Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 1999-09-08
[Table view] |
Text
e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 16, 1993 U.S. Nuclear Regulatory Commission Serial No.92-846 Attention: Document Control Desk NL&P/RMN R16 Washington, D.C. 20555 Docket Nos. 50-280 50-281 50-338 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 RESPONSE TO NRC BULLETIN 90-01, SUPPLEMENT 1 LOSS OF FILL-OIL IN ROSEMOUNT TRANSMITTERS We have received your December 22, 1992 letter concerning loss of fill-oil in pressure transmitters manufactured by Rosemount. Based on a March 8, 1993 discussion between Mr. L. Engle of the NRC and Mr. J. Hegner of Virginia Electric and Power Company, the response date for this submittal was extended from March 8 to March 15, 1993. Our response is provided in the attachment.
If you have any questions or require additional information, please contact us.
Very truly yours,
. ~j ~,~;::.;.~.:)::- .
,-.; j ' - >.:}J ""**
W. L. Stewart Senior Vice President - Nuclear Attachment 220017.,~
9303190336 930316 PDR ADOCK 05000280 G PDR
cc: U.S. Nuclear Regulatory Commission Region II .
101 Marietta Street, N.W.
Suite 2900 Atlanta, Georgia 30323 Mr. M. S. Lesser NRC Senior Resident Inspector North Anna Power Station Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station
RESPONSE TO NRC BULLETIN NO. 90-01 SUPPLEMENT 1:
LOSS OF FILL-OIL IN TRANSMITTERS MANUFACTURED BY ROSEMOUNT NORTH ANNA AND SURRY POWER STATIONS On December 22, 1992, the Nuclear Regulatory Commission (NRC) issued Supplement 1 to NRC Bulletin 90-01. The Supplement requires that all holders of operating licenses or construction permits for nuclear power reactors identify and take appropriate corrective actions for Model 1153, Series B, Model 1153, Series D, and Model 1154 Rosemount manufactured transmitters that may be leaking fill-oil.
NRC Bulletin 90-01, Supplement 1, requests that each licensee of nuclear power reactors perform the following actions for operating nuclear power reactors. The item numbers used below correspond with those in the Supplement.
- 1. Review plant records and identify any Rosemount Model 1153 Series B, Model 1153 Series D, and Model 1154 transmitters manufactured before July 11, 1989, that are used or may be used in the future in either safety-related systems or systems installed in accordance with 10 CFR 50.62 (the ATWS rule), and
- a. Expeditiously replace, or monitor for the life of the transmitter on a monthly basis using an enhanced surveillance monitoring program, any transmitters that have a normal operating pressure greater than 1500 psi and that are installed in reactor protection trip systems, ESF actuation systems or ATWS systems. Action for those transmitters that have not met the Rosemount psi-month threshold criterion should be expedited. At their discretion, licensees may monitor using an enhanced surveillance program at least once every refueling cycle, but not exceeding 24 months, transmitters in this category if the appropriate psi-month threshold criterion recommended by Rosemount has been reached, and the monitoring interval is justified based upon transmitter performance in service and its specific safety function. The justification should show that a sufficiently high level of reliability for the function is provided by the redundancy or diversity of applicable instrumentation and control systems, commensurate with the importance of the function, when considered in conjunction with the overall performance of the reactor protection trip system, ESF actuation systems, or ATWS system. Provide to the NRC a copy of the licensee justification to extend the enhanced surveillance program beyond the monthly test interval for transmitters that have reached the appropriate psi-month threshold criterion recommended by Rosemount.
Page 1 of 8 L
e
Response
The transmitters at North Anna and Surry that meet this criterion are the pressure, flow, and level protection transmitters associated with the reactor coolant system (RCS). We will continue the present monthly operational monitoring of these transmitters.
Transmitter calibration procedures and training programs were revised after the issuance of the original bulletin to alert instrument technicians and operators to the problem of loss of fill-oil, and the signs when this phenomenon may be occurring. The technicians test the transmitter during calibration for sluggish response to step increases and decreases in pressure. The enhanced calibration program includes trending calibration results with a computer based system that calculates the zero shift that occurred between calibrations. Enhanced calibration/testing of these transmitters will continue to occur every refueling cycle, not exceeding 24 months.
