MONTHYEARML23181A1702023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1692023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1682023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1672023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML21201A2652021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 10 Through Chapter 19, Figures (Redacted) ML21201A2612021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 2.5 Through Chapter 3, Figures (Redacted) ML21201A2662021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 4 Through Chapter 9, Figures (Redacted) ML19205A2202019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 1 Thru Chapter 2.4 (Redacted) ML19205A2222019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted) ML19205A2232019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted) ML19205A2212019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 2.5 Thru Chapter 3 (Redacted) ML18277A3032018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18193A8982018-08-0606 August 2018 Figure 9.2-4, Demineralized Water System Water Pretreatment Subsystem. ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18193A8992018-08-0606 August 2018 Figure 9.2-5, Demineralized Water System Water Demineralizer Subsystem. ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18192B8852018-07-30030 July 2018 Map 3-2, Proposed Palo Verde-Devers Transmission Line, Summary of Anticipated Impacts Kofa. ML18192B8872018-07-30030 July 2018 Map 3-4, Proposed Palo Verde-Devers 500KV Transmission Line, Vegetation Impacts ML18192B8862018-07-30030 July 2018 Map 3-3, Proposed Palo Verde-Devers 500KV Transmission Line, Geotechnical Sensitivity Excluding Soils. ML18192B8892018-07-30030 July 2018 Map 3-6, Proposed Palo Verde-Devers 500KV Transmission Line, Recreation Impacts. ML18193A0792018-07-30030 July 2018 Figure 10.4-8, Basic Flow Diagram Feedwater System. ML18193A0822018-07-30030 July 2018 Figure 11.2-2 P&I Diagram Liquid Radwaste System. ML18192B8922018-07-30030 July 2018 Map 3-9, Proposed Palo Verde-Devers 500kv Transmission Line, Cultural Resource Impacts. ML18192B8902018-07-30030 July 2018 Map 3-7, Proposed Palo Verde-Devers 500KV Transmission Line, Wilderness Impacts. ML18193A0802018-07-30030 July 2018 Figure 10.4-9, Auxiliary Feedwater System. ML18192B8912018-07-30030 July 2018 Map 3-8, Proposed Palo-Verde 500KV Transmission Line, Visual Impacts. ML18192B8882018-07-30030 July 2018 Map 3-5, Proposed Palo Verde-Devers 500 Kv Transmission Line, Land Use Impacts. ML18192C0052018-07-18018 July 2018 Drawing 13-E-ZJC-034, Rev. 0, Control Bldg Conduit Arrangement Plan at El 74ft Level Ab. ML18192B8372018-07-18018 July 2018 Figure 1, Red Lake Canyon - Mohave, Bridge Canyon Country Estates, Alternative Segments. ML18194A2582018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 44. ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A3672018-07-13013 July 2018 Figure 2E-2, Geomorphic Profiles, A-A' and B-B'. ML18194A2542018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 37. ML18194A0702018-07-13013 July 2018 Log of Boring PV-64 ML18194A2772018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Areas, 1 + 2. ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A0522018-07-13013 July 2018 Site Property ML18194A0692018-07-13013 July 2018 Log of Boring PV-63 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A3692018-07-13013 July 2018 Figure 2E-5, Location of Gila River Terraces and Major Photo Lineaments. ML18194A0582018-07-13013 July 2018 Figure 2.5-8, Sections Through Site Vicinity. ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A2602018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 32. ML18194A2612018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 33 + 34. ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A0672018-07-13013 July 2018 Figure 2.5-86, Location of Gila River Terraces in Relation to Lineaments. 2023-06-30
[Table view] |
Text
CONDEN5ER 8 252 HOTWELL Sc 420
~a Pl SJ SYS 310 125 INTENSIFIED (0 8) 7 2ST <<C SCCS Hc. I/2 CONDUCTIVITY H 4
~A U48A MAIN CONDENSER QUADRANT I 50.425 Sc 429 HC I/4 4 SC 425
.C Sc 427 Hc U4 4 Qz, Sc 252 SC 430 F 25 MONITOR (
SC.431 Sc 432 NO~IS FAIL TO A 252 TURBINE BYPASS Hc. I/4 .4 CONDENSER MAIN CONDENSER 50.437 BUILDING SUMP Sc 433 H I WU~S VACUUM PUMP OUADRANTI SAMPLE HEAT EXCHANGER LS
~~a SUMP SJ 5 YS 310 125 F 256 Hc I/4 .4 Hc H4 4 Sc 434 SC.435 SC 430 SCCS IB 71 A 256 Hc I/4 4 CONDENSER SODIUM MONITOR r CONDENSER SC 438 SC 490 SC.491 HOTWELL Mc P 253 HOTWELL SC 442 SC 481 HO~IS QA Pl SJ.S YS 310 125 L MC I N T E N 5)F I E D Secs (A.l) T 253 H HC I/2 CONDUCTIVITY TIC ~ ~a 4 MONITOR I MAIN CONDENSER SC 443 Hc I/4 4 OHS -3 F 253 QUADRANT 2 HC I/4 4 SC 440 SC.441 Sc 253 SC.444 SC 445 SC.446
~ I~
MC MSS 'E FAIL TO A 253 TURBINE BYPASS Hc I/O 4 CONDENSER MAIN CONDENSER SC 451 BUILDING SUMP Sc 447 VACUUM PUMP 2 QUADRANT2 LS (
~a H
~5 SAMPLE HEAT EXCHANGER SUMP F 257 Hc. I/4 .4 SJ 5 YS 310 125 Hc 1/4 50.449 4 Sc 448 Secs (A 8)
A.257 HCU4 4 CONDENSER SODIUM MON)T OR SC 493 HOTWELL Sc 452 SC 492 CONDENSER Mc 8 254 HOTWELL Sc 455 QA- Pl SJ 575.310 125 50.482 MC INTENSIFIED MAIN CONDENSER Secs (a 0) T.254
.c 1~ H HC. I/2 .4 Hc. I/4 4 ol CONDUCTIVITY MDNITOR (
I/4 .4 F 254 QUADRANT 3 SC.480 HC SC453 Sc 454 SC 457 SC 458 Sc 459 4~)s FAIL TO MC MSS A.254 TURBINE BYPASS Hc. I/4 4 CONDENSER MAIN CONDENSER SC 464 BUILDING SUMP VACUUMPUMP 3 SC 460 H ~0 CWS QUADRANT3 SAMPLE HEAT EXCHANGER LS
~ ~a SUMP SJ SYS 310 125 F.258 Hc I/4 4 Hc U4 4 Sc 461 SC 462 SC 463 SCCS IB 8)
A 258 FOR SYMBOLS AND ABBREVIATIONS SEE FIG Hc. I/4 .4 CONDENSER REFERENCE DWG SJ SYS 310.100 SODIUM MON)T OR SC 494 SC 495 HOTWELL SAMPLE UNE TEMPERATURE AND PRESSURE SC 4%
INSTRUMENTS ACTUATE LOCAL ALARMS ON I THE SECONDARY CHEMISTRY CONTROL CONDENSER Mc 8 255 INDICATINGPANEL A MASTER ALARM IN H HOTWELL THE MAIN CONTROL ROOM INDICATES AN Pl Sc 469 SC.483 ALARMINGCONDITION ON THIS PANEL Sl SYS 310 125 L 7 TSS MC INTENSIFIED SCCS IA 01 ALL MONITORS PROVIDE LOCAL INDICATION 1 ~A Hc I/2 .4 CONDUCT(V(7 7 AND SUPPLY A SIGNAL TO A REMOTE TIC
-3 SC 470 MONITOR RECORDER. REMOTE RECORDERS ARE MAIN CONDENSER OHS Iw
~IE QUADRANT 4 Hc. I/4 4 50467 Sc 460 Hc I/4 4 FAIL TO SC 255 Sc 471 I
F QF 255 I
SC.472 SC.473 LOCATED ON THE SECONDAR Y CHEM CONTROL INDICATINGPANEL IJC MSS A 255 TURBINE BYPASS Hc I/4 4 CONDENSER MAIN CONDENSER SC 410 BUILDING SUMP VACUUM PUMP 4 SC 474 H M~T SJSYGSID)26 QUADRANT 4 SAMPLE HEAT EXCHANGER LS
~ ~a SUSM 02 SJ-SYS 310-125 F 259 HGP)/4 .4 Hc I/4 4 Sc 475 SC.476 SC477 COMBUSTION lff0URLPIUU INC KR Secs Wl>>fflffff.CUUUKTKVI IB Bl I A 259 Hc I/4 4 CONDENSER 30489 SODIUM MONITOR HOTWELL SECONDARY CHEMISTRY CONTROL SYSTEM Figure ICHEMICAL MONITORING)
$ %6$ P I PIPING AND INSTRUMENTATION DIAGRAM 10.4.6-2 Amendment 10 10B 36 Angnst 257 1975