ML18193A895

From kanterella
Jump to navigation Jump to search
Figure 9.2-3, Basic Flow Diagram Nuclear Cooling Water System (Sheet 1 of 2).
ML18193A895
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/02/1975
From:
Arizona Nuclear Power Project
To:
Office of Nuclear Reactor Regulation
References
Download: ML18193A895 (1)


Text

g CR FROM SHT 2 FROM DEMINERALIZED WATER TANK ~TT TE FIG 3.2 3 Y VENT LC WASTE GAS CR COMPRESSOR NO. I CR QSH LT LC SURGE TANK REACTORCOOLANT SAMPLE COOLER NO. I CR LC CR WASTE GAS COMPRESSOR AFTER COOLER NO I +F1 CR

,3 REACTORCOOLANT SAMPLE COOLER NO. 2 CR WASTE GAS COMPRESSOR NO 2 +F1 CR NEWS HEAT EXCHANGER NO I Q -@IT TE WASTE GAS COMPRESSDR QFI PRESSURIZER AFTER COOLER NO. 2 VAPOR SPACE CR AUXIMARVSLOG CHILLER NO I SAMPLE COOLER gn Q

NCWS HEAT EXCHANGER NO. 2 RADWASTE EVAPORATOR PACKAGE FT QFI 96-- AUXILIARYSLOG CHILLER NO 2 PRESSURIZER SURGE SAMPLE COOLER Q-CR

-QTT TE CHER gHS CR BORIC ACID CONCENTRATOR F2 QFI Pl PACKAGE 6HS CR NCWS PUMP NO. I NEWS PUMP NO. I OILS SEAL COOLER AUXILIARYSLOG CHILLER NO. 3 CR

-QTT TE PSL GAS STRIPPER NEWS Pl - -6 CR (FFT PUMP NO. 2 FROEI Fl CR CR NCWS PUMP NO 2

- OIL 3 SEAL COOLER (PPSH AH NOTE FILL SYSTEM IS NON NUCLEAR SAFETY VENT Arizona Nuclear Power Project Palo Verde Nuclear Generatrng Statron Units 1,2& 3 NCWS CHEMICAL ADDITION TANK e-6 BASIC FLOW DIAGRAM NUCLEAR COOLING FSH TO SHT 2 WATER SYSTEM (StLeet 1 of 2)

CHANGE FIG 3.2-3 Figure 9.2-3 10401-1 \ A June 2, 1975 Amendment 7 12M YE-451