Corrected Operating Data Rept for Oct 1989 for Surry Unit 2
ML18153C071
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/31/1989
From: Warren L
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18152A486 List:
References
NUDOCS 9001230021
Download: ML18153C071 (2)


Text

OPERATING DATA REPORT CORRECTED COPY*

01/05/90 DOCKET NO.:

50-281 DATE: -No_v_e-mb~e-r--=-7 -,....,,.1.,,..98"'"'9--

OPERATING STATUS

1. Unit Name:

Surry Unit 2

2. Reporting Period: Oct. 1 - Oct. 31, 1989
3. Licensed Thermal Power (MWt):2441
4. Nameplate Rating (Gross MWe):847.5 COMPLETED BY:

Linda A. Warren TELEPHONE:

(804)357-3184 x355 NOTES

5. Design Electrical Rating (N_et MWe):

788

6. Maximum Dependable Capacity (Gross MWe):

820

7. Maximum Dependable Capacity (Net MWe):

781

8. I_f. Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:. --'----------------------
9. Power Level To Which Restricted, If Any (Net MWe): -----------
10. Reason For Restrictions, If Any: ------------------

THIS MONTH YTD CUMULATIVE

11. Hours In Reporting Period 745.0 7296. 0 144672. 0
12. Number of Hours Reactor Was Critical 275.3 602.4 90296.7 *
13. Reactor Reserve Shutdown Hours 0

0 328.1

14. Hours Generator On-Line 270.5 459.7 88752.7 *
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 550555.5 738311.4
  • 207478747.5 17.. Gross Electrical Energy Generated (MWH) 180425.0 227150.0 67363394.0
18. Net Electrical Energy Generated (MWH) 170864.0 211695. 0 63859073.0
19. Unit Service Factor 36.3%

6.3%

61.3%

20. Unit Available Factor 36.3%

6.3%

61.3%

21. Unit Capacity Factor (Using MDC Net) 29.4%

3.7%

56.6%

22. Unit Capacity Factor (Using DER Net) 29.1%

3.7%

56.0%

23. Unit Forced Rate 63.7%
  • 55.5%
  • 15.4%*
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End of Report Period Estimated Date of Startup: 11/23/89
26. Unit In Test Status (Prior to Commercial Operation.):

FORECAST ACHIEVED

-- ~*--*1 CJ

    • 1*.11*.111.:-'._,

90012:3(.1()..::..

F*D~

AD0Ck 05000280 R p PDC i INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

NO.

DATE

-*uNIT SHUTDOWN AND POWER REDUCTION REPORT MONTH:

October 1989 METHOD OF LICENSEE CORRECTED COPY (12/11/89)~

DOCKET NO.:

50-281 UNIT NAME: __,s=-u-r-ry~Un_,i,..,.t--,2=----

DATE:

November 7, 1989 COMPLETED BY:

L. A Warren TELEPHONE:

804-357-3184 x355 DURATION SHUTTING EVENT SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENT TYPE(!)

(HOURS)

REASON(2) DOWN REACTOR(3) REPORT#

CODE(4)

CODE(5) 10/01/89

  • F 4.7 B

4 10/02/89 F 0

A 4

  • C-10-3 10/12/89 F 469.8 A

1 (1)

F:

Forced S: Scheduled (2)

REASON:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H -*Other (Explain)

N/A TA TB N/A SJ

- MO,P 89-13 (3)

METHOD:*

1 - Manual AB 2 - Manual Scram.

3 - Automatic Scram.

4 - Other (Explain)

RV Unit was taken off line for turbine balancing; reactor remained critical.

Ramped down to remove 2-FW-P-18 from service for alignment.

2-RC-SV-25518 leaking by seat. Placed unit in Cold Shutdown sent three safety valves out for recalibration *

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)

File (NUREG 0161)

(5)

Exhibit 1 - Same Source