MONTHYEARML18152B3591999-08-23023 August 1999 Revised Tech Specs Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in UFSAR & Includes Ref to Applicable UFSAR Section ML18152B6591999-04-28028 April 1999 Proposed Tech Specs Re Refueling Water Chemical Addition Tank Min Vol ML18152A2131999-02-16016 February 1999 Proposed Tech Specs,Consolidating AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B5451999-02-16016 February 1999 Proposed Tech Specs Pages,Revising Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18152B6151998-11-0404 November 1998 Proposed Tech Specs 4.6.A.1.b,re EDG Start & Load Time Testing Requirements & TS 3.16 Bases Re EDG Ratings ML18153A3311998-09-24024 September 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML18153A3351998-09-24024 September 1998 Proposed Tech Specs Pages Affected by Suppl to 960912 Resubmittal of Change Request Re Relocation of Fire Protection Requirements from TS to UFSAR ML18152B7551998-06-19019 June 1998 Proposed Tech Specs Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML18153A3481997-12-18018 December 1997 Proposed Tech Specs Clarifying Terminology Used for Describing Equipment Surveillances Conducted on Refueling Interval Frequency.Clarification Consistent W/Info Contained in Rev 1 to NUREG-1431 ML18153A1761997-11-0505 November 1997 Proposed Tech Specs Re Temporary Svc Water Supply Line to Component Cooling Heat Exchangers ML18153A3941997-11-0505 November 1997 Proposed Tech Specs Re Change for Increased Enrichment of Reload Fuel ML18153A5231997-04-24024 April 1997 Proposed Corrected Tech Specs Pages 6.1-3 & 6.1-8 Re Relocation of Fire Protection TS to Updated Final Safety Analysis Rept ML18153A5031997-03-18018 March 1997 Proposed Tech Specs Rev to Section 4.15 for Surry Power Station to Include Pp Inadvertently Omitted from 970203 Request for Amend to Licenses DPR-32 & DPR-37 ML18153A4921997-02-0303 February 1997 Proposed Tech Specs Re Deletion of Specific ASME Section XI Code Ref ML18153A6351996-11-26026 November 1996 Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 ML18153A0671996-09-12012 September 1996 Proposed Tech Specs Re Relocation of Fire Protection Requirements ML18153A6901996-04-15015 April 1996 Proposed Tech Specs,Clarifying Applicability of Quadrant Power Tilt Ration Requirements ML18153A5391996-03-21021 March 1996 Proposed Tech Specs Re Charcoal Filter Testing Clarification ML18153A5271996-03-14014 March 1996 Proposed Tech Specs,Permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML18153A5801996-01-30030 January 1996 Proposed Tech Specs Re Reactor Coolant Sys Liquid Sampling ML18153A6761995-11-20020 November 1995 Proposed Tech Specs Re App J Option B,performance-based Containment Leakage Rate Testing ML18153A7141995-07-20020 July 1995 Proposed Tech Specs Establishing New Setpoint Limit for SG high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6991995-07-14014 July 1995 Proposed Tech Specs,Providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing SI Accumulators in Lieu of Accumulator Isolation ML18153A8371995-06-0808 June 1995 Proposed Tech Specs,Incorporating Revised Pressure/Temp Limits & Associated Ltops Setpoint That Will Be Valid to end-of-license ML18153B2301995-02-14014 February 1995 Proposed Tech Specs Re App J Testing Requirements ML18153B2131995-01-24024 January 1995 Proposed Tech Specs,Modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1621994-11-29029 November 1994 Proposed Tech Specs Implementing Zirlo Fuel Cladding ML18153B1581994-11-22022 November 1994 Proposed Tech Specs,Deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1501994-11-10010 November 1994 Proposed Tech Specs Re Changes to TS Will Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0941994-10-11011 October 1994 Proposed Tech Specs Surveillance Frequencies for Hydrogen Analyzers ML18152A5061994-09-0606 September 1994 Proposed Tech Specs Re Mgt Safety Review Committee & Station Nuclear Safety & Operating Committee Responsibilities ML18152A1191994-08-30030 August 1994 Proposed Tech Specs to Accomodate Core Uprating ML18153B0061994-07-14014 July 1994 Proposed Tech Specs Changes Will Eliminate Remaining References to cycle-specific Parameters in Surry TS ML18152A1821994-06-0909 June 1994 Proposed TS Re