ML18193A922
| ML18193A922 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/28/1975 |
| From: | Arizona Nuclear Power Project |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18193A922 (1) | |
Text
I-ROM CONDENSATE SYSTEM STARTUP RECIRC TO CONDENSER TO CONDENSER A FROM 1ST POINT E XTR ACTI0 N HP TURBINE FROM 1ST POINT EXTRACTION HP TURBINE TO CONDENSER 6 LCH LC TB TA LC H LC 5
FROM HEATER DRAIN PUMP A 4'ROM AUXILIARY FEE DWA TER SYSTEM TO CONDENSER 0 DISCH TO COND 6 FROM 2ND POINT EXTRACTION HP TURBINE HIGH PRESSURE FEEDWATER HEATERS DISCH TD COND A FROM 2ND POINT EXTRACTION HP TURBINE FEEDWATER PUMP MINI FLOW TO CONDENSER A STEAM GENERATOR MAIN FEEDWATER PUMPS EIP FY HIS CR E p FY FC CHIC E'P FY FEEDWATER CONTROL SYSTEM Q-4 CHIC FC EIP FY LCH DISCH TO COND B LC 66 6A LC LCH DISCH TO COND A OFC FT FROM CONDENSATE SYSTEM OHS FROM 3RO POINT EXTRACTION HP TURBINE FROM 3RD PDI NT EXTRACTION HP TURBINE CR MS I 5 CLOSES FT 5
2 AS QFT gHS 2
5 MS IS CLOSES AS 2
5 AS 5B 5A CR QHS M
FROM HEATER DRAIN PUMP 6 CLOSES AS FC AS AS HEATER DRAIN TANK 6 LCH LC HEATER DRAIN TANKA LCH LC LO LO CHANGE 10402.11 A 21 F65-42 BOTTOM NOZZLE MIDDLE NOZZLE TO STEAM GE¹RATOR NO I FIG 10*1 UPPER NOZZLE UPPE R NOZZLE MIDDLE NOZZLE TO STEAM GENERATOR NO 2 FIG 10 3-1 BOTTOM NOZZLE HEATER DRAIN TANK DUMP TO CONDENSER A HEATER DRAIN PUMP 6 FC FT TO FEEDWATER PUMP SUCTION TRAIN ~
HEATER DRAIN TANK PUMP TO CONDENSER A HEATER DRAIN PUMP A FC FT TO FEEDINATER PUMP SUCTION TRAIN 6 Arizona Nuclear Power Project Palo Verde Nuclear Generating Station Units l,2& 8 BASIC FLOW DIAGRAM FEEDWATER SYSTEM Figure 10.4-8 February 28, 1975 Amendment 4