ML18194A194

From kanterella
Jump to navigation Jump to search
Figure 13.1-4, Palo Verde Nuclear Generating Station Operating Organization Chart
ML18194A194
Person / Time
Site: Palo Verde  
(NPF-041, NPF-051, NPF-074)
Issue date: 03/01/1978
From:
Arizona Public Service Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18194A194 (1)


Text

PLANT MANAGER SECRETARY ASSISTANT PLANT MANAGER QUALITY SUPERVISOR QUALITY ENGINEERS 1

l3)(3)(3)

QUALITY CONTROL TECHNOLOGY ENGINEERING

& TECHNICAL MANAGER PERSONNEL &

ADMINISTRATIVE MANAGER UNIT SUPERINTENDENT GENERAL SERVICES MANAGER PLANNER SCHEDULER STAFF OF 29 CLERK STAFF OF 73 3

(il(1)(1)

SUPERVISING ENGINEER MECH & ELEC SUPERVISING NUCLEAR ENGINEER SUPERVISING COMPUTER ENGINEER TECHNICAL SUPERVISOR TRAINING SUPERVISOR OPERATIONS SUP E R VIS OR S

I N ST R 0 ME N TAT I0 N

& CONTROL SUP E R VIS OR MAINTENANCE SUPERVISOR CHEM ISTR Y SUPERVISOR MECHANICAL ENGINEER ELECTRICAL ENGINEER ENGINEERING TE0 HN I0 IAN NUCLEAR ENGINEER ENGINEERING TECHNICIAN RADIOLOGICAL

& ENVIRONMENTAL SUPERVISOR COMPUTER ENGINEER (2)(-l(2)

COMPUTER SP E 0 IALI ST 2

(2)(-l(-)

TECH N I CA L ENGINEERS TRAINING 8 P E 0 IALI ST (PLANT) 5 I M U LATOR SUPERVISOR (2)(-)(-)(-l 2

TRAINING SPEC I A LIST (SIMULATOR)

DAYSHIFT 5 UP E R VIS OR S

SHIFT SUPERVISOR S

l6l(6l(5) 17 SUPERVISING NUCLEAR PLANT OPERATOR (6l(6)(5) 17 (10)(10)(10) 30 INSTRUMENTATION

& CONTR (A, 8 & 0) 7 E 0 H N I0 IAN I NST R U ME NTAT I0 N

& CONTROL FOREMAN RECORDS CLERK MAINTENANCE ENGINEER (2)l2)(2)

NUCLEAR PLANT MAINTENANCE FOREMAN CHEMIST (4)(4)(4) 0 H E M IST R Y TECH IC I AN (A, 8 & Cl R AD IAT I0 N PROTECTION SUPERVISOR 12 LEGEND:

0 LASS IF I GATI0 N JOB TITLE TYPICAL UNIT 1 NUMBER OF UNIT 2 PERSONNEL UNIT 3 J IN CLASSIFICATION PER UNIT.

PERSONNEL MAY BE TRANSFERRED FROM UNI1 TO UNIT DEPENDING ON SITE WORK 00 N8 I D E RATI0 N8.

X TOTAL NUMBER OF PERSONNEL IN CLASSIFICATION LICENSE REQUIREMENT:

8 SENIOR REACTOR OPERATOR LICENSE R READ'TOR OPERATOR LICENSE RADIOLOGICAL

& ENVIRONMENTAL SPECIALIST TRAINING SPECIALIST (GEN. EMPLOYEE)

(6)(6)(5l 17 NUCLEAR PLANT OPERATOR R

(3)(3)(3)

NUCLEAR PLANT ELECTRICIAN (A, 8 & C)

R AD IAT I0 N PROTECTION FOREMAN Arizona I)(urlear Power Project Palo Verde IY)urlear Generating Station Units l, 2 & 3 (12)(12)l12) 36 NUCLEAR PLANT E0 U IP ME NT OPERATOR (16l(16l(16l NUCLEAR PLANT MECHANIC (A,B&0) 48 (Bl(6)(6l R AD IAT I0 N PROTECTION (A, 8 & Cl TECH.

18 PALO VERDE NUCLEAR GENERATING STATION OPERATING ORGANIZATION CHART Figure 13.1-4 1236 Narch 1, 1978 Amendment 17