- b. Replace, or monitor for the life of the transmitter on a quarterly basis using an enhanced surveillance monitoring program, any transmitters that have a normal operating pressure greater than 1500 psi and that are used in safety-related applications but are not installed in reactor protection trip systems, ESF actuation systems, or ATWS systems. At their discretion, the licensee may monitor using an enhanced surveillance program at least once every refueling cycle, but not exceeding 24 months, transmitters in this category if the appropriate psi-month threshold criterion recommended by Rosemount has been reached, and the monitoring interval is justified based upon transmitter performance in service and its specific function. Provide to the NRC a copy of the licensee justification to extend the enhanced surveillance program beyond the quarterly test interval for transmitters that have reached the appropriate psi-month threshold criterion recommended by Rosemount.
Response
The transmitters at North Anna and Surry that meet this criterion are the reactor coolant system wide range pressure transmitters, high head safety injection (HHSI) flow transmitters, and charging system makeup flow transmitters.
The reactor coolant system wide range pressure transmitters have reached their psi-month threshold. Enhanced calibration/testing of these transmitters will continue to occur every refueling cycle, not exceeding 24 months.
Page 2 of 8
The HHSI flow transmitters do not see any flow during normal plant operation. Flow from the HHSI pumps goes to _two headers. Each header has two redundant flow transmitters outside containment. Each header connects to branches inside containment that lead to the individual RCS legs. Each branch has a flow transmitter. These branch transmitters are not relied upon during performance of emergency procedures.
Only Surry has inside containment HHSI flow transmitters manufactured by Rosemount. These transmitters are safety related only for pressure boundary consideration. The inside containment Rosemount transmitters will continue to have enhanced calibration performed at each refueling outage. The zero drift values found at calibration will be used together with Rosemount published zero drift limit values to predict when the Rosemount drift limits would be exceeded. If the calculated time is less than the time to the next calibration, the transmitter will be declared inoperable.
For the HHSI flow transmitters outside containment we will either: 1) calibrate the transmitters quarterly using the enhanced calibration method, or 2) replace the transmitters, or 3) provide justification for a longer calibration period for those transmitters that have exceeded their psi-month limit.
North Anna has one charging system makeup flow transmitter that has not yet met its psi-month threshold. (The other one has been replaced with a transmitter with a serial number greater than 500000. The two at Surry have met their psi-month threshold.) This transmitter provides control and indication functions and has no redundant transmitter/channel with which to compare during plant operation. This transmitter cannot be easily removed from operation for frequent calibration due to its control function. We will continue monthly operational surveillance on this transmitter until it reaches its psi-month threshold.
- c. Replace, or monitor at least once every refueling cycle, but not exceeding 24 months, using an enhanced surveillance program until the transmitter reaches the appropriate psi-month threshold criterion recommended by Rosemount, any transmitters that have normal operating pressure greater than 500 psi and less than or equal to 1500 psi and that are installed in reactor protection trip systems, ESF actuation systems, or ATWS systems.
Page 3 of 8
Response
The transmitters at North Anna and Surry that meet this criterion are the steam generator narrow range level transmitters, and the main steam line flow and pressure transmitters. Enhanced calibration/testing of these transmitters will occur every refueling cycle, not exceeding 24 months.
Those that have met their threshold will be removed from the enhanced monitoring program in accordance with "e" below.
- d. Replace, or monitor at least once every refueling cycle, but not exceeding 24 months, using an enhanced surveillance monitoring program until the transmitter reaches the appropriate psi-month threshold criterion recommended by Rosemount, any transmitter used in safety related systems that have a normal operating pressure greater than 500 psi and less than or equal to 1500 psi, and that are not installed in reactor protection trip systems, ESF actuation systems, or ATWS systems.
Response
The transmitters at North Anna and Surry that meet this criterion are the safety injection accumulator pressure transmitters, steam to turbine driven auxiliary feedwater pump (TDAFWP) flow transmitters, and auxiliary feedwater (AFW) flow transmitters. Enhanced calibration/testing of those transmitters that have not met their psi-month threshold will occur every refueling cycle, not exceeding 24 months. Those that have met their threshold will be removed from the enhanced monitoring program in accordance with "e" below.
- e. At licensee discretion, exclude from the enhanced surveillance program any transmitters that have a normal operating pressure greater than 500 psi and less than or equal to 1500 psi that have reached the appropriate psi-month threshold criterion recommended by Rosemount (60,000 psi-months or 130,000 psi-months depending on the range code of the transmitter). A high degree of confidence should be maintained for detecting failure of these transmitters caused by a loss of fill- oil and a high degree of reliability should be maintained for the function consistent with its safety significance.
