Category:Drawing
MONTHYEARML23181A1702023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1692023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1682023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1672023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML21201A2652021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 10 Through Chapter 19, Figures (Redacted) ML21201A2612021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 2.5 Through Chapter 3, Figures (Redacted) ML21201A2662021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 4 Through Chapter 9, Figures (Redacted) ML19205A2202019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 1 Thru Chapter 2.4 (Redacted) ML19205A2222019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted) ML19205A2232019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted) ML19205A2212019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 2.5 Thru Chapter 3 (Redacted) ML18277A3032018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18193A8982018-08-0606 August 2018 Figure 9.2-4, Demineralized Water System Water Pretreatment Subsystem. ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18193A8992018-08-0606 August 2018 Figure 9.2-5, Demineralized Water System Water Demineralizer Subsystem. ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18192B8852018-07-30030 July 2018 Map 3-2, Proposed Palo Verde-Devers Transmission Line, Summary of Anticipated Impacts Kofa. ML18192B8872018-07-30030 July 2018 Map 3-4, Proposed Palo Verde-Devers 500KV Transmission Line, Vegetation Impacts ML18192B8862018-07-30030 July 2018 Map 3-3, Proposed Palo Verde-Devers 500KV Transmission Line, Geotechnical Sensitivity Excluding Soils. ML18192B8892018-07-30030 July 2018 Map 3-6, Proposed Palo Verde-Devers 500KV Transmission Line, Recreation Impacts. ML18193A0792018-07-30030 July 2018 Figure 10.4-8, Basic Flow Diagram Feedwater System. ML18193A0822018-07-30030 July 2018 Figure 11.2-2 P&I Diagram Liquid Radwaste System. ML18192B8922018-07-30030 July 2018 Map 3-9, Proposed Palo Verde-Devers 500kv Transmission Line, Cultural Resource Impacts. ML18192B8902018-07-30030 July 2018 Map 3-7, Proposed Palo Verde-Devers 500KV Transmission Line, Wilderness Impacts. ML18193A0802018-07-30030 July 2018 Figure 10.4-9, Auxiliary Feedwater System. ML18192B8912018-07-30030 July 2018 Map 3-8, Proposed Palo-Verde 500KV Transmission Line, Visual Impacts. ML18192B8882018-07-30030 July 2018 Map 3-5, Proposed Palo Verde-Devers 500 Kv Transmission Line, Land Use Impacts. ML18192C0052018-07-18018 July 2018 Drawing 13-E-ZJC-034, Rev. 0, Control Bldg Conduit Arrangement Plan at El 74ft Level Ab. ML18192B8372018-07-18018 July 2018 Figure 1, Red Lake Canyon - Mohave, Bridge Canyon Country Estates, Alternative Segments. ML18194A2582018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 44. ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A3672018-07-13013 July 2018 Figure 2E-2, Geomorphic Profiles, A-A' and B-B'. ML18194A2542018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 37. ML18194A0702018-07-13013 July 2018 Log of Boring PV-64 ML18194A2772018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Areas, 1 + 2. ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A0522018-07-13013 July 2018 Site Property ML18194A0692018-07-13013 July 2018 Log of Boring PV-63 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A3692018-07-13013 July 2018 Figure 2E-5, Location of Gila River Terraces and Major Photo Lineaments. ML18194A0582018-07-13013 July 2018 Figure 2.5-8, Sections Through Site Vicinity. ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A2602018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 32. ML18194A2612018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 33 + 34. ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A0672018-07-13013 July 2018 Figure 2.5-86, Location of Gila River Terraces in Relation to Lineaments. 2023-06-30
[Table view] |
Text
INSIDE OUTSIDE CON1AINMENT CONTAINMENT CLOSES VALVES CLOSES VALVESSC 264 SC.500P 8 SC 500Q 50500P 8 SC.5000 F(0.247 ON LOW PRESSURE ON LOW F LOW DB OC SLOWDOWN SAMPLE I IG.41 SC.193 HEAT EXCHANGER I SJ SYS.310.125 H (GSI SIA 5 SI AS CLOSES CLOSES F 247 De I/2.2 i
I F IC as I P 230 P.299 CLOSES ~HS 5
'-Q~ 25 A/6 L SC 661 BLOWDOWN HEAT EXCHANGER 2 N@l ~
SC 699 Ds I/2.4 Pl gA. STEAM GENERATOR I N+8 (SLOWDOWN) SC.5000 Ds. I/2 4 Ds.l/2 4 SC.500P SC 671 D634 50.247 SC 704 SJSY$ 3H(115 MSS IC.S) De 4.2 FC FC o SC 660 50.697 SC.696 FC I H
Fe 8 4 ~HS DB 2 4 7 IC
~A FB Fo E/ -I T 260 SC.264 s 2I ~Hs SC 260 Fs 3 4 FC s A/3
." 10 0 I+72 (7 Z Z OPEN VALVE SC.264 wHEN sc.500p 8 sc.5000 0 ARE CLOSED OR 0 << CONDENSATE WHEN SC.500R 8 SC.5005 No 0 FB 3 4 PUMP DISCHARGE g
ARE CLOSED Z 0 CLOSES VALVES MF2 CLOSES VALVES 90.264 l
BLOWDOWN SAMPLE SC.5008 8 SC.5005 SC.500 R 8 SC 5(NK HEAT EXCHANGER 2 ON LOWPRESSURE ON LOW FLOW SC 194 I SJ SY5. 310 125 F (0.246 I.
SCCS (FBI 5 I AS (E 41 SIAS Fs 34 CLOSES I CLOSES I CIS I F 246 DB.I/2.2 CI5 F IC CLOSES I I CLOSES NOTES:
HS A/sNO 6 75 S LQHS A/6 P 5CO
. J~
SC 662 L
eLowoowN SC 692 Pl P 296 SC BCO
- 4. ALL CHEMICAL MONITORING ALARMS ARE INDIVIDUALLY LOCATED ON THE SECONDARY CHEM/STRY CONTROL INDICATINGPANEL A MASTER CHEMICAL MONITORING ALARM IS PROVIDED IN THE CONTROL ROOBL HEAT EXCHANGER I E/ DB I/2 4 0 STEAM GENERATOR 2 25 Ds.l/2.4 DB I/2 4 3. ALL MONITORS PROVIDE LOCAL INDICATIONAND (6 LOWDOWN( SC.500R SCO73 569 SC 246 2 06.3 4 SC SC *91 I SC 703 SUPPLY A SIGNAL TO 4 REMOTE REPOROERIR EMOTE SJ.SY5.3H(115 RECORDERS ARE LOCA TED ON THE SECONDARY O 6.4.2 FC oe 4.4 Mss (0 5) CHEMISTRY CONTROL INDICATINGPANEL.
~
FC LC SC.670 F8.64 s -Q TIC ~A L
DB FB 2 SAMPLE LINE TEMPERATURE AND PRESSURE INSTRU-MENTS ACTUATE LOCAL ALARMS ON THE SECONDARY CONDENSER FO J T.261 CNENBSTRY CONTROL INDICATINGPANEL. A MASTER ALARM IN THE CONTROL ROOM /ND/CATESAN 60.705 HOTWELL SC.261 ALARMING CONDITION ON THIS PANEL A/6 1. FOR SYMBOLS AND ABBREVIATIONS SEE FIGURE (C
REFERENCE DRAWING SJ 5YS 310 100.
H8.3 4 REGENERANT oZ J Z 0Z WASTE SC.6/2 TREATMENT SYS s<< 0 SJ.S YS.3 X( 129 INSIDE OUTSIDE 3 0
CONTAINMENT CONTAINMENT Z 0
kglls MP T. MET 4 SECONDARY CHEMISTRY CONTROL SYSTEM Figure CONMHOON INCH(NNN(6. INC GR W(NO(OX CO/(N(C ICW (BLOWDOWN PROCESS)
MNW
$%6FH I PIPING AND INSTRUMENTATION DIAGRAM 10.4.6-5 August 25, 1975 10B-39 Amendment 10