ML18193A895

From kanterella
Jump to navigation Jump to search
Figure 9.2-3, Basic Flow Diagram Nuclear Cooling Water System (Sheet 1 of 2)
ML18193A895
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/02/1975
From:
Arizona Nuclear Power Project
To:
Office of Nuclear Reactor Regulation
References
Download: ML18193A895 (1)


Text

FROM DEMINERALIZED WATER TANK CRg ~TT TE FROM SHT 2 FIG 3.2 3 Y

VENT LC WASTE GAS COMPRESSOR NO. I CR QSH LT CR LC SURGE TANK REACTORCOOLANT SAMPLE COOLER NO. I CR LC WASTE GAS COMPRESSOR AFTER COOLER NO I CR

,3 CR

+F1 NEWS HEAT EXCHANGER NO I REACTORCOOLANT SAMPLE COOLER NO. 2 WASTE GAS COMPRESSOR NO 2 CRQ -@IT TE CR

+F1 AUXIMARVSLOG CHILLER NO I PRESSURIZER VAPOR SPACE SAMPLE COOLER WASTE GAS COMPRESSDR AFTER COOLER NO. 2 CR gn Q QFI 96--

CHER NCWS HEAT EXCHANGER NO. 2 gHS AUXILIARYSLOG CHILLER NO 2 PRESSURIZER SURGE SAMPLE COOLER RADWASTE EVAPORATOR PACKAGE CR Q- -QTT TE FT QFI 6

CR HS NCWS PUMP NO. I Pl NEWS PUMP NO. I OILS SEAL COOLER AUXILIARYSLOG CHILLER NO. 3 BORIC ACID CONCENTRATOR PACKAGE CR

-QTT TE F2 CR QFI NEWS PUMP NO. 2 FILL Pl VENT PSL CR

- -6 CR CR (PPSH

- AH NCWS PUMP NO 2 OIL 3 SEAL COOLER FROEI Fl GAS STRIPPER (FFT NOTE SYSTEM IS NON NUCLEAR SAFETY CHANGE NCWS CHEMICAL ADDITIONTANK e-6 FSH TO SHT 2 FIG 3.2-3 Arizona Nuclear Power Project Palo Verde Nuclear Generatrng Statron Units 1,2& 3 BASIC FLOW DIAGRAM NUCLEAR COOLING WATER SYSTEM (StLeet 1 of 2)

Figure 9.2-3 10401-1 \\ A 12M YE-451 June 2,

1975 Amendment 7