ML18194A199
| ML18194A199 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/21/1975 |
| From: | Arizona Public Service Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18194A199 (1) | |
Text
Io PV-163 7
Pv-162
+
E XPLANATION
~ ~ ~
APPROXIMATE LOCATION OF BURIED CONTACT CROSS SECTION LINE I
2 Pv-I ~
BORING LOCATION
+
+
Pv-161 Pv-133 Pv-134 18
+
ARLINGTON BASALT FLOW (Above 1000 feet)
Ieontoor interval/
BEDROCK 23 2P P V-12 20 22 PV-132
~
24 Pv58 20 22 PROFlLE FIGURE NO.
refer to NO.
26 25 30
+
~ PV-3 29 15 PV-4 1I7 PV-5 Tv PV-48, v2 21 2
V-59 25 30 29 28 27 I-2 3
4 5-6 7
8 9
10 2.5-26 2.5 27 2.5-28 2.5 29
- 2. 5-30
~ P 0
PV-41 ~
PV-40 PV-39 Pv-7 2
Pv-8 PV-57 Pv-56 Pv-18 Pv-6 Pv-20 V-42
~ UNI Pv-I Pv-27 l6 7
4 Pv-49 Pv-19 0
T I Pv UNIT 3 PV-45 Pv-5 PV-30 V-21 Pv-22 Pv-51 PV-28 PV-29 6
PV-53 PV-32 6
Pv-31
~ p 44 ~ Pbt 47 43 PV-24 Pv-25 Pv-52 PV-4 33 I I 12 13-14 15-16 17 18 19 20 21-22 23 24 25 26 27 28 29-30 31 32 Reduced Profiles 2.5 -31 2.5 32 2.5 33 2.5 -34 2.5 -35 2.5 36 2,5 3?
2.5 -38 2.5 39 2.5 -40 2.5 41 2.5 -42
~ Pv-11
+
+
0 Pv-10
+
SITE PROPERTY Pv-33 V-55 PV-54 PV-34 P V-14 PV-35 22 26 PV-I IP Pv-60 12 Pv-36 bV-61
+
t5
~ PV-62
+
Pv-63 8
Pv-38
+
PVWI7
-26 NORTH MILES Arizona Nuclear Power Project Palo Verde Nuclear Generatmg Statfon Units 1, 2 & 3
+
R7W R6W P V-13 IB R6W R 5W
+
LOCATION OF BORINGS AND PROFILES Figure 2.5-IP CHANGE July 21, 1975 ARPP. 74-2298-cle Amendment 9