OPERATING DATA REPORT CORRECTED COPY*
01/05/90 DOCKET NO.:
50-281 DATE: -No_v_e-mb~e-r--=-7 -,....,,.1.,,..98"'"'9--
OPERATING STATUS
- 1. Unit Name:
Surry Unit 2
- 2. Reporting Period: Oct. 1 - Oct. 31, 1989
- 3. Licensed Thermal Power (MWt):2441
- 4. Nameplate Rating (Gross MWe):847.5 COMPLETED BY:
Linda A. Warren TELEPHONE:
(804)357-3184 x355 NOTES
- 5. Design Electrical Rating (N_et MWe):
788
- 6. Maximum Dependable Capacity (Gross MWe):
820
- 7. Maximum Dependable Capacity (Net MWe):
781
- 8. I_f. Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:. --'----------------------
- 9. Power Level To Which Restricted, If Any (Net MWe): -----------
- 10. Reason For Restrictions, If Any: ------------------
THIS MONTH YTD CUMULATIVE
- 11. Hours In Reporting Period 745.0 7296. 0 144672. 0
- 12. Number of Hours Reactor Was Critical 275.3 602.4 90296.7 *
- 13. Reactor Reserve Shutdown Hours 0
0 328.1
- 14. Hours Generator On-Line 270.5 459.7 88752.7 *
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 550555.5 738311.4
- 207478747.5 17.. Gross Electrical Energy Generated (MWH) 180425.0 227150.0 67363394.0
- 18. Net Electrical Energy Generated (MWH) 170864.0 211695. 0 63859073.0
- 19. Unit Service Factor 36.3%
6.3%
61.3%
- 20. Unit Available Factor 36.3%
6.3%
61.3%
- 21. Unit Capacity Factor (Using MDC Net) 29.4%
3.7%
56.6%
- 22. Unit Capacity Factor (Using DER Net) 29.1%
3.7%
56.0%
- 23. Unit Forced Rate 63.7%
- 55.5%
- 15.4%*
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down at End of Report Period Estimated Date of Startup: 11/23/89
- 26. Unit In Test Status (Prior to Commercial Operation.):
FORECAST ACHIEVED
-- ~*--*1 CJ
- 1*.11*.111.:-'._,
90012:3(.1()..::..
F*D~
AD0Ck 05000280 R p PDC i INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
NO.
DATE
-*uNIT SHUTDOWN AND POWER REDUCTION REPORT MONTH:
October 1989 METHOD OF LICENSEE CORRECTED COPY (12/11/89)~
DOCKET NO.:
50-281 UNIT NAME: __,s=-u-r-ry~Un_,i,..,.t--,2=----
DATE:
November 7, 1989 COMPLETED BY:
L. A Warren TELEPHONE:
804-357-3184 x355 DURATION SHUTTING EVENT SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENT TYPE(!)
(HOURS)
REASON(2) DOWN REACTOR(3) REPORT#
CODE(4)
CODE(5) 10/01/89
- F 4.7 B
4 10/02/89 F 0
A 4
- C-10-3 10/12/89 F 469.8 A
1 (1)
F:
Forced S: Scheduled (2)
REASON:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H -*Other (Explain)
N/A TA TB N/A SJ
- MO,P 89-13 (3)
METHOD:*
1 - Manual AB 2 - Manual Scram.
3 - Automatic Scram.
4 - Other (Explain)
RV Unit was taken off line for turbine balancing; reactor remained critical.
Ramped down to remove 2-FW-P-18 from service for alignment.
2-RC-SV-25518 leaking by seat. Placed unit in Cold Shutdown sent three safety valves out for recalibration *
(4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)
File (NUREG 0161)
(5)
Exhibit 1 - Same Source