ML18153C072
| ML18153C072 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 11/30/1989 |
| From: | Warren L VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML18152A486 | List: |
| References | |
| NUDOCS 9001230022 | |
| Download: ML18153C072 (1) | |
Text
r**
c,+*
/'
OPERATING DATA REPORT CORRECTED COPY*
01/05/90 DOCKET NO.:
50-281 DATE: -1"""'2,....,./0,..,,5,.....,./8=-:9,-------
COMPL ETED BY:
L.A. Warren TELEPHONE: ---,-,(8"""0-:-4T-::)3=5=-7_--=3=1=-84-=--x=35"""5,----
OPERATING STATUS NOTES
- 1. Unit Name:
Surry Unit 2
- 2. Reporting Period: NOV 01-30, 1989
- 3. Licensed Thermal Power (MWt):2441
- 4. Nameplate Rating (Gross MWe):847.5
- 5. Design Electrical Rating (Net MWe):
788
- 6. Maximum Dependable Capacity (Gross MWe):
820
- 7. Maximum Dependable Capacity (Net MWe):
781
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: -----------------------
- 9. Power Level To Which Restricted, If Any (Net MWe): -----------
- 10. Reason For Restrictions, If Any: -------------------
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
- 24.
THIS MONTH YTD CUMULATIVE Hours In Reporting Period 720.0 8016.0 145392.0 Number of Hours Reactor Was Critical 157.9 760.3 90454.6 Reactor Reserve Shutdown Hours O
O 328.1 Hours Generator On-Line
-~1-=-52=-.-=2,-
=5=11=-.-=9,.....
88904.9 Unit Reserve Shutdown Hours O
O 0
Gross Thermal Energy Generated (MWH)
~34~1~9~96=-._,,3_
-=-10~8~0'""""3=07,,,..._-=7,_* 207820743.8 Gross Electrical Energy Generated (MWH) 114585.0 341735.0 67477979.0 Net Electrical Energy Generated (MWH) 108802.0 320497.0 63967875.0 Unit Service Factor 21.1%
7.6%
61.1%
Unit Available Factor 21.1%
=7=-_-=5=%
61.1%
Unit Capacity Factor (Using MDC Net) 19.3%
5.1%
56.5%
Unit Capacity Factor (Using DER Net) 19.2% ---5=-,-=1-=%
55.8%
Unit Forced Outage Rate 78.9% ---65=-.-1~%*
15.8%
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down at End of Report Period Estimated Date of Startup:_---.-=-,-,.-,:-;-:-.=---
- 26. Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED 9001230022 900115 PDR ADOCK O~OOO?RO F:
- *- -.. F'Dt:: -
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l