ML18193A929

From kanterella
Jump to navigation Jump to search
Figure 10.4.6-5, Secondary Chemistry Control System (Blowdown Process) Piping and Instrumentation Diagram
ML18193A929
Person / Time
Site: Palo Verde  
Issue date: 08/25/1975
From:
C-E Nuclear Power
To:
Office of Nuclear Reactor Regulation
References
Download: ML18193A929 (1)


Text

DB OC SC.193 SLOWDOWN SAMPLE HEAT EXCHANGER I SJ SYS.310.125 (GSI INSIDE OUTSIDE CON1AINMENT CONTAINMENT F(0.247 I

IG.41 CLOSES VALVES SC.500P 8 SC 500Q ON LOW PRESSURE CLOSES VALVESSC 264 50500P 8 SC.5000 ON LOW F LOW H

STEAM GENERATOR I gA.

(SLOWDOWN)

SJSY$ 3H(115 MSS IC.S)

De I/2.2 De 4.2 SI AS CLOSES as CLOSES 5

SC.500P FC SC 194 I

'-Q~

OPEN VALVESC.264 wHEN sc.500p 8 sc.5000 ARE CLOSED OR WHEN SC.500R 8 SC.5005 ARE CLOSED BLOWDOWN SAMPLE HEAT EXCHANGER 2 SIA5 CLOSES 25 SC.5000 I

~HS A/6 N+8 CLOSES VALVES SC.5008 8 SC.5005 ON LOWPRESSURE FC 2

4 o

P 230 i

L SC 661 Ds. I/2 4 SC.264 FC SC 671 s

2I ~Hs

." 10 I

(7 Z 0 <<

No Z

BLOWDOWN HEAT EXCHANGER 2 D634 Fe 8 4 Fo SC 260 s

0 Z 0

0 0

MF2 N@l~

SC 660 H

~HS 7 IC

~A T 260 E/

-I A/3 I+72 CLOSES VALVES90.264 SC.500 R 8 SC 5(NK ON LOW FLOW FC 50.247 50.697 SC 699 F 247 F IC Ds I/2.4 P.299 Pl Ds.l/2 4 SC.696 I

DB FB SC 704 Fs 3 4 FB 3 4 CONDENSATE PUMP DISCHARGE g

0 STEAM GENERATOR 2 (6 LOWDOWN(

2 SJ.SY5.3H(115 Mss (0 5)

DB.I/2.2 O 6.4.2 5 IAS CLOSES CI5 CLOSES SC.500R FC 25 SJ SY5. 310 125 SCCS I

I HS A/sNO 6

(FBI F (0.246 (E 41 75 S

LQHS A/6 oe 4.4 l

SIAS I

CLOSES CIS I

CLOSES SC 662 Ds.l/2.4 SCO73 LC SC.670 60.705 CONDENSER HOTWELL I.

I P 5CO

. J~

L eLowoowN HEAT EXCHANGER I F8.64 FO 06.3 4 SC.261 SC 569 s

-Q ~

TIC

~A L

J T.261 E/

FC F 246 F IC SC 692 DB I/2 4 SC 246 SC *91 I

P 296 Pl SC BCO DB I/2 4 DB FB SC 703 Fs 34 NOTES:

4. ALLCHEMICALMONITORING ALARMSARE INDIVIDUALLY LOCATED ON THE SECONDARY CHEM/STRY CONTROL INDICATINGPANEL A MASTER CHEMICALMONITORING ALARMIS PROVIDED IN THE CONTROL ROOBL
3. ALLMONITORS PROVIDE LOCAL INDICATIONAND SUPPLY A SIGNAL TO 4 REMOTE REPOROERIR EMOTE RECORDERS ARE LOCA TED ON THE SECONDARY CHEMISTRY CONTROL INDICATINGPANEL.

2 SAMPLE LINE TEMPERATURE AND PRESSURE INSTRU-MENTS ACTUATE LOCALALARMSON THE SECONDARY CNENBSTRY CONTROL INDICATINGPANEL. A MASTER ALARMIN THE CONTROL ROOM /ND/CATESAN ALARMING CONDITIONON THIS PANEL INSIDE OUTSIDE CONTAINMENT CONTAINMENT H8.3 4 SC.6/2 REGENERANT WASTE TREATMENTSYS oZ J Z s<<

Z MP T.

(C 0 Z 0

30 0

kglls MET A/6

1. FOR SYMBOLS AND ABBREVIATIONSSEE FIGURE REFERENCE DRAWINGSJ 5YS 310 100.

SJ.S YS.3 X(129 4

CONMHOON INCH(NNN(6. INC GR W(NO(OX CO/(N(C ICW MNW

$%6FH I

SECONDARY CHEMISTRY CONTROL SYSTEM (BLOWDOWN PROCESS)

PIPING AND INSTRUMENTATION DIAGRAM Figure 10.4.6-5 August 25, 1975 10B-39 Amendment 10