ML18194A066

From kanterella
Jump to navigation Jump to search
Figure 2.5-88, Profiles Along Gila River Between Gillespie Dam and Sentinel
ML18194A066
Person / Time
Site: Palo Verde  
Issue date: 09/29/1975
From:
Arizona Nuclear Power Project
To:
Office of Nuclear Reactor Regulation
References
ANPP-74-2202-A5b 2.5-88
Download: ML18194A066 (1)


Text

SITE PROPERTY ARLINGTON BASALT FLOW G ILL E 6 PIE BASALT FLOW GILA BEND BASALT FLOW Lhh~~

aeeh ~

I/osn 0

NORTH iee ID BEND OF GILA. RIVER Westerly river gradient Southerly river gradient SENTINEL IVVSI ii ensALT FLOW'w-,

0'/2 A G//o IF/

C /h

/FIVER i

I 8 ~

d t

8 GILA BEND ELEV (feet)

B GILLESPIE FLOW BEEHIVE NASH GOO

~OVERLIES TERRACE

~

DRAINAGE ~~SURVEYED TERRACE REMNANTS Ele ation of basalt/

Ele anon of basalt/g a el 850 8 oval t ct fe5 selected spot eis ations on le race.

Boelii e Wosli. 775 750 vo.~K~

700 650 600 550 500 450 400 FRAGMENTARY TERRACE REMNANTS dopost ~

and G

o n

e I f20 RECONST RUCTED 40FEET RIVER 7 R TERRACE PROFILE PRESENT RIVER PROPILE WELL PRESERVED TERRACES WEST OF GILA BEND Eie ahon of well prese ved I ~ rrace s rfoce 660.

GILA RIVER CANYON Elsvohon of terrace 600'levation of basalt/gravel 560 Ele ation of terrace est ot Rocky Point 530'.

ELEV.

B

<fest>

900 850 800 750 700 650 600 550 500 450 400 100 200 FEET VER7 ICAL MiLEE HORIZONTAL Note:

Survey accomplished with Leitz automatic

level, Elevation checked at Gillespie Dam with UoS,GoS.

benchmark (no other benchmarks available near surveyed route south of Gillespie Dam),

Accuracy within + 0o5 feet, Arizona Nuclear Power Project Palo Verde Nuclear Generating Station

,/sj/iH Units 1,2& 8 PROFILES ALONG GILA RIVER BETWEEN GILLESPIE DAN AND SENTINEL CHANGEI Figure 2.5-88 September 29, 1975 kepp-74-2282 A5b Amendment 12