ML18193A061
| ML18193A061 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/12/2018 |
| From: | Arizona Nuclear Power Project |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 9.2-5 | |
| Download: ML18193A061 (1) | |
Text
CATION EXCHANGER ANION EXCHANGER MIXED BED D E MINER ALIZE R r
L Pl Pl PROGRAM CONTROL RECIRCULATION PUMPS TO UNIT 3 DEMINERALIZED WATER STORAGE TANK TO UNIT 2 DEMINERALIZED WATER STORAGE TANK VENT FROM PRETREATMENT SUBSYST(M CATION EXCHANGER ANION EXCHANGER MIXEDBED DEMINERALIZER HS HS FE ------3 HIS LI LC UNIT NO. I DEMINERALIZED WATER STORAGE TANK ITYP)
RECIRCULATION TO CONDENSATE TANK TO REACTOR MAKEUP TANK (FFT
~FI OVERFLOW HS TO SPENT FUEL POOL MAKEUP CATION EXCHANGER ANION EXCHANGER MIXEDBED DEMINERALIZER TI TI WATER HEATERS TYPICAL FOR THREE UNITS I
I I
I I
I I
I HS Pl DEMINERALIZEDWATER TRANSFER PUMPS TO RADWASTE SYSTEM TO NUCLEAR COOLING WATER SYSTEM MAKEUP TO TURBINE COOLING WATER SYSTEM MAKEUP TO ESSENTIAL COOLING WATER SYSTEM A MAKEUP TO ESSENTIAL COOLING WATER SYSTEM B MAKEUP TC TC FILL VENT AIR DRYER
~FIL VENT PSV Pl Pl NOTE:
SYSTEM IS NON NUCLEAR SAFETY LI ACID STORAGE TANK Pl LI CAUSTIC STORAGE TANK QHS Pl LAHL BLOWDOWN TREATMENT FACILITY I 0 A 0 7. I I A 3APA-300 HSQ-ACID METERING PUMPS PSV MIXING TEE
+FE AT eb HSQ-PSV Pl CAUSTIC METERING PUMPS
~FE QFT "-Fl MIXING TEE LS I
L LS QHS--
QHS SPENT REGENERANT SUMP AND SUMP PUMPS Arizona Nuclear Power Project 7
Palo Verde Nuclear Generating Station Units 1, 2 & 3 DEMINERALIZED WATER SYSTEM WATER DEMINERALIKER SUBSYSTEM Figure 9.2-5