|
---|
Category:Drawing
MONTHYEARML23181A1702023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1692023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1682023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1672023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML21201A2652021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 10 Through Chapter 19, Figures (Redacted) ML21201A2612021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 2.5 Through Chapter 3, Figures (Redacted) ML21201A2662021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 4 Through Chapter 9, Figures (Redacted) ML19205A2202019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 1 Thru Chapter 2.4 (Redacted) ML19205A2222019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted) ML19205A2232019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted) ML19205A2212019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 2.5 Thru Chapter 3 (Redacted) ML18277A3032018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18193A8982018-08-0606 August 2018 Figure 9.2-4, Demineralized Water System Water Pretreatment Subsystem. ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18193A8992018-08-0606 August 2018 Figure 9.2-5, Demineralized Water System Water Demineralizer Subsystem. ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18192B8852018-07-30030 July 2018 Map 3-2, Proposed Palo Verde-Devers Transmission Line, Summary of Anticipated Impacts Kofa. ML18192B8872018-07-30030 July 2018 Map 3-4, Proposed Palo Verde-Devers 500KV Transmission Line, Vegetation Impacts ML18192B8862018-07-30030 July 2018 Map 3-3, Proposed Palo Verde-Devers 500KV Transmission Line, Geotechnical Sensitivity Excluding Soils. ML18192B8892018-07-30030 July 2018 Map 3-6, Proposed Palo Verde-Devers 500KV Transmission Line, Recreation Impacts. ML18193A0792018-07-30030 July 2018 Figure 10.4-8, Basic Flow Diagram Feedwater System. ML18193A0822018-07-30030 July 2018 Figure 11.2-2 P&I Diagram Liquid Radwaste System. ML18192B8922018-07-30030 July 2018 Map 3-9, Proposed Palo Verde-Devers 500kv Transmission Line, Cultural Resource Impacts. ML18192B8902018-07-30030 July 2018 Map 3-7, Proposed Palo Verde-Devers 500KV Transmission Line, Wilderness Impacts. ML18193A0802018-07-30030 July 2018 Figure 10.4-9, Auxiliary Feedwater System. ML18192B8912018-07-30030 July 2018 Map 3-8, Proposed Palo-Verde 500KV Transmission Line, Visual Impacts. ML18192B8882018-07-30030 July 2018 Map 3-5, Proposed Palo Verde-Devers 500 Kv Transmission Line, Land Use Impacts. ML18192C0052018-07-18018 July 2018 Drawing 13-E-ZJC-034, Rev. 0, Control Bldg Conduit Arrangement Plan at El 74ft Level Ab. ML18192B8372018-07-18018 July 2018 Figure 1, Red Lake Canyon - Mohave, Bridge Canyon Country Estates, Alternative Segments. ML18194A2582018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 44. ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A3672018-07-13013 July 2018 Figure 2E-2, Geomorphic Profiles, A-A' and B-B'. ML18194A2542018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 37. ML18194A0702018-07-13013 July 2018 Log of Boring PV-64 ML18194A2772018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Areas, 1 + 2. ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A0522018-07-13013 July 2018 Site Property ML18194A0692018-07-13013 July 2018 Log of Boring PV-63 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A3692018-07-13013 July 2018 Figure 2E-5, Location of Gila River Terraces and Major Photo Lineaments. ML18194A0582018-07-13013 July 2018 Figure 2.5-8, Sections Through Site Vicinity. ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A2602018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 32. ML18194A2612018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 33 + 34. ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A0672018-07-13013 July 2018 Figure 2.5-86, Location of Gila River Terraces in Relation to Lineaments. 2023-06-30
[Table view] |
Text
BACKHOE TRENCH PV-BH-20A N60oE South Wall
..o GRAVELLY SURFACE DEBRIS AND WEATHEREO BEDROCK - LT GRAY-BROWN LOOSE CLASTS NATURAL GROUND SURFACE ANO DEBRIS ANGULAR TO SUBANGULAR DISTURBED BY EXTENSIVE EQUIPMENT FEET ACTIVITY I I I I I I I 25 20 15 10 5 0 -5 -10 -15 STREAM BEO
',.E7, o
','ooc1'h),o'::o'h,o .P:0 Op'Og
.,o o()o.. o o..
pE)(7C'.00 D o
Q
~
OI(7:Z) oohoo'o o o 0R
~o,. d .
