 15.5 to implement editorial changes, identify historical information, and delete obsolete information.
LBDCR 2016-100 Update UFSAR Section 5.3 to implement editorial changes, identify historical information, and delete obsolete information.
LBDCR 2016-101
-Update -UFSAR Section 5.4 and 5.5 to -implement -editorial -changes, -identify historical information, and delete obsolete information.
LBDCR 2016-113 Revise Standby Liquid Control Discharge Pressure in UFSAR Table 9.3-4 LBDCR 2016-115 Update UFSAR Figure 5.1-1 with correct enthalpy LBDCR 2016-128 Update UFSAR Section 1.1 & 1.2 to address editorial changes and historical information LBDCR 2016-129 Update UFSAR Section 1.3 to address editorial changes and historical information LBDCR 2016-130 Update UFSAR Section 1.5 & 1.6 to address editorial changes and historical information LBDCR 2016-131 Update UFSAR Section 1. 7 & 1.8 to address historical information LBDCR 2016-133 Update UFSAR Section 9.1 to address editorial changes and historical
GNR0-2018/00038 a.. e 0 5 P
3 f
JltJil~
/,..,,
'.. 'i:.i
,'.:r;<***
- illfflJl
,,,c:,.*,.,
-'. '. ~*~-;,.: '*, '
tii;f!flWJ;
- c,:
21.{; tl~~:)
F 'i
- c
- *
' t~)f ~tii~\\
... *,,,,;,,.;,_c
-~1*
- ~
information LBDCR 2016-134 Update UFSAR Section 9.2 to address editorial changes and historical information LBDCR 2016..;135
. Update UFSAR Section 9.3 to address editorial changes and historical
. information LBDCR 2016-136 Update UFSAR Section 9.4 to address editorial changes and historical information LBDCR 2016-137 Update UFSAR Section 9.5 to address editorial changes and historical information
.LBDCR.201.6-1.38 Update UFSAR Section 6.3 to address editorial changes and historical
- information LBDCR 2016-139 Update UFSAR Section 6.5 to address editorial changes and historical information LBDCR 2016-140 Update UFSAR Section 6.6 to address editorial changes and historical information LBDCR 2016-141 Update UFSAR Section 9. 7 to address editorial changes and historical information "lBDCR 2016-150
LBDCR 2016-151 Update UFSAR Figure 9.3-009-002 LBDCR 2016-152 Update UFSAR Section 2.4 to address editorial changes and historical information LBDCR 2016-153 Update UFSAR Section 2.5 to address editorial changes and historical information LBDCR 2016-154 Update UFSAR Section 6.2 to capture Extended Power Uprate (EPU) updates LBDCR 2016-172 Update UFSAR Figure 10.2-001-01 LBDCR 2016-181 1
Update UFSAR Figures 9.1-34 and -36 LBDCR 2016-182 Reduce turbine bypass removal allowable value from <40% to <35.4% Reactor Thermal Power in UFSAR Sections 7.2, 7.7, 10.2, 10.4 & 15A LBDCR 4016-183 Update UFSAR Section 15.2
/
Update UFSAR Section 7.1 to address editorial changes and historical LBDCR 2016-217
. -information LBDCR 2016-218 Update UFSAR Section 7.2 to address editorial changes and historical information LBDCR 2016-219 Update UFSAR Section 7.3 to address editorial changes and historical information LBDCR 2016-220 Update UFSAR Section 7.4 to address editorial changes and historical information
- -LBDCR*201a~221 U.pd.ate U.FSAR Section 7.5 to.addres.s ediiori.al ch.anges.and historical information LBDCR 2016-222 Update UFSAR Section 7.6 to address editorial changes and historical information LBDCR 2016-223 Update UFSAR Section 7.7 to address editorial changes and historical information LBDCR 2016-225 Update UFSAR Section 6A to address editorial changes and historical information
. LBDCR201.6~226 Update UFSAR S.e.cti.on.6E to.address editorial cbang.es.and.histori.cal.information.
LBDCR 2016-227 Update UFSAR Figure 9.3-007 LBDCR 2016-230 Update UFSAR Section 3.2 to capture EPU updates LBDCR 2016-235 Update UFSAR Section 8.1 to address editorial changes and historical information
GNR0~2018/00038 Pa.. e 4 of 5
~
'II 1111,r"-,, -* -
~riwii~l~~ti!j
','j*
11i1Jitl
- ; :.':" "'-. 7*;
- .
- , ~"*:~; *.*. '.
'£()*,t;:;;.. *..,,
, *'.;'.":: F.. -.,,
H
'./:
"*.'.. t,:;:... );i/'/'..,. **"'}:'.'\\
- . '(},::,...
..... * \\::::,';
LBDCR 2016-236 Update UFSAR Section 3.3 and 3.4 to address editorial changes and historical information LBDCR 2016-237 Update UFSAR Section 3 to address editorial changes and historical information LBDCR 2016-238 Update UFSAR Section 3 to address editorial changes and historical information LBDCR 2016-239
- Update UFSAR Section 3.1 O & 3.11 to address editorial changes and historical information LBDCR 2016-240 Update UFSAR Section 8.1 & 8.3 to address editorial changes and historical information LBDCR 2016-241 Update UFSAR Appendix 3A to address editorial changes and historical
- information LBDCR 2016-242 Update UFSAR Appendix 3C, 30 and 3E to address editorial changes and historical information LBDCR 2016-243 Update UFSAR Appendix 3F and 3G to address editorial changes and historical information LBDCR 2016-245 Update UFSAR Figure 9.1l26A
- -LBDCR 201-6-246 Update UFSAR Section 6.1 to address editorial changes and historical information LBDCR 2016-248 Update UFSAR Section 15.4 to clarify function of audible rod drift alarm LBDCR 2016-249 Update UFSAR Figure 10.3-004 and 005 LBDCR 2016-252 Update UFSAR Section 14 to address editorial changes and historical information LBDCR 2016-253 Update UFSAR Figure$ 10.4-010-01 and 10.4-010-02.
