Corrected Signature Page to Insp Repts 50-280/89-38 & 50-281/89-38 on 891126-1231.Major Areas Inspected:Plant Operations,Maint,Surveillance,Ler Review & Followup on Inspector Identified Items
ML18153C104
Person / Time
Site: Surry  Dominion icon.png
Issue date: 01/26/1990
From: Fredrickson P, Holland W, Larry Nicholson, York J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18153C103 List:
References
50-280-89-38, 50-281-89-38, NUDOCS 9002130323
Download: ML18153C104 (1)


See also: IR 05000280/1989038

Text

,.

Report Nos.:

ENCLOSURE

UNITED STATES

NUCLEAR REGULATORY COMMISSION

. REGION 11

101 MARIETTA STREET, N.W.

ATLANTA, GEORGIA 30323

50-280/89-38. and 50-281/89-38

Licensee:

Virginia Electric and Power Company

5000 Dominion Boulevard

Glen Allen, VA

23060

Docket Nos.:

50-280 and 50-281

License Nos.:

DPR-32 and DPR-37

.

'*

Facility Name:

Surry 1 and 2

Inspection Conducted:

November 26 - De~ember 31, 1989 *

Inspectors:

Approved by:

Scope:

y:2', -~=--= F"cK_

W. E. Holla~1orResident Inspector

~-d~~-

~~yZ

J. W. York, Resident fnspector

yg, ~~--- /'<Jf

L. E. Nicholson, Resientlnspector

1/1 / __ ~Ja,le *.

P. E. Fredrickson, Section Chief

Division of Reactor Projects

SUMMARY

/-:?'f-C.,c,

Date Signed

I .:.. .:=! <-t.:... 6'o

Date Signed

1-;;,_Lf-9c

Date Signed

/**..2.t:. -?6

Date Signed

This routine resident inspection was conducted on site in the areas of plant

operations, plant maintenance, plant surveillance, licensee event. report

review, and followup on inspector identified items.

Certain tours were conducted on backshifts or weekends.

Backshift or weekend

tours were conducted on November 26, December 3, 10, 22, and 23.

Results:

During this inspection period, no violations or deviations were identified. A

limited review of implementation of Revision lA of. the Emergency Operating

Procedures was conducted.

This review concluded that implementation of the

revision was being accomplished in an adequate manner.

However, a number of

deficiencies regarding proper identification and/or labeling of plant

components were noted.

The licensee was aware of a general

labeling

degradation in the plant and is taking corrective actions in this area

(paragraph 3.h). Several programmatic areas associated with heat trace

circuitry and cleanliness control were reviewed during closeout of past

enforcement issues. Progress towards implementation of corrective actions for

these problems was determined .to be satisfactory (paragraph 7). Also, during

9002130323 900129

PDR

ADOCK 05000280