MONTHYEARML23181A1702023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1692023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1682023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1672023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML21201A2652021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 10 Through Chapter 19, Figures (Redacted) ML21201A2612021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 2.5 Through Chapter 3, Figures (Redacted) ML21201A2662021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 4 Through Chapter 9, Figures (Redacted) ML19205A2202019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 1 Thru Chapter 2.4 (Redacted) ML19205A2222019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted) ML19205A2232019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted) ML19205A2212019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 2.5 Thru Chapter 3 (Redacted) ML18277A3032018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18193A8982018-08-0606 August 2018 Figure 9.2-4, Demineralized Water System Water Pretreatment Subsystem. ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18193A8992018-08-0606 August 2018 Figure 9.2-5, Demineralized Water System Water Demineralizer Subsystem. ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18192B8852018-07-30030 July 2018 Map 3-2, Proposed Palo Verde-Devers Transmission Line, Summary of Anticipated Impacts Kofa. ML18192B8872018-07-30030 July 2018 Map 3-4, Proposed Palo Verde-Devers 500KV Transmission Line, Vegetation Impacts ML18192B8862018-07-30030 July 2018 Map 3-3, Proposed Palo Verde-Devers 500KV Transmission Line, Geotechnical Sensitivity Excluding Soils. ML18192B8892018-07-30030 July 2018 Map 3-6, Proposed Palo Verde-Devers 500KV Transmission Line, Recreation Impacts. ML18193A0792018-07-30030 July 2018 Figure 10.4-8, Basic Flow Diagram Feedwater System. ML18193A0822018-07-30030 July 2018 Figure 11.2-2 P&I Diagram Liquid Radwaste System. ML18192B8922018-07-30030 July 2018 Map 3-9, Proposed Palo Verde-Devers 500kv Transmission Line, Cultural Resource Impacts. ML18192B8902018-07-30030 July 2018 Map 3-7, Proposed Palo Verde-Devers 500KV Transmission Line, Wilderness Impacts. ML18193A0802018-07-30030 July 2018 Figure 10.4-9, Auxiliary Feedwater System. ML18192B8912018-07-30030 July 2018 Map 3-8, Proposed Palo-Verde 500KV Transmission Line, Visual Impacts. ML18192B8882018-07-30030 July 2018 Map 3-5, Proposed Palo Verde-Devers 500 Kv Transmission Line, Land Use Impacts. ML18192C0052018-07-18018 July 2018 Drawing 13-E-ZJC-034, Rev. 0, Control Bldg Conduit Arrangement Plan at El 74ft Level Ab. ML18192B8372018-07-18018 July 2018 Figure 1, Red Lake Canyon - Mohave, Bridge Canyon Country Estates, Alternative Segments. ML18194A2582018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 44. ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A3672018-07-13013 July 2018 Figure 2E-2, Geomorphic Profiles, A-A' and B-B'. ML18194A2542018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 37. ML18194A0702018-07-13013 July 2018 Log of Boring PV-64 ML18194A2772018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Areas, 1 + 2. ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A0522018-07-13013 July 2018 Site Property ML18194A0692018-07-13013 July 2018 Log of Boring PV-63 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A3692018-07-13013 July 2018 Figure 2E-5, Location of Gila River Terraces and Major Photo Lineaments. ML18194A0582018-07-13013 July 2018 Figure 2.5-8, Sections Through Site Vicinity. ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A2602018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 32. ML18194A2612018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 33 + 34. ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A0672018-07-13013 July 2018 Figure 2.5-86, Location of Gila River Terraces in Relation to Lineaments. 2023-06-30
[Table view] |
Text
+
E X PLANATION Pv-163 ~ ~ ~ APPROXIMATE LOCATION OF 12 10 7 10 BURIEO CONTACT I 2 PV-162 CROSS SECTION LINE
+ + + Pv- I ~ BORING LOCATION PV-134 ARLINGTON BASALT 14 18 16 18 \6 15 FLOW P V-161
+ (Above 1000 feeti
+ (content inter PV-133 BEDROCK c el/
PV-132 13ROFILE F IGURE 23 P PV-12 20 2'I 20 22 NO. refer to BIO.
Pv-58 2 2.5 26 3- 4 2. 5-27
~ Pv-3 2,5 28 V-59 8 2.5 29 i7 21 PV-4 Pv-5 9" 10 2.5 30 25 30 29 7 2 25 30 29 28 27 Pv-48. v ll "12 2.5 - 31 20 0 Pv-49 14 2.5 -32 Pv-41 ~ V-9 2 Pv-8 V-20 P V-19 V-21 Pv-22 Pv-51 15- IS 2.5 I,
~ pv-4 Pv-57 I'7 " 18 -34 PV-39 Pv-56 V-42 S ~ P 44 ~ PII 47 2.5
~ UNI 2+ Pv 43 19 20 2.5 -35 3 Pv-18 Pv-I Pv-24 PV-7 2.5 36 35 31 Pv-6 i U4-818 UNIT 3 Pv-45 Pv-Pv-25 Pv-52 21 23 24 22 2,5 3?
4-BI N ~ 25- 26 2.5 -38 Pv-27 UNIT 4 PV- 28 Pv-29 6 TIN
+ 27- 28 2.5 39 TIS V-5 Pv-53 I6 U5-Bl UNIT 5 29 30 2.5 "40 U5- BI4 S 2.5 41
~ PII-2 7 Pv-32 31 32 PV-30 2.5-42 4 Reduced Prof lice Pv-31 -208" N-5 2 5 Pv-I "refer to PVNGS - 4&5 PSAR Section 2.5
+ +- Pv-33 Pv-34 Pv-14 Pv-35 IO
+ end Appendix 2K
~ P V- IO SITE PROPERTY 0 22 PV-60 V-55 12 PV-63 8 Pv-36
~ PV-62 I/2 Pv-38 0
~ PV- II V-61 MILES NORTH
+ + ~ PV-37 Pv-54 /q Arizona Nuclear Power Project Palo Verde Nuclear Generating Station
,!' Units 1, 2 gl 3 14 13 18 17 LOCATION OF BORINGS AND PROFILES R7W R 6W
+ Pv-13 R6W R 5W Figure 2.5-1R IB CHANGE February 12, 1979 Amendment 20