Letter Sequence RAI |
---|
EPID:L-2017-LLR-0059, Proposed Alternatives GEN-ISI-ALT-2017-01 Implementation of Code Case N-786-1 and GEN-ISI-ALT-2017-02 Implementation of Code Case N-789-1 (Open) |
|
|
|
---|
Category:E-Mail
MONTHYEARML24002A7132023-12-29029 December 2023 Supplement - Peach Bottom Security Rule Exemption Request ISFSI Docket No. Reference (EPID L-2023-LLE-0032) (Updated) (Email) ML23352A3242023-12-18018 December 2023 Acceptance of Requested Licensing Action Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations (EPID L- 2023-LLN-0004) ML23331A9112023-11-22022 November 2023 Supplement - Peach Bottom Security Rule Exemption Request ISFSI Docket No. Reference ML23304A0182023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Peach Bottom 2 & 3 - Exemption from Security Rule (L-2023-LLE-0032) ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22325A0052022-11-18018 November 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22024A1852022-01-24024 January 2022 Acceptance for Review of Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21134A0152021-05-14014 May 2021 Acceptance Ventilation Filter Testing LAR ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20343A3492020-12-0707 December 2020 Acceptance of Requested Licensing Action: Peach Bottom Relief Request for N-16 Nozzle ML20324A6472020-11-19019 November 2020 Acceptance of Requested Licensing Action: Peach Bottom One-time Exemption App. B Sect. VI.C.3.(I)(1) Force on Force (COVID-19) ML20314A0282020-11-0606 November 2020 Verbal Relief for Penetration Nozzle ML20283A7722020-10-0909 October 2020 Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020 ML20276A0762020-10-0202 October 2020 Acceptance of Requested Licensing Action, One-Time Acceptance for Review - Peach Bottom of Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20217L3462020-08-0404 August 2020 Audit Plan Regarding License Amendment Request to Implement Riskinformed Extended Completion Times (L-2020-LLA-0120) ML20191A0182020-07-0101 July 2020 NRR E-mail Capture - Exelon Fleet RR for SPI for Appendix J Valves ML20178A1392020-06-26026 June 2020 Acceptance Review for Peach Bottom - License Amendment Request for TSTF-505 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20149K4312020-05-22022 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-566 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20122A2302020-05-0101 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of Fleet License Amendment Request to Adopt TSTF-566 ML20077F6112020-03-16016 March 2020 E-mail: the U.S. Nuclear Regulatory Commission'S Record of Decision Regarding Exelon'S Subsequent License Renewal Application for Peach Bottom Atomic Power Station Units 2 and 3 ML20070R2282020-03-10010 March 2020 Request for Additional Information - RR ML20063G1362020-02-27027 February 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Acceptance of Proposed Alternative to Extend Safety Relief Valve Test Frequency (EPIDs L-2020-LLR-0014 Through L-2020-LLR-0018) ML20057E5562020-02-26026 February 2020 Availability of the Final Supplemental Environmental Impact Statement for Subsequent License Renewal of Peach Bottom Atomic Power Station, Units 2 and 3 2023-09-21
[Table view] |
Text
From: Tobin, Jennifer To: "Helker, David P:(GenCo-Nuc)"
Cc: "Gropp Jr, Richard W:(GenCo-Nuc)"; "Loomis, Thomas R:(GenCo-Nuc)"
Subject:
Peach Bottom Units 2 and 3 - Request for Additional Information - Relief Request I5R-06 (EPID L-2017-LLR-0059)
Date: Wednesday, August 15, 2018 10:54:00 AM Attachments: PB I5R06 RAI.docx
Dear Mr. Helker,
By letter dated April 19, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18109A116), Exelon Generation Company, LLC (the licensee) requested relief from the requirements of the American Society of the Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code for Peach Bottom Atomic Power Station, Units 2 and 3. The licensee proposed alternative, I5R-06, requests to eliminate the volumetric examination of the reactor pressure vessel (RPV) threads in flange (i.e., Category B-G-1 examinations) during the fifth inservice inspection (ISI) interval at Peach Bottom, Units 2 and 3. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 50.55a(z)(1), the licensee requested to use the proposed alternative on the basis that the alternative provides an acceptable level of quality and safety.
The Nuclear Regulatory Commissions (NRC) staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific request for additional information (RAI) questions are provided below. A clarification phone call will be held if needed. A response to these RAIs is requested by September 14, 2018.
If you have any questions, please contact me at (301) 415-2328. A copy of this e-mail will be made publicly available in ADAMS.
- Thanks, Jenny Jenny Tobin Project Manager NRR/DORL/LPL-1 Office O9-C12 Phone 301-415-2328 REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION PROPOSED ALTERNATIVE REQUEST NO. I5R-06 ON THE CONDITION MONITORING OF THE REACTOR PRESSURE VESSEL THREADS IN FLANGE EXELON GENERATION COMPANY, LLC PEACH BOTTOM, UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 EPID: L-2017-LLR-0059 By letter dated April 19, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18109A116), Exelon Generation Company, LLC (the licensee) requested relief from the requirements of the American Society of the Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code for Peach Bottom Atomic Power Station, Units 2 and 3. The licensee proposed alternative, I5R-06, requests to eliminate the volumetric examination of the reactor pressure vessel (RPV) threads in flange (i.e., Category B-G-1 examinations) during the fifth inservice inspection (ISI) interval at Peach Bottom, Units 2 and 3. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 50.55a(z)(1), the licensee requested to use the proposed alternative on the basis that the alternative provides an acceptable level of quality and safety.
The NRC staff has determined that additional information is necessary to complete its review of proposed alternative I5R-06. The NRC staffs request for additional information (RAI) is provided below.
RAI-1
Background:
Section 5 of the licensee proposed alternative states the following:
To protect against non-service related degradation, the Peach Bottom Atomic Power Station, Units 2 and 3 uses detailed procedures for the care and visual inspection of the RPV studs and the threads in flange each time the RPV closure head is removed. These controlled maintenance activities provide further assurance that degradation is detected and mitigated prior to returning the reactor to service.
Historically, the NRC has not authorized the elimination of the RPV threads in flange volumetric inspections for sequential 10-year ISI intervals. Additional information associated with the care and visual inspection activities is needed for the NRC staff to determine if there is reasonable assurance that RPV threads in flange degradation will be detected prior to returning the reactor to service each time the RPV closure head is removed.
Issue:
The licensee proposed alternative lacks sufficient information to justify that degradation of the RPV threads in flange will be detected and mitigated prior to returning the reactor to service each time the RPV closure head is removed during the fifth ISI interval if volumetric inspections are not performed. The licensee has not provided sufficient information about the care and visual inspection activities associated with the RPV closure head removal and installation to justify the elimination of the RPV threads in flange volumetric inspections for a consecutive 10-year ISI interval.
Request:
Address the following plant-specific items for the fifth ISI interval. The plant-specific responses are to consider the impact of stuck studs, missing studs, flange holes with bushings, and other unique flange-stud configurations, as applicable.
- 1. Provide a detailed description of the care and visual inspections performed on the RPV threads in flange and studs each time the RPV head is removed. Alternatively, provide the procedures that control the care and visual inspection activities.
- 2. Justify that the existing care and visual inspection activities will provide assurance that degradation of the RPV threads in flange is detected and mitigated prior to returning the reactor to service each time the RPV closure head is removed during the fifth ISI interval if volumetric inspections are not performed.