YEAR 6 YEAR 5 YEAR 4 YEAR 't YEAR I YEAR 2 YEAR 3 YEAR 4 YEAR 5 72717069686766656483626'160595857565554535251504S484746464443424140393837 3635343332 31302928272625242322212019181716't514'13121110 8
8 7
6 5 4 3
2 1
1 2
3 4
5 6
7 tl 9101'112131415161715'19 2021 2223242526272S293031 3233343536373839404142434445464748495051 5253545556 NUMBER OF PERSONNEL IN CL 55 FICATIONS FQR I ~ ITIAL STAFF AND UN T STARTUP CONSTRUCTIDN PERMIT NUCMAR PLANVDBSER.~
ATfotf CE TECH SUBM 3 FSAR COLO HYDRO UNIT I OPERAT NG FUEL PERMIT LOADING UNIT I COMMERCIAL OPERATION UNIT I NUMBER OF PERSONNELIN CLASSIFICATIONS FOR TWO UNITS OPERATION COLD tt'tDR UNIT FUBL LDAINNG tt NIT 2..
COMMERC IAL DPERATIQM UtlIT 2 NUMBEROF VERBot4NEL Ilf vlstefFtCATID tlNITS OPBRATI Ns FOR THREC QN COLD HYDRO UNtTS FUEL 4 0 Asti 60 UNIT 3 COMMERCIAL
'OPERATION Utlf7 3 PLANT MANAGER ASSISTANT PLANT MANAGER I
SL PERSONNEL ACQUISITION 2
DES CN FOLLOIH 3 NttCLEAff'PLANT
'MSERVATION I
PERSONNEL ACQUISITION I
2 DESIGN 5 CONSTR UCTIDN FOLLOW 3
ESTABL SH TRAININGREQUIRE I
NUCLEAR FUND 6 V~ EORV 2.
DESIGN 5 CONSTR UCTION FOLLOW ESTABLISH ADMINISTRATIVE It PROCEDURE SYSTEM jj2 STARTUP AND TESTING 3.
ASSUMES NORMAL FUNCTION
~SIM TRNG PERSONNEL ACQU SIT ON fi TRAINING 2
FINAL MANUAL4 PROCEDURE PREPARATION 3
STARTUPB TEST IIG 4
AMUME NORMAL FUNCTION STARTUP AND TESTING INTENS VE ONSITE TRAINING FINAL MANUALPREPARATION ASSUME NORMAL FUNCTION CL NOTES NUMBER OF PERSONNEL IN CLASSIFICATION A
NUMBER OF ASSISTANTS IN CLASSIFICATION TECHNICALSUPERVISOR OPERATIONS SUPERVISOR MAINTENANCESUPERVISOR SL 1
SL I
I j
SAME AS ABOVE I
I I
I SAME AS BOVE I
I I
I SAME AS A6OYE I
SAME AS A6OVE S
ME AS ABOVE SAME 5 A6OYE SIM VRNGt 5 M VRNCI SAME 5 46OVE 5
ME AS ABOVE SAME AS BOVE CL CL IA SL RO CL HL SENIOR REACTOR OPERATOR LICENSE REACTOR OPERATOR LICENSE COLD LICENSE HOT LICENSE TECHNICALASSISTANT HEALTH, SAFETY AND CHEMISTRY SUPERVISOR I
SL FSAR 6 TECHNICAL SPECIFICATION l PREPARATION 2
DESIGN 5 CONSTRUCTION I
FOLLOW 3
PERSONNEL ACQUISIT ON I
I PERSONNEL ACQUISITION 2
FSAR 6, TECHNICAL SPEC FICATION 3.
ESTABLISH TRA NING REQUIREMENTS 6 SCHEDULES SAME AS ABOVE SAME AS ABOVE SIM TRNCj~
SAME AS ABOVE SAME AS ABOVE CL NUCLEAR ENGINEER jl ORIENT I
FUEL MANAGEMENTTRAINING 2.
COMPUTER TRAINING
NSERVICE I ~ SPECTION I
2 STARTUP
- TESTING 3.
FINAL MANUALPREPARATION I
4 ASSUME NDRMAL FUNCTION IA ELECTRICAL ENGINEER I
PERSONNEL ACQUISITION
- 2. FINAL MANUALPRE PAR T ON 3
STARTUP6 TESTING 4
ASSUME NORMAL F UNCTIO I
IA 1A INSTRUMENT AND CONTROLS ENGINEER SAME AS ABOVE SHIFT SUPERVISOR SL 5
PER6ON ~ EL ACQU S TION 2
PREPARATION OF TEST OPERATING PROCEDURES 3
CONSTRUCTION FOLLOW IMULATOR RAINING SAME AS ABOVE CL SA IOA QUALITYASSURANCE ENGINEER I
I PREPARE OPERATIONAL MANUAL I
2 ASSUME NORMAL FUNCTION I
HEALTH PHYSICS SUPERVISOR CHEMISTRY SUPERVISOR SENIOR CONTROL OPERATOR RO 5
IttloLEAR PLANTOBSERI ATION~
I I
It ORIMV I I I NUCLEAR FUND I
6 THEORY I 2 DE51GN 6 CONSTRUCT 0 ~
FOLLDW I
t.
PREPARATION OF TESTS OPERATIN PROCEDURES t
2.
STAR TUP 4 TESTING 3.
FINAL MANUALPREPARATION I
4.
ASSUME NORMAL FUNCTION I
I PREPARATION OF TEST 6 OPERATING PROCEDURES I
2 CONSTRUCTION FOLLOW I
C E TECH lsIM TRNG EMERGENCY PLAN PREPARATION I
2 PREPARATION QF TESTS,OPERATIN PROCEDURES 3
FINAL MANUALPREPARATION 4.
ASSUME NORMAL FUNCTIDN INTENSIVE ONS TE TRAINING 2
STARTUP 6 TESTING 3
FINAL MANUALPREPARATION 4
ASSUME NORMAL FUNCT ON CL 10 14 Arizona Nuclear Power Project Palo Verde Nuclear Generating Station Units l, 2 & 3 CHANGE.
ADMINISTRATIVESUPERVISOR COMPUTER ENGINEER I
I I
ESTABLIS ADMINISTRATIVEPROCEDURES
~ 2 ASSISTANT SUPERVISION I
3 ASSUME NORMAL FUNCTIONS I
COMPUTER TRAI~ ING 2
STARTUP 6 TESTING I
3 ASSUME NORMAL FUNCTION STAFFING AND TRAINING PROGRAM (SlTeet I of 2)
Figure 13.2-1 10407-1 TA 1 6MY5-215 June 2,
1975 Amenoment 7