Chemical & Vol Control Sys & Safety Injection Sys ML20065P6111994-04-19019 April 1994 Proposed Tech Specs,Modifying Control Rod Movement Surveillance Frequency ML18153A8821994-02-25025 February 1994 Proposed Tech Specs Modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys ML18153B4321993-12-27027 December 1993 Proposed Tech Specs Reflecting Revised Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML18153B4081993-12-10010 December 1993 Proposed Tech Specs,Establishing Upper Limit on Allowable COLR Mtc Values ML18153B4021993-12-10010 December 1993 Proposed Tech Specs,Modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 & NUREG-1431 ML18153B4051993-12-10010 December 1993 Proposed Tech Specs,Updating Augmented Insp Program for Sensitized Stainless Steel by Incorporating Newer Code Requirements,While Maintaining Augmented Insp Philosophy ML18153B3751993-11-15015 November 1993 Proposed Tech Specs Implementing Revised 10CFR20,revising Frequency Radiological Release Repts from Semiannual to Annual & Clarifying Site Maps ML18153B3501993-10-19019 October 1993 Proposed Tech Specs for RSHX Svc Water Outlet Radiation Monitors ML18153B3321993-09-29029 September 1993 Proposed Tech Specs Modifying Required Insp Frequency of Low Pressure Turbine Blades to Permit Blade Insp to Be Performed Concurrent W/Disk & Hub Insp ML18152A0481993-07-20020 July 1993 Proposed Tech Specs Deleting Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3921993-07-16016 July 1993 Proposed Tech Specs for Operation W/Three Degree Increase in Svc Water Temp Limit for Containment Air Partial Pressures of 9.1,9.2 & 9.35 Psia ML18152A0461993-07-16016 July 1993 Proposed Tech Specs Implementing Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from semi-annual to Annual,& Clarify Site Maps ML18152A4511993-07-0202 July 1993 Proposed Tech Specs to Include COLR Which Presents reload- Specific Limits for Key Core Operating Parameters ML18153D3811993-07-0202 July 1993 Proposed TS Table 4.2-1 Re Miscellaneous Insps & Sensitized Stainless Steel Exams ML18153D3331993-05-0606 May 1993 Proposed Tech Specs Supporting Operation of Unit 2 w/100 Psi Reduction in RCS Nominal Operating Pressure Through End of Operating Cycle 12 1999-08-23
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18152B3591999-08-23023 August 1999 Revised Tech Specs Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in UFSAR & Includes Ref to Applicable UFSAR Section ML18151A6641999-08-0606 August 1999 Rev 0 to Surry Unit 2 Cycle 16 Startup Physics Tests Rept. ML18152B6591999-04-28028 April 1999 Proposed Tech Specs Re Refueling Water Chemical Addition Tank Min Vol ML18152A2131999-02-16016 February 1999 Proposed Tech Specs,Consolidating AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B5451999-02-16016 February 1999 Proposed Tech Specs Pages,Revising Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18151A5511999-02-10010 February 1999 to NE-1187, Surry Unit 1,Cycle 16 Startup Physics Tests Rept. ML18152B6151998-11-0404 November 1998 Proposed Tech Specs 4.6.A.1.b,re EDG Start & Load Time Testing Requirements & TS 3.16 Bases Re EDG Ratings ML18153A3351998-09-24024 September 1998 Proposed Tech Specs Pages Affected by Suppl to 960912 Resubmittal of Change Request Re Relocation of Fire Protection Requirements from TS to UFSAR ML18153A3311998-09-24024 September 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML18152B7551998-06-19019 June 1998 Proposed Tech Specs Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML20249B9911998-05-0606 May 1998 Analysis of Capsule X Virginia Power Surry Unit 1 Reactor Vessel Matl Surveillance Program. W/Evaluation of Surry Unit 1 Surveillance Capsule X Results & Response to NRC RAI Re GL 92-01,rev 1,suppl 1 ML18151A1931998-05-0404 May 1998 Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20199B0711998-01-0505 January 1998 Rev 0 to NE-1148, Surry Unit 2,Cycle 15 Startup Physics Test Rept ML18153A3481997-12-18018 December 1997 Proposed Tech Specs Clarifying Terminology Used for Describing Equipment Surveillances Conducted on Refueling Interval Frequency.Clarification Consistent W/Info Contained in Rev 1 to NUREG-1431 ML18150A4661997-12-16016 December 1997 ISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2 