|
---|
Category:Drawing
MONTHYEARML23181A1702023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1692023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1682023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1672023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML21201A2652021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 10 Through Chapter 19, Figures (Redacted) ML21201A2612021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 2.5 Through Chapter 3, Figures (Redacted) ML21201A2662021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 4 Through Chapter 9, Figures (Redacted) ML19205A2202019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 1 Thru Chapter 2.4 (Redacted) ML19205A2222019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted) ML19205A2232019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted) ML19205A2212019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 2.5 Thru Chapter 3 (Redacted) ML18277A3032018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18193A8982018-08-0606 August 2018 Figure 9.2-4, Demineralized Water System Water Pretreatment Subsystem ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18193A8992018-08-0606 August 2018 Figure 9.2-5, Demineralized Water System Water Demineralizer Subsystem ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18192B8852018-07-30030 July 2018 Map 3-2, Proposed Palo Verde-Devers Transmission Line, Summary of Anticipated Impacts Kofa ML18192B8872018-07-30030 July 2018 Map 3-4, Proposed Palo Verde-Devers 500KV Transmission Line, Vegetation Impacts ML18192B8862018-07-30030 July 2018 Map 3-3, Proposed Palo Verde-Devers 500KV Transmission Line, Geotechnical Sensitivity Excluding Soils ML18192B8892018-07-30030 July 2018 Map 3-6, Proposed Palo Verde-Devers 500KV Transmission Line, Recreation Impacts ML18193A0792018-07-30030 July 2018 Figure 10.4-8, Basic Flow Diagram Feedwater System ML18193A0822018-07-30030 July 2018 Figure 11.2-2 P&I Diagram Liquid Radwaste System ML18192B8922018-07-30030 July 2018 Map 3-9, Proposed Palo Verde-Devers 500kv Transmission Line, Cultural Resource Impacts ML18192B8902018-07-30030 July 2018 Map 3-7, Proposed Palo Verde-Devers 500KV Transmission Line, Wilderness Impacts ML18193A0802018-07-30030 July 2018 Figure 10.4-9, Auxiliary Feedwater System ML18192B8912018-07-30030 July 2018 Map 3-8, Proposed Palo-Verde 500KV Transmission Line, Visual Impacts ML18192B8882018-07-30030 July 2018 Map 3-5, Proposed Palo Verde-Devers 500 Kv Transmission Line, Land Use Impacts ML18192C0052018-07-18018 July 2018 Drawing 13-E-ZJC-034, Rev. 0, Control Bldg Conduit Arrangement Plan at El 74ft Level Ab ML18192B8372018-07-18018 July 2018 Figure 1, Red Lake Canyon - Mohave, Bridge Canyon Country Estates, Alternative Segments ML18194A2582018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 44 ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A3672018-07-13013 July 2018 Figure 2E-2, Geomorphic Profiles, A-A and B-B ML18194A2542018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 37 ML18194A0702018-07-13013 July 2018 Log of Boring PV-64 ML18194A2772018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Areas, 1 + 2 ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A0522018-07-13013 July 2018 Site Property ML18194A0692018-07-13013 July 2018 Log of Boring PV-63 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A3692018-07-13013 July 2018 Figure 2E-5, Location of Gila River Terraces and Major Photo Lineaments ML18194A0582018-07-13013 July 2018 Figure 2.5-8, Sections Through Site Vicinity ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A2602018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 32 ML18194A2612018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 33 + 34 ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2 ML18194A0672018-07-13013 July 2018 Figure 2.5-86, Location of Gila River Terraces in Relation to Lineaments 2023-06-30