Cxe
'G', ~ h-I 'O(7'() o, Og0 d0hF '(-Io'gac7'go ., ~
oo g
.ooQ() ooxo o'o A'+
u.'0 o<9QO0'g o,
~QC>7 (7 o h p
c 6'o'h,o,c(og .OOOZI.E7+:OO
~
(7OP ~
' Pgf).:Yhg Q+cgg:25 pgD @0) ho + '.o "
Q'o (7 g
".o:F)'E7 .. '.Jv':l)'Eh "o (76
.'PA o'4 12
..o()i)g7: (70 7) 77, o0 o g g'c); 17o o gQ gx) d gQ 4 (fg" /pe
~
~jchQ . 'n. n7,.00~'hohD+ ~
')
14 ~ Oo oo JQ
.-' (7. o o: . o Q. Og (so 50 ':EJ 0. '26)'LR0UGH wEATHEREL'URFAGE I..D 0 g'b'4 oM'QdP'E7%~ o 'OOOI) Q E 'PoCQ 15g o
.. r, 0 0, 4(P UDcphU 730 7() (h ()
o.,(7Q .00(70 0Q'n'o Doo ~ 0(7 'n' p
F)L) c) 6 o
.'o g0' ch'(hnIT C7
'hQ,OO o g o h-".23'.Oo..n cT REA 0'..
III n.
o (7.
UsED (7':,
0, oo'O'.:, 60: < PO ':o",VP. o C'ho. gtf le'~'.3 Q 0:I?'o o~Q o 0~47 6';ooE)d).'EI'-
UPPER TRENCH AREA HIGHLY OISTURBEO BY EQUIPMENT I 12 OPERATION I I
I VERY SILTY PEBBLY SAND I
PROBABLY CROATAVINA I
OPEN BURROUGHS OBSERVED I
10 I
I BASALT LT GRAY TO GRAY PROPHYRI-TIC, HIGHLY JOINTED, MODERATELY FRAC-TURED, CALICHE COATING ANO CALCITE N64 W SHEAR 66'SW FILLINGS Oh DATUM BASALT REO-BROWN PORPHYRITIC IN-PLACE ALTERA710N OF PHENOCRYSTS SHEAR BRECCIA
'ALTEREO VOLCANICS, EXTEN-SIVELY FRACTURED HIGHLY-SOFT ALTERED BLUE-GRAY
~ CONTACT WHITE ALTERED GOUGE MATERIAL DATUM VQLCANICS To GREEN (SAUSSURITIZATION) AND FLOOR OF TRENCH REO-BROWN HIGHLY JOINTED FRACTURED N55 -63 W NUMEROUS CALICHE STRINGERS, CALCITE 67 NE AND CALICHE COATINGS ON FRACTURE CONTACT SURFACES, FRACTURES TIGHT AND UN-FILLED IN TRENCH BOTTOM SHEAR N55oW VERT nn'i H'I N50'W 76 SW FAULT FAULT A SHEARS DATUM DATUM CONVERGIHB TOWARD BOTTOM OF TRENCH AREA QF EXTENSIVE ALTERATION BASAL'I DARK GRAY TO LOCALLY RED-ANI} NUMEROUS SHEAR-LIKE BROWN, BRECCIATED, HIGHLY FRACTURED, h
SURFACES LT. GRAY, BROWN, CALICHE, CALCITE AND IRON OXIDE OXIDIZED ZONE RED-BROWN, GREENISH-GRAY, ohio CDATINGS OF FRACTURED SURFACES, HIGHLY FRACTURED, ABUNDANT ALTERED PHENOCRYS73 CALICHE N60 W VERT BASALT DARK RED-BROWN HIGHLY ALTEREO (FLOOR)
EXTENSIVELY FRACTURED HIGHLY OXIDIZED ZONE WHITE ALTERED GOUGE MATERIAL-PINCHES OUT NEAR TIIENCH BOTTOM, N55 6 75'SW SHEARED, SOFT,
" CI.AY-LIKE ", ABRUPT CONTACT WITH OXIDIZED VOLCANICS ON CHANGE (FLOOR) WEST, IRREGULAR, GRADATIONAL CON- Date of Excavation 9-26-76 TACT WITH BLUE GRAI VOLCANICS LOG OF TRENCH PV-BH-20A November 17, 1975 Amendment 14