Response
Normal calibration/testing of these transmitters will occur every refueling cycle, not exceeding 24 months.
Page 4 of 8
f.
At licensee discretion, exclude from the enhanced surveillance program any transmitters that have a normal operating pressure less than or equal to 500 psi. A high degree of confidence should be maintained for detecting failure of these transmitters caused by a loss of fill-oil and a high degree of reliability should be maintained for the function consistent with its safety significance.
Response
Normal calibration/testing of these transmitters will continue every refueling cycle, not exceeding 24 months.
- 2. Evaluate the enhanced surveillance monitoring program to ensure that the program provides measurement data with an accuracy range consistent with that needed for comparison with manufacturer drift data criteria for determining degradation caused by a loss of fill-oil.
Response
The enhanced surveillance program in place at both North Anna and Surry Power Stations has two parts: 1) the transmitter's response testing and trending of calibration data subsequent to calibration, and 2) monthly monitoring of transmitter readings/data during unit operation.
The trending of calibration data occurs after calibration of a particular transmitter. The data sheets for a particular transmitter are submitted and the pertinent calibration data is entered into a personal computer database program, which calculates the zero shift that has occurred between calibrations.
This calculated shift is compared with the Rosemount-established limits to determine whether or not the transmitter should remain in service. This data has accuracy consistent with requirements for comparison with manufacturer drift criteria.
The monthly enhanced operational monitoring is performed as follows. The monthly monitoring system records the outputs of the various transmitters connected to the Emergency Response Facility (ERF) computer system on magnetic tape using a high-speed digital recording system normally used to capture plant transient data. These tapes are then read by a mainframe computer and imported into a personal computer database program. The program calculates the variation between redundant channels, calculates the acceptable variance based on Rosemount-established limits, and compares the values. Transmitters that are outside the acceptable variance are then identified for further evaluation.
Page 5 of 8
e
- The equipment used for the operational monitoring system has the required accuracy to allow application of the Rosemount drift data. We have been successful using this system in estimating time to failure based on drift data and time at pressure. The inputs to the system are the same as the inputs to the ERF computer, and are therefore calibrated to the requirements of that system.
These inputs are calibrated to +/-0.25%.
Page 6 of 8
' REPORTING REQUIREMENTS NRC Bulletin 90-01, Supplement 1 requires a response that:
- 1. Confirms that the actions in items 1 and 2 of Requested Actions will be performed.
Response
The requested actions will be performed. We have elected to remove certain transmitters from monthly enhanced surveillance. In one case, we propose to perform quarterly calibrations. Procedural changes will be required for transmitters where surveillance requirements have been changed. All transmitters, except those excluded by items 1e and 1f above, will continue to have enhanced surveillance performed when the transmitters are calibrated on a refueling frequency. We may subsequently choose to replace transmitters rather than continue the enhanced surveillance.
2a) Lists the specific actions that will be completed to meet the requirements of item 1 of Requested Actions, including justifications as appropriate.
Response
The specific items are as follows.
- 1. Continue to monitor monthly, with the enhanced operational monitoring system described earlier, those transmitters in category 1a that have redundant channels/signals that can be readily and accurately compared. These items will continue to be monitored at calibration, which does not exceed 24 months.
- 2. Remove from enhanced surveillance those transmitters operating at a pressure greater than 500 psi and less than 1500 psi that have exceeded their psi-month threshold. For category 1b HHSI flow transmitters outside containment, either: 1) do enhanced calibration on the transmitters quarterly, or 2) replace the transmitters, or 3) provide justification for a longer calibration period. Continue enhanced calibration of those transmitters in category 1c and 1d that have not met their threshold.
- 3. Remove from the enhanced surveillance program transmitters operating at a pressure less than 500 psi that have no safety function (i.e., are for indication). These will continue to be tested for response to step changes in pressure at calibration.
Page 7 of 8
2b)
Provides a schedule for completing the requirements of item 1 of Requested Actions.
Response
The requested actions have been completed, as discussed in our response to the requested actions. If we determine that a longer than quarterly calibration period for the outside containment HHSI flow transmitters is justified, we will provide the justification to the NRC.
2c) Provides a statement confirming that items 1 and 2 have been completed.
Response
The requested actions have been completed, as discussed in our response to the requested actions.
- 3. Provides a statement identifying those actions requested by the NRC that will not be completed.
Response
Not applicable, all requirements are met.
Page 8 of 8