[Table view] |
Text
TO LRWS HVAC DRAINS TO FLOOR DRAIN MISC CONTAINMENTFLOOR DRAINS SEAL INJECTION FILTER DRAINS (2)
SAFETY INJECTION SYSTEM DRAINS REACTOR LOOP DRAINS REFUELING DRAIN RC PUMP CONTROL BLEED-OFF HDR RELIEF SHUTDOWN COOLING RELIEF VALVE REFUELING POOL DRAIN PRESSURIZER RELIEF SAFETY INJECTION TANKDRAIN M
I M
HVAC DRAINS LRS WASTE HOLDUP TANKOVERFLOW (3)
LRS RECYCLE MONITOR TANKOVERFLOW (2)
LRS MIXEDBED ION EXCH'R. DRAINS(2)
LRS WASTE EVAP PACKAGE DRAIN GRS WASTE GAS COMPRESSOR DRAIN (21 CHEMICAL DRAIN TANKOVERFLOW CHEMICALDRAIN TANK DRAIN MISC PUMP DRAINS LRS MIXEDBED(ON EXCH'R PRE-FILTER DRAIN CHEMICALDRAINTANK FILTER DRAIN GRS SURGE TANKDRAIN GRS DECAY TANKDRAIN SPENT RESIN TANK DRAIN (2)
LRS CONCENTRATE TANKOVERFLOW 12)
CATALYSTTANKDRAIN LRS HOLDUP TANKDRAINS (31 LRS RECYCLE MONITOR TANK DRAINS (2)
MISC LOCALSAMPLE DRAINS SPENT RESIN TANK RELIEF VALVE MISC RADWASTE RELIEF VALVE 2
KQ K00 SPENT FUEL POOL (ON EXCHANGER AFTER FILTER DRAIN SPENT FUEL POOL PURIFICATION FILTER DRAINS SPENT FUEL POOL ION EXCHANGER DRAINS SHUTDOWN HE SHELL AND TUBE DRAINS MISC LOCALSAMPLE DRAINS EQUIPMENT DRAIN TANKDFIAIN EQUIPMENT DRAIN TANK RELIEF SAFETY INJECTION PUMP DRAINS HOLDUP TANKOVERFLOW MISC PUMP DRAINS REFUELING WATER TANKOVERFLOW REFUELING WATER TANKRELIEF MISC AUXBLDG FLOOR DRAINS HVAC DRAINS LETDOWN HE TUBE DRAINS ISOLATIONVALVELEAKOFFS HPSI PUMP COMPARTMENT LPSI PUMP COMPARTMENT CONTAINMENTSPRAY PUMP COMPARTMENT HPSI PUMP COMPARTMENT LPSI PUMP COMPARTMENT CONTAINMENTSPRAY PUMP COMPARTMENT CHEM DRAIN TANK RWS HVAC DRAINS SPENT FUEL POOL COOLING PUMP DRAINS SPENT FUEL POOL COOLING HE DRAINS SPENT FUEL POOL PURIFICATION PUMP DRAIN FUEL BLDG FLOOR DRAINS BORIC ACID CONCENTRATOR ION EXCHANGER BORIC ACID CONCENTRATOR ION EXCHANGER PRE.HOLDUP ION EXCHANGER VENT PRE-HOLDUP (ON EXCHANGER DRAIN PURIFICATION ION EXCHANGER DRAIN DEBORATING ION EXCHANGER DRAIN SAFETY INJECTION SAMPLE PURGE BORIC ACID BATCH(NG TANK REACTOR MAKE-UPWATER FILTER BORIC ACID FILTER PURIFICATION FILTERS (2)
CHARGING PUMP DRAINS AND LEAKAGE HYDROGEN RECOMBINER VOLUMECONTROL TANKDRAIN REACTOR DRAIN FILTER SAMPLING PURGE BORIC ACID CONCENTRATOR DRAINS LOW PRESSURE SAFETY INJECTION RELIEF SAMPLING HEADER RELIEFS HIGH PRESSURE SAFETY INJECTION R EL IEFS LETDOWN RE LIE FS SAMPLE VESSEL HEADERS VOLUMECONTROL TANKRELIEF CHARGING PUMP RELIEF SHUTDOWN COOLING RETURN LINE RELIEF VENT DRAIN TO ATMOSPHERE LAUNDRYDRAIN TANK LWS DRAIN TANKOVERFLOW LWS DRAIN TANK DRAIN LWS MIXEDBEO ION EXCHANGER PREFILTER LWS MIXED BED ION EXCHANGER DRAIN LWS ACTIVATEDCARBON BED DRAINS (2)
LWS MONITOR TANK OVERFLOW 12)
LWS RECYCLE MONITOR TANKDRAIN (2)
LWS DRAIN TANK PUMP DRAINS (2)
LWS RECYCLE MONITOR TANKPUMP DRAINS (2)
~H I
LSH TO VGCH
~H I
I I
LSH GASSURGE HEADER TO BRS OF CVCS LSH TO VGCH LSH H
I I
LSH TO VGCH LSH H
I I
LSH TO VGCH TRAIN A
~l I
I I
LSH TO VGCH TRAIN 6
LSH (APHHI I
LSH TO VGCH LSH TO VGCH TO BRS OF CVCS LSH TO ATMOSPHERE
~H I
I I
LSH LC CONTAINMENTSUMPISI REACTOR DRAINTANK INSIDE CONTAINMENT RADWASTE SLDG SUMP(S)
OUTSIDE CONTAINMENT AUXILIARYBLDG SUMP(SI ENGINEERED SAFETY FEATURES COMPARTMENTS SUMPS FUEL BLDG SUMP(S)
EQUIPMENT DRAIN TANK(S)B LAUNDRYAREA OF SERVICE BLDG SUMP(31 NOTES:
- 1. CHEMICAL LAB DRAINS 0 DECONTAMINATIONDRAINS DISCHARGE INTO THE CHEMICALDRAIN TANK-LIQUIDS CONTAINING DICHROMATE ARE ROUTED TO CHEMICAL DRAIN TANK
- 2. DRAINS ARE ROUTED TO THE RECEIVING TANKS DIRECTLYWHENEVER POSSIBLE LEGEND:
VGCH = VENT GAS COLLECTION HEADER ASSUMING ITEMS LOCATED IN BUILDINGAS NOTED
- 3. EQUIPMENT 0/OR DRAINAGE SYSTEMS LOCATED IN A SEISMIC CAT I AREA OR PART OF A SEISMIC CAT I SYSTEM ARE SEISMIC CAT R UP TO AND INCLUDING ISOLATION VALVES Arizona Nuclear Power Project Palo Verde Nuclear Generating Station Units 1,2& 2 EQUIPMENT AND FLOOR DRAINAGE SYSTEN FLOW DZAGRAN (Sheet 1 of 2)
Figure 9. 3-2 10007-1 I A 2'I MRS-35