Figure 13.2-1, Staffing and Training Program (Sheet 1 of 2)
ML18193A495
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/02/1975
From:
Arizona Public Service Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18193A495 (1)


Text

YEAR 6 YEAR 5 YEAR 4 YEAR 't YEAR I YEAR 2 YEAR 3 YEAR 4 YEAR 5 72717069686766656483626'160595857565554535251504S484746464443424140393837 3635343332 31302928272625242322212019181716't514'13121110 8

8 7

6 5 4 3

2 1

1 2

3 4

5 6

7 tl 9101'112131415161715'19 2021 2223242526272S293031 3233343536373839404142434445464748495051 5253545556 NUMBER OF PERSONNEL IN CL 55 FICATIONS FQR I ~ ITIAL STAFF AND UN T STARTUP CONSTRUCTIDN PERMIT NUCMAR PLANVDBSER.~

ATfotf CE TECH SUBM 3 FSAR COLO HYDRO UNIT I OPERAT NG FUEL PERMIT LOADING UNIT I COMMERCIAL OPERATION UNIT I NUMBER OF PERSONNELIN CLASSIFICATIONS FOR TWO UNITS OPERATION COLD tt'tDR UNIT FUBL LDAINNG tt NIT 2..

COMMERC IAL DPERATIQM UtlIT 2 NUMBEROF VERBot4NEL Ilf vlstefFtCATID tlNITS OPBRATI Ns FOR THREC QN COLD HYDRO UNtTS FUEL 4 0 Asti 60 UNIT 3 COMMERCIAL

'OPERATION Utlf7 3 PLANT MANAGER ASSISTANT PLANT MANAGER I

SL PERSONNEL ACQUISITION 2

DES CN FOLLOIH 3 NttCLEAff'PLANT

'MSERVATION I

PERSONNEL ACQUISITION I

2 DESIGN 5 CONSTR UCTIDN FOLLOW 3

ESTABL SH TRAININGREQUIRE I

NUCLEAR FUND 6 V~ EORV 2.

DESIGN 5 CONSTR UCTION FOLLOW ESTABLISH ADMINISTRATIVE It PROCEDURE SYSTEM jj2 STARTUP AND TESTING 3.

ASSUMES NORMAL FUNCTION

~SIM TRNG PERSONNEL ACQU SIT ON fi TRAINING 2

FINAL MANUAL4 PROCEDURE PREPARATION 3

STARTUPB TEST IIG 4

AMUME NORMAL FUNCTION STARTUP AND TESTING INTENS VE ONSITE TRAINING FINAL MANUALPREPARATION ASSUME NORMAL FUNCTION CL NOTES NUMBER OF PERSONNEL IN CLASSIFICATION A

NUMBER OF ASSISTANTS IN CLASSIFICATION TECHNICALSUPERVISOR OPERATIONS SUPERVISOR MAINTENANCESUPERVISOR SL 1

SL I

I j

SAME AS ABOVE I

I I

I SAME AS BOVE I

I I

I SAME AS A6OYE I

SAME AS A6OVE S

ME AS ABOVE SAME 5 A6OYE SIM VRNGt 5 M VRNCI SAME 5 46OVE 5

ME AS ABOVE SAME AS BOVE CL CL IA SL RO CL HL SENIOR REACTOR OPERATOR LICENSE REACTOR OPERATOR LICENSE COLD LICENSE HOT LICENSE TECHNICALASSISTANT HEALTH, SAFETY AND CHEMISTRY SUPERVISOR I

SL FSAR 6 TECHNICAL SPECIFICATION l PREPARATION 2

DESIGN 5 CONSTRUCTION I

FOLLOW 3

PERSONNEL ACQUISIT ON I

I PERSONNEL ACQUISITION 2

FSAR 6, TECHNICAL SPEC FICATION 3.

ESTABLISH TRA NING REQUIREMENTS 6 SCHEDULES SAME AS ABOVE SAME AS ABOVE SIM TRNCj~

SAME AS ABOVE SAME AS ABOVE CL NUCLEAR ENGINEER jl ORIENT I

FUEL MANAGEMENTTRAINING 2.

COMPUTER TRAINING

3. CONSTRUCTION FOLLOW 5 1M TRNG SAME AS ABOVE IA 1A MECHANICALENGINEER I

NSERVICE I ~ SPECTION I

2 STARTUP

  • TESTING 3.

FINAL MANUALPREPARATION I

4 ASSUME NDRMAL FUNCTION IA ELECTRICAL ENGINEER I

PERSONNEL ACQUISITION

2. FINAL MANUALPRE PAR T ON 3

STARTUP6 TESTING 4

ASSUME NORMAL F UNCTIO I

IA 1A INSTRUMENT AND CONTROLS ENGINEER SAME AS ABOVE SHIFT SUPERVISOR SL 5

PER6ON ~ EL ACQU S TION 2

PREPARATION OF TEST OPERATING PROCEDURES 3

CONSTRUCTION FOLLOW IMULATOR RAINING SAME AS ABOVE CL SA IOA QUALITYASSURANCE ENGINEER I

I PREPARE OPERATIONAL MANUAL I

2 ASSUME NORMAL FUNCTION I

HEALTH PHYSICS SUPERVISOR CHEMISTRY SUPERVISOR SENIOR CONTROL OPERATOR RO 5

IttloLEAR PLANTOBSERI ATION~

I I

It ORIMV I I I NUCLEAR FUND I

6 THEORY I 2 DE51GN 6 CONSTRUCT 0 ~

FOLLDW I

t.

PREPARATION OF TESTS OPERATIN PROCEDURES t

2.

STAR TUP 4 TESTING 3.

FINAL MANUALPREPARATION I

4.

ASSUME NORMAL FUNCTION I

I PREPARATION OF TEST 6 OPERATING PROCEDURES I

2 CONSTRUCTION FOLLOW I

C E TECH lsIM TRNG EMERGENCY PLAN PREPARATION I

2 PREPARATION QF TESTS,OPERATIN PROCEDURES 3

FINAL MANUALPREPARATION 4.

ASSUME NORMAL FUNCTIDN INTENSIVE ONS TE TRAINING 2

STARTUP 6 TESTING 3

FINAL MANUALPREPARATION 4

ASSUME NORMAL FUNCT ON CL 10 14 Arizona Nuclear Power Project Palo Verde Nuclear Generating Station Units l, 2 & 3 CHANGE.

ADMINISTRATIVESUPERVISOR COMPUTER ENGINEER I

I I

ESTABLIS ADMINISTRATIVEPROCEDURES

~ 2 ASSISTANT SUPERVISION I

3 ASSUME NORMAL FUNCTIONS I

COMPUTER TRAI~ ING 2

STARTUP 6 TESTING I

3 ASSUME NORMAL FUNCTION STAFFING AND TRAINING PROGRAM (SlTeet I of 2)

Figure 13.2-1 10407-1 TA 1 6MY5-215 June 2,

1975 Amenoment 7