ML18153A3941997-11-0505 November 1997 Proposed Tech Specs Re Change for Increased Enrichment of Reload Fuel ML18153A1761997-11-0505 November 1997 Proposed Tech Specs Re Temporary Svc Water Supply Line to Component Cooling Heat Exchangers ML18150A4641997-10-27027 October 1997 Risk-Informed ISI (RI-ISI) Pilot Program Submittal. ML18151A3911997-10-16016 October 1997 Rev 8 to VPAP-2103, Odcm. ML18151A7231997-08-0707 August 1997 Rev 1 to Nuclear Safety Analysis Manual Part Iv,Chapter a Probabilistic Safety Assessment Products. ML20210J5031997-07-31031 July 1997 Rev 0 to NE-1132, Surry Unit 1,Cycle 15 Startup Physics Tests Rept ML18150A4441997-06-0909 June 1997 Vol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003. ML18153A5231997-04-24024 April 1997 Proposed Corrected Tech Specs Pages 6.1-3 & 6.1-8 Re Relocation of Fire Protection TS to Updated Final Safety Analysis Rept ML18153A5031997-03-18018 March 1997 Proposed Tech Specs Rev to Section 4.15 for Surry Power Station to Include Pp Inadvertently Omitted from 970203 Request for Amend to Licenses DPR-32 & DPR-37 ML18153A4921997-02-0303 February 1997 Proposed Tech Specs Re Deletion of Specific ASME Section XI Code Ref ML18153A6351996-11-26026 November 1996 Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 ML18153A0671996-09-12012 September 1996 Proposed Tech Specs Re Relocation of Fire Protection Requirements ML18151A9761996-08-13013 August 1996 Cycle 14 Startup Physics Test Rept. W/960830 Ltr ML20134J9861996-07-30030 July 1996 /Unit 2 Fuel Assembly Insp Program ML18152A4701996-06-13013 June 1996 Cycle 13 Control Rod Performance Test Results. ML18153A6901996-04-15015 April 1996 Proposed Tech Specs,Clarifying Applicability of Quadrant Power Tilt Ration Requirements ML18153A5391996-03-21021 March 1996 Proposed Tech Specs Re Charcoal Filter Testing Clarification ML18153A5271996-03-14014 March 1996 Proposed Tech Specs,Permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML18153A5801996-01-30030 January 1996 Proposed Tech Specs Re Reactor Coolant Sys Liquid Sampling ML18152A0571995-12-20020 December 1995 Startup Physics Test Rept,Surry Unit 1,Cycle 14. W/960111 Ltr ML18153A6761995-11-20020 November 1995 Proposed Tech Specs Re App J Option B,performance-based Containment Leakage Rate Testing ML18151A6421995-08-0101 August 1995 Change 3 to Rev 0 to Third Interval IST Program ML18153A7141995-07-20020 July 1995 Proposed Tech Specs Establishing New Setpoint Limit for SG high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6991995-07-14014 July 1995 Proposed Tech Specs,Providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing SI Accumulators in Lieu of Accumulator Isolation ML18153A8371995-06-0808 June 1995 Proposed Tech Specs,Incorporating Revised Pressure/Temp Limits & Associated Ltops Setpoint That Will Be Valid to end-of-license ML20083C9951995-05-0808 May 1995 Rev 0 to Surry Unit 2,Cycle 13 Startup Physics Tests Rept ML18153B2301995-02-14014 February 1995 Proposed Tech Specs Re App J Testing Requirements ML18153B2131995-01-24024 January 1995 Proposed Tech Specs,Modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1621994-11-29029 November 1994 Proposed Tech Specs Implementing Zirlo Fuel Cladding ML18153B1581994-11-22022 November 1994 Proposed Tech Specs,Deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1501994-11-10010 November 1994 Proposed Tech Specs Re Changes to TS Will Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0941994-10-11011 October 1994 Proposed Tech Specs Surveillance Frequencies for Hydrogen Analyzers ML18152A5061994-09-0606 September 1994 Proposed Tech Specs Re Mgt Safety Review Committee & Station Nuclear Safety & Operating Committee Responsibilities ML18152A1191994-08-30030 August 1994 Proposed Tech Specs to Accomodate Core Uprating 1999-08-06
[Table view] |
Text
-*' -
ATTACHMENT 1 SURRY POWER STATION PROPOSED TECHNICAL SPECIFICATION CHANGE 10 CFR 50 APPENDIX J TEST PRESSURES 9011200189 901114 '\
PDR ADOCK 05000280 I P PDC I
TS 3.8-3
- 1
- The shutdown margins are selected based on the type of activities that are being carried out. The 5 percent ~k/k shutdown margin during refueling precludes criticality under any circumstances, even though fuel and control rod assemblies are being moved.
