ML18193A546
| ML18193A546 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/10/1975 |
| From: | Arizona Public Service Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18193A546 (1) | |
Text
Table 331.2-4 LOADS AND RESOURCES
SUMMARY
FOR SOUTHERN CALIFORNIA EDISON COMPANY 1964 THROUGH 1988
] 964
] 965
] 966 1967 1968 1969 1970 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1.1.1 Load Characteristics Demand Company Peak Demand 1
Firm Sales Outside ANPP Annual Peak Demand (CPD + FS)
Firm Purchases Outside ANPP 1
2 3
Adjusted Annual Peak Demand (APD-FP-ID) 56]7 6Q34 6448 7164 7707 8092 8556 9632 10132 10535 10279 10705 11195 11715 12265 12835 13435 14075 14745 15455 16185 16945 17745 18565 19415 0
0 0
0 0
0 185 185 0
136 135 129
] 63 5617 6034 6448 7164 7707 8092 8556 9817 10317 10535 10279 10712 11202 11722 12287 12864 13471 14075 14751 15542 16286
]708]
17880 18694 19578 (363)
(260)
(378)
(376)
(376)
(376)
(517)
(611)
(611)
(611)
(611)
(611)
(611)
(611)
(611)
(611)
(611)
(611)
(611)
(611)
(94) 56]7 6034 6448 7164 7344 7832 8178 9441 9941 10159 9762 10101 10591 11111 11676 12253 12860 13464 14140 14931 15675 16470 17269 18083
] 9484 0
7 7
7 22 29 36 0
6 87 101 1.1.1 Load Characteristics Energy Company Energy (GWH)
Firm Energy Sales Outside ANPP (GWH)
Annual Energy (CE+FES)
(GWH)
Firm Energy Purchases Outside ANPP (GWH)
Adjusted Annual Energy (AE-FEP)
(GWH) 31529 612 32141 32141 34499 420 34919 34919 37821 40592 44088 46953 511 675 529 772 38332 41267 44617 47725 38332 41267 44617 47725 49961 963 50924 50924 52840 55608 57486 55113 1323 1687 1944 1492 54163 57295 59430 56605 54163 57295 59430 56605 56080 57505 2114 2347 58194 59852 58194 59852 59745 62496 65386 68416 72096 2331 2528 2536 2664 2656 62076 65024 67922 71080 74752 62076 65024 67922 71080 74752 75966 2743 78709 78709 80116 2971 83087 83087 84336 88746 3170 3301 87506 92047 87506 92047 93486 97826 102276 3408 2977 2789 96894 100803 105065 96894 100803 105065 1.1.2 Power Supply Installed Resources Total F)on-Firm Purchases 6753 7087 8047 8871 9087 9724 10638 11107 12343 13024 13133 13161 13278 13800 14272 14452 15180 15850 17211 18258
]879]
] 941]
2Q366 2]577 Total Non-Firm Sales Capability (IR+TNFP-TNFS) 6753 7Q87 8047 8871 9Q87 9724 10638 11107 12343 13024 13133 13161 13278 13800 14272 14452 15180 15850 17211 18258 18791 19411 20366 21577 23134 1.1.3 Capacity Requirement Reserve (C-AAPD)
Percent Margin (100 X r/AAPD) 1136 1053 1599 1707 1743 1892 2460 1666 2402 2865 3371 3060 2687 2689 2596 20.2 17.5 24.8 23.8 23.7 24.2 30.1 17.6 24.2 28.2 34.5 30.3 25.4 24.2 22.2 2199 2320 2386 3071 3327 3116 2941 3097 3494 3650 17.9 18.0 17.7 21.7 22.3 19.9 17.9 17.9 19.3 18.7 Southern California Edison does not have any firm sales or purchases within ANPP Total firm purchases for which reserve capacity must be provided by the supplier Southern California Edison does not have any interruptible demand All figures are in MW unless noted otherwise.
NOTE:
The reserve margins are calculated based on the WSCC method which reduces annual peak demand by the amount of firm purchases.
The method SCE uses for internal planning includes firm purchases as resources, and results in slightly lower margins than the WSCC method.
Supplement No.
6 October 10, 1975 90