LBDCR 2016-254 Update UFSAR Figures in Chapter 9 and 1 O to reflect configuration changes
-lBDCR 201-6-2-55
-Update -UFSAR -to -Jncorporate RG 1.182 and TSTF-427 LBDCR 2016-256 Update UFSAR Table 9A.1 LBDCR 2016-263 Update the normal flow direction for Penetration 105A in UFSAR Table 6.2-44 LBDCR 2016-275 Update UFSAR Section 15A and 158 to address editorial changes, historical information, and the impact of MELLLA+ on Feedwater Heater Out of Service.
LBDCR 2016-277 Update UFSAR Appendix 15C to address editorial changes and historical information LBDCR 2016-279 Update UFSAR Figure 9.2-027-02 LBDCR 2016-280 Update Div 3 EOG logic in Section 8.3.1 LBDCR 2016-281 Update UFSAR Section 18 to address editorial changes and historical information LBDCR 2016-282 Correct line class for steam condensing in UFSAR Figure 5.4-01 O LBDCR 2016-300 Update UFSAR Section 15.2 to address editorial changes and historical information
-LBDCR 201-6-304
- Update-UFSAR -Section 15.3 -to -capture-EPU -updates LBDCR 2016-306 Update UFSAR Section 15.4 & 15.5 to address editorial changes and historical information LBDCR 2016-308 Update UFSAR Section 15.6 to address editorial changes and historical information LBDCR 2016-310 Update UFSAR Section 15.8 to address editorial changes and historical information
-LBDCR-201-6-312
. -Update UFSAR-Section 4.4 -to -capture -post -EPU.updates LBDCR 2016-313 Update UFSAR Section 150 to address editorial changes and historical information LBDCR 2016-315 Remove discussion of boraflex coupons from UFSAR Section 9.1.2 LBDCR 2016-317 Update UFSAR Figures 5.4-002-01 and 02 to remove reactor recirculation pump
GNRQ..:2018/00038 Page 5 of 5
'.;\\i;}\\daeb111tth't'Ri!:~ortfl,,:::*,:
.,.,.],!,(,;,,,,
' *::;; *.*. * \\ :, : : ;.*)_/i:S\\~:: /t\\?:<.* ;! **,
.* ;- \\...
- Ji,,.,*,<t;.\\::,;.;', :.:re LBDCR 2016-320
_LBDCR 2-016-322
. LBDCR2017.;,002 LBDCR 2017-007 LBDCR 2017-014 LBDCR 2017-022 1
LBDCR 2017-024 LBDCR 2017-032 LBDCR 2017-036 LBDCR 2017-038 LBDCR 2017-045 LBDCR 2017-056 LBDCR 2017-060 LBDCR 2017-062 LBDCR 2017-068 LBDCR 2017-069 LBDCR 2017-071 LBDCR 2017-091 LBDCR 2018-001 LBDCR 2018-004 LBDCR 2018-007 LBDCR 2018-008 LBDCR 2018-013
-LBDCR 2018-030 LBDCR 2018-036 EC 62041 Oil Level Hi alarms Clarify Reload analysis requirements in UFSAR Sections 15.0 and 15.2 Update UFSAR Figure 6.4-002 to.reflect.new.roo.fing material Update UFSAR Figure 9.5-0138 to reflect refrigerant compressor instrumentation Update UPS Heat Load from Div I Low Pressure Core Spray in FSAR Section 9.2-5 Update UFSAR Section 9.5.2 with new 2-way radio system Update UFSAR Figure 10.4-138 to reflect actual plant configuration Revise condensate pump seal cooling water piping configuration in UFSAR Figure 10.4~011 Updates Figure 10.4-011 to reflect modifications to cooling water tubing for condensate booster pumps Update UFSAR 3.6A and 9.3 to include leakage limits for Standby Liquid Control Update UFSAR Chapter 3 to reflect organization changes Update UFSAR Section 15.2 to remove obsolete information regarding industry
_failures.o.f.residual heat.removal inj.e.ction valves Update UFSAR Section 15.2 to remove obsolete information regarding the auxiliary steam system Update UFSAR Figure 10.4-001 to delete intercondenser high level alarm from condenser air removal system Update ATWS time critical operator actions in UFSAR Sections 9.3 and 15.8.1 Update description of Balance of Plan transformers in UFSAR Section 8.1 Update UFSAR Tables 9.3-1 and 9.3-2 to reflected gagged open v.alves Update UFSAR Tables 6.2-13 and 6.2-47 with the correct containment test pressure of 12.1 PSIG Revise Environmental Qualification Pressure Envelopes in UFSAR Figure 3.11-19 and 20 Remove Main Steam Line high point vents on UFSAR Figure 10.3~003
- -Update-containment and *drywell -peak pressures.for main *staem and recirc-line breaks in UFSAR Section 6.2 consistent with EPU Update UFSAR Figure 9.2-023A with revised valve configurations Revise turbine generator description in UFSAR Section 1.2 consistent with EPU.
Correct MSIV Leakage Control System initiation time to less than 20 minutes in Section 6.7.1 Revise the sin_gle failure methodolog_y for a Standb_y Service Water line break from Amendment 196 in UFSAR Section 9.2 Incorporate the Aging Management Program as Appendix A to the UFSAR Incorporate thermal-hydraulic response associated with fire in the Main Control Room into the GGNS Appendix R Safe Shutdown Analysis.