The allowable value for the containment air partial pressure is presented in TS Figure 3.8-1 for service water temperatures from 25 to 92°F. The allowable value varies as shown in TS Figure 3.8-1 for a given containment average temperature. The RWST water shall have a maximum temperature of 45°F.
The horizontal limit lines in TS Figure 3.8-1 are based on LOCA peak calculated pressure criteria, and the sloped line is based on LOCA subatmospheric peak pressure criteria.
The curve shall be interpreted as follows:
The horizontal limit line designates the allowable air partial pressure value for the given average containment temperature. The horizontal limit line applies for service water temperatures from 25°F to the sloped line intersection value (maximum service water temperature).
From TS Figure 3.8-1, if the containment average temperature is 112°F and the service water temperature is less than or equal to 83°F, the allowable air partial pressure value shall be less than or equal to 9.65 psia. If the average containment temperature is 116°F and the service water temperature is less than or equal to 88°F, the allowable air partial pressure value shall be less than or equal to 9.35 psia. These horizontal limit lines are a result of the higher allowable initial containment average temperatures and the analysis of the pump suction break.
.._ I '
- b. The leakage rate test will be performed at a pressure of at least 45.0 psig.
- c. The measured leakage rate Lam shall not exceed 75% of the design basis accident leakage rate (La) 0.1 weight percent per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at Pressure Pa.
- 2. Type B and C tests will be performed at a pressure of at least 45.0 psig in accordance with the provisions of Appendix J, Section 111.B.
and C. Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after use of the personnel airlock, the seals will be tested to at least 45 psig to verify that they are properly sealed. The emergency escape airlock seals will be tested at 1O psig within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of use.
C. Acceptance Criteria Type A, B, and C tests will be considered to be satisfactory if the acceptance criteria delineated in Appendix J, Sections III.A.5(b) 111.B.3.,
and 111.C.3 are met.
D. Retest Schedule The retest schedules for Type A, B, and C tests will be in accordance with Section 111.D of Appendix J.
E. Inspection and Reporting of Tests Inspection and reporting of tests will be in accordance with Section V of Appendix J.
The leak tightness testing of all liner welds was performed during construction by welding a structural steel test channel over each weld seam and performing soap bubble and halogen leak tests.
, r ........... / 1
- TS 4.4-3 The containment is designed for a maximum pressure of 45 psig. The containment is maintained at a subatmospheric air partial pressure which varies between 9 psia and 11 psia depending upon the cooldown capability of the Engineered Safeguards and will not rise above 45 psig for any postulated loss-of-coolant accident.
The initial test pressure for the Type A test is 47.0 psig to allow for containment expansion and equalization. A review was performed to determine the effects of pressurizing containment above its design pressure of 45.0 psig which is also (Pa), This review was based on the original containment test at 52 psig. During that test, the calculated stresses were found to be well within the allowable yield strength of the structural reinforcing bars, therefore performance of the Type A test at 47 psig will have no detrimental effect on the containment structure.
