|
---|
Category:Drawing
MONTHYEARML23181A1702023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1692023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1682023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1672023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML21201A2652021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 10 Through Chapter 19, Figures (Redacted) ML21201A2612021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 2.5 Through Chapter 3, Figures (Redacted) ML21201A2662021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 4 Through Chapter 9, Figures (Redacted) ML19205A2202019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 1 Thru Chapter 2.4 (Redacted) ML19205A2222019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted) ML19205A2232019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted) ML19205A2212019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 2.5 Thru Chapter 3 (Redacted) ML18277A3032018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18193A8982018-08-0606 August 2018 Figure 9.2-4, Demineralized Water System Water Pretreatment Subsystem. ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18193A8992018-08-0606 August 2018 Figure 9.2-5, Demineralized Water System Water Demineralizer Subsystem. ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18192B8852018-07-30030 July 2018 Map 3-2, Proposed Palo Verde-Devers Transmission Line, Summary of Anticipated Impacts Kofa. ML18192B8872018-07-30030 July 2018 Map 3-4, Proposed Palo Verde-Devers 500KV Transmission Line, Vegetation Impacts ML18192B8862018-07-30030 July 2018 Map 3-3, Proposed Palo Verde-Devers 500KV Transmission Line, Geotechnical Sensitivity Excluding Soils. ML18192B8892018-07-30030 July 2018 Map 3-6, Proposed Palo Verde-Devers 500KV Transmission Line, Recreation Impacts. ML18193A0792018-07-30030 July 2018 Figure 10.4-8, Basic Flow Diagram Feedwater System. ML18193A0822018-07-30030 July 2018 Figure 11.2-2 P&I Diagram Liquid Radwaste System. ML18192B8922018-07-30030 July 2018 Map 3-9, Proposed Palo Verde-Devers 500kv Transmission Line, Cultural Resource Impacts. ML18192B8902018-07-30030 July 2018 Map 3-7, Proposed Palo Verde-Devers 500KV Transmission Line, Wilderness Impacts. ML18193A0802018-07-30030 July 2018 Figure 10.4-9, Auxiliary Feedwater System. ML18192B8912018-07-30030 July 2018 Map 3-8, Proposed Palo-Verde 500KV Transmission Line, Visual Impacts. ML18192B8882018-07-30030 July 2018 Map 3-5, Proposed Palo Verde-Devers 500 Kv Transmission Line, Land Use Impacts. ML18192C0052018-07-18018 July 2018 Drawing 13-E-ZJC-034, Rev. 0, Control Bldg Conduit Arrangement Plan at El 74ft Level Ab. ML18192B8372018-07-18018 July 2018 Figure 1, Red Lake Canyon - Mohave, Bridge Canyon Country Estates, Alternative Segments. ML18194A2582018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 44. ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A3672018-07-13013 July 2018 Figure 2E-2, Geomorphic Profiles, A-A' and B-B'. ML18194A2542018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 37. ML18194A0702018-07-13013 July 2018 Log of Boring PV-64 ML18194A2772018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Areas, 1 + 2. ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A0522018-07-13013 July 2018 Site Property ML18194A0692018-07-13013 July 2018 Log of Boring PV-63 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A3692018-07-13013 July 2018 Figure 2E-5, Location of Gila River Terraces and Major Photo Lineaments. ML18194A0582018-07-13013 July 2018 Figure 2.5-8, Sections Through Site Vicinity. ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A2602018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 32. ML18194A2612018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 33 + 34. ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A0672018-07-13013 July 2018 Figure 2.5-86, Location of Gila River Terraces in Relation to Lineaments. 2023-06-30
[Table view] |
Text
vcylr7//
vPppr -- ~
y//mm/
LITHOLOGIC DATA MULTIPLE POSITION EXTENSOMETER DATA DESCRIPTIONS Elev'.-954.54'ILTY SAIIO, (SM), red-brown, dry.
20 SANO, (SP-SW),
yellow-brown.
GRADING TO GRAVELLY SANO; (SP-SW),
SILTY SANO; (SM), red-brown, micaceous, gravel 40 lens at 39.5'nterboddsd with sand.
GRAVELLY SAND; (SP-SW), yellow-brown.
0 v n Sensor No,l5 Elev.-899.54'0 SILTY CLAY; (CL), GRADING TO SANDY CLAY; <CL), rerl-brown, low plasticity, micaceous, occasional gravel.
80 CLAYEY SILT; (ML), red-brown, nonplastic to low plasticity, moist, micaceous.
100 SILTY CLAY, (CL), rad-brown, low plastioity, mioaceous, occasional sand lens.
moist, 120 Sensor No 5 TT Elev 824.54'g 140 CLAYEY SILT, <ML), brown, firm, nonplastic to low plasticity, moist, micaceous.
160 SILTY CLAY-CLAYEY SILT, (CL-ML), brown, plasticity, firm, moist, micaceous.
low 180 SILTY CLAY, (CL), brown, low plasticity, stiff, moist, cemented send at firm to 200 1941-199'ensor SANDY SILT, (ML), brown to light brown, firm, moist, micaceous; trace of clay.
No i3 Tr Elev -74454'+220 240 260 SILTY CLAY; (CL-CH), red-brown, low to high plasticity, very stiff, moist, micaceous, occasional sand lenses.
280 300 320 CLAYEY to SILT, (ML),
stifr, moist.
light brown, low plasticity, firm 0
NOTES:
I. Bottom anchor is set at 330'.
34<>
Ip ADO VZPO FANGLOIIERATE; red fragments and black, angular volcanic
- 2. Boring drilled reamed and with z'p 5" ond 6 I/2" Drag Bits, respectively, to a depth of 327'.
T 5 -351 Bedrock drilled to 351.0'ith 360 6 I/2 Tm-Cone Rock Bit. 9'80 400 DEPTHS (FEET)
BORING LOG MPE-4 EXPLANATION DESCRIPTIONS Lithologic descriptions were compiled from field logs. Field logs were prepared in accordance with ASTM 02488-69. 4 oi c>
0 WATER LEVEL H
C Measured Water Level ET C+g0 Absence of symbol indicates that either the ID C
water level was not encountered or drilling g ro o
lii operations, caving, etc., prevented accurate I
x water level measurements. Measurements
' ILm m are approximate.
oi
<<A re m
0