Notice of Violation from Insp on 900304-31.Violation Noted: Periodic Test of Main Station Battery 2B Cell Voltage Check Not Followed & Discrepancy Not Noted on Test Critique Sheet as Required by Step 6.2.1
ML18153C212
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/27/1990
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18152A310 List:
References
50-280-90-14, 50-281-90-14, NUDOCS 9005080043
Download: ML18153C212 (2)


Text

ENCLOSURE 1 NOTICE OF VIOLATION Virginia Electric and Power Company Surry Units 1 and 2 Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 During the Nuclear Regulatory Commission (NRC) inspection conducted between the period of March 4-31, 1990, a violation of NRC requirements was identified.

In accordance with the 11Genera 1 Statement of Po 1 icy and Procedure for NRC Enforcement Actions, 11 10 CFR Part 2, Appendix C (1989), the violation is listed below:

Technical Specification 6.4.D requires, in part, that detailed written procedures with appropriate checkoff lists and instructions shall be followed for testing of systems and components involving nuclear safety of the station.

1.

Contrary to the above, the procedural requirements of Periodic Test 2-PT-23.88, Main Station Battery 28 Cell Voltage Check, dated June 26, 1989, performed on December 12, 1989, were not followed in that station battery 28 was not placed on a 135 hour0.00156 days <br />0.0375 hours <br />2.232143e-4 weeks <br />5.13675e-5 months <br /> equalizing charge and the discrepancy was not noted on the test critique sheet as required by Step 6. 2.1.

2.

Contrary to the above, the procedural requirements of Periodic Test PT 25.3C, Emergency Service Water Pump (1-SW-P-lC), dated October lOi 1989, performed on March 20, 1990, were not followed in that electrical readings were not taken in the location specified in Step 5.10.

This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Virginia Electric and Power Company is hereby required to submit a written statement or exp 1 ana ti on to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, within 30 days of the date of this Notice.

This reply should be clearly marked as a 11Reply to a_ Notice of Violation 11 and should include:

(1) admission or denial of the violattbn, (2) the reason for the violation if admitted, (3) the correc-tive steps w~ich ha~e been taken and the results achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending the response time.

If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked; or 9005080043 900427 PDR ADOCK 05000280 Q

PDC

Virginia Electric and Power Company Surry Units 1 and 2 2

Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 why such other action as may be proper should not be taken.

Under the authority of Section 182 of the Act, 42 U.S.C. 2232, this response shall be submitted under oath or affirmation.

Dated at Atlanta, Georgia this 27th day of April 1990 F:TH-E ~ZTORY COMMISSION uis A. Reyes,

  • ctor Division of a or Projects