Text
,.
Report Nos.:
ENCLOSURE
UNITED STATES
NUCLEAR REGULATORY COMMISSION
. REGION 11
101 MARIETTA STREET, N.W.
ATLANTA, GEORGIA 30323
50-280/89-38. and 50-281/89-38
Licensee:
Virginia Electric and Power Company
5000 Dominion Boulevard
Glen Allen, VA
23060
Docket Nos.:
50-280 and 50-281
License Nos.:
.
'*
Facility Name:
Surry 1 and 2
Inspection Conducted:
November 26 - De~ember 31, 1989 *
Inspectors:
Approved by:
Scope:
y:2', -~=--= F"cK_
W. E. Holla~1orResident Inspector
~-d~~-
~~yZ
J. W. York, Resident fnspector
yg, ~~--- /'<Jf
L. E. Nicholson, Resientlnspector
1/1 / __ ~Ja,le *.
P. E. Fredrickson, Section Chief
Division of Reactor Projects
SUMMARY
/-:?'f-C.,c,
Date Signed
I .:.. .:=! <-t.:... 6'o
Date Signed
1-;;,_Lf-9c
Date Signed
/**..2.t:. -?6
Date Signed
This routine resident inspection was conducted on site in the areas of plant
operations, plant maintenance, plant surveillance, licensee event. report
review, and followup on inspector identified items.
Certain tours were conducted on backshifts or weekends.
Backshift or weekend
tours were conducted on November 26, December 3, 10, 22, and 23.
Results:
During this inspection period, no violations or deviations were identified. A
limited review of implementation of Revision lA of. the Emergency Operating
Procedures was conducted.
This review concluded that implementation of the
revision was being accomplished in an adequate manner.
However, a number of
deficiencies regarding proper identification and/or labeling of plant
components were noted.
The licensee was aware of a general
labeling
degradation in the plant and is taking corrective actions in this area
(paragraph 3.h). Several programmatic areas associated with heat trace
circuitry and cleanliness control were reviewed during closeout of past
enforcement issues. Progress towards implementation of corrective actions for
these problems was determined .to be satisfactory (paragraph 7). Also, during
9002130323 900129