ML18193A529

From kanterella
Jump to navigation Jump to search
Table A1.2-4, Loads and Resources Summary, El Paso Electric Company, 1964 Through 1988, Sheet 7 of 8
ML18193A529
Person / Time
Site: Palo Verde  
Issue date: 10/10/1975
From:
Arizona Public Service Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18193A529 (1)


Text

Table A1.2-4 LOADS AND RESOURCES

SUMMARY

EL PASO ELECTRIC COMPANY 1964 THROUGH 1988 (Sheet 7 of 8)+

1.1.1 Load Characteristic

- Energy GWH Company Annual Energy Firm Energy Sales Outside ANPP Firm Energy Purchase Outside ANPP Annual Energy Requirement 1414 1494 1593 1695 1888 2129 2130 2221 2421 2872 2968 3162 3406 3612 3962 4209 4422 4742 5025 81 88 102 122 145 188 206 240 (None in EPEC) 319 448 420 461 474 540 481 547 667 egg 248 272 296 325 353 381 409 (None in EPEC) 1495 1582 1695 1817 2033 2317 2336 2461 2740 3320 3388 3623 3880 4152 4443 4756 5089 4971 5273 5628 6007 1.1.2 Power Supply Installed Resources Non-Firm Purchases Outside ANPP Non-Firm Purchases Within ANPP Total Purchases Non-Firm Sales Outside ANPP Non-Firm Sales Within ANPP 419 419 530 530 495 535 642 642 (None in EPEC)

(None in EPEC) 755 740 758 913 903 973 1053 1018 1068 1068 1248 1195 1395 1395 1595 1845 1845 50 75 75 75 75 (None in EPEC) 85 45 85 45 (None in EPEC)

Total Sales Capability (IR 6 NFP - NFS) 419 419 530 530 495 535 642 642 755 740 758 913 903 50 973 1003 1018 1143 1143 1248 1280 1395 1440 1595 1845 1845 1.1.3 Capacity Requirement Reserve 118 89 175 169 94 87 173 141 212 122 120 237 183 196 190 140 197 205 243 203 241 204 271 427 326 Percent Margin 39. 2 27. 0 49. 2 46.8 23.4 19.4 36.9

28. 1 39.0 19. 7 18.8
35. 1 25.4 25. 2 23.4 15.9 20.8 21.9
24. 2 18.8 20.9 16. 5 20.5
30. 1
21. 5 eA11 figures are in MW unless otherwise noted Revised 24 April 1975 IRT & HLP Supplement No.

6 October 10, 1975