All loss-of-coolant accident evaluations have been based on an integrated containment leakage rate not to exceed 0.1 % of containment volume per 24 hr.
The above specification satisfies the conditions of 10 CFR 50.54(0) which stated that primary reactor containments shall meet the containment leakage test requirements set forth in Appendix J.
The limitations on closure and leak rate for the containment airlocks are required to meet the restrictions on containment integrity and containment leak rate.
Surveillance testing of the airlock seals provides assurance that the overall airlock leakage will not become excessive due to seal damage during the intervals between airlock leakage tests. Because the test pressure is applied under the the
- emergency escape airlock door seals (between the seating surfaces) only 1O psig is used. The 1O psig test is deemed by the manufacturer to be a comparable test.
References FSAR Section 5.4 Design Evaluation of Containment Tests and Inspections of Containment FSAR Section 7.5.1 Design Bases of Engineered Safeguards Instrumentation FSAR Section 14.5 Loss of Coolant Accident 10 CFR 50 Appendix J "Primary Reactor Containment Leakage Testing for Water Cooled Power Reactors"
ATTACHMENT 2 SURRY POWER STATION SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION
...' l.,
DISCUSSION The proposed Technical Specification change to Section 4.4.B will require Type A, B, and C testing be performed at 45 psig (containment design pressure) rather than 39.2 psig (previous calculated peak pressure). This change is necessary to ensure that the containment is tested at a pressure equal to or greater than calculated peak accident pressure. The latest reanalysis, performed to support the reevaluation of the service water inventory calculations (canal inventory), indicates that accident pressure will peak at 44.98 psig. This is the worst case, assuming normal safeguards and minimum containment spray. The actual Type A, B, and C testing will be performed at greater than 45 psig (i.e., 47 psig). An evaluation was performed to determine the effects of pressurizing the containment above the design pressure. The evaluation was based on the original containment pressure test at 52 psig. During the test, the calculated stresses were found to be well within the allowable yield strengths of the structural reinforcing bars. Therefore, performance of Type A testing at 47 psig will have no detrimental effect on the containment structure.
This proposed Technical Specification change will also specify the pressure at which the emergency escape airlock door seals are tested 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after use, in accordance with 1o CFR 50, Appendix J,Section III.D.2(b)(iii). Appendix J permits alternate testing methods when it is impractical to test at design pressure, but requires modification of the Technical Specifications for consistency. Currently, the Technical Specification (4.4.B.2) requires Type B tests be performed at design accident pressure. The required 6 month surveillance is performed by pressurizing the escape hatch between the doors at design pressure. However, the test that is required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each use tests only the seals. The manufacturer has recommended a 1O psi differential pressure test applied under the seal (between the seating surfaces) as a comparable alternative.
For the above changes, the basis is being updated to reflect the new test pressures.
In addition to the above changes, a typographical error is also being corrected. In the basis of Section 3.8, the operational range of service water temperature is being corrected to be consistent with Figure 3.8-1. The 92°F, on Figure 3.8-1, is consistent with the maximum service water temperature used in the safety analysis.
A ,*
SIGNIFICANT HAZARDS CONSIDERATION Virginia Electric and Power Company has reviewed the proposed changes against the criteria of 10 CFR 50.92 and has concluded that the changes as proposed do not pose a significant hazards consideration. Specifically, operation of the Surry Power Station in accordance with the proposed changes will not:
- 1. Involve a significant increase in the probability of occurrence or consequences of any accident previously evaluated. The reanalysis of containment response was performed as part of an evaluation to resolve a concern identified with the canal inventory. The reanalysis results remain within the design basis envelope. In addition, plant design and operations have not been altered. Therefore, the probability of occurrence or consequences of any accident have not increased.
- 2. Create the possibility of a new or different type of accident from any accident previously evaluated. Plant design and operations have not been changed. The changes in accident analysis input do not affect system design or operation. Therefore no new or different kind of accident is created.
- 3. Involve a significant reduction in a margin of safety. No physical plant modifications, or changes in plant operations are being made. Although an accident analysis assumption is being changed the results of the analysis remain with the design envelope (45 psig containment design pressure) and the safety margin is unchanged.