Docket Nos. 50-280, 50-281
License Nos. DRP-32, DRP-37
Virginia Electric and Power Company
ATTN: Mr. W. L. Stewart
SEP 2 9 1993
Senior Vice President - Nuclear
5000 Dominion Boulevard
Glen Allen, VA
23060
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-280/93-22 AND 50-281/93-22
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Mr. M. Branch of this office on August 9, 1993, through September 4, 1993.
The inspection included a review of activities authorized for your Surry
facility. At the conclusion of the inspection, the findings were discussed
with those members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation.
The violation regarding inadequate investigation and evaluation of
suspected Reactor Coolant System (RCS) leakage is of concern because it
resulted in operation of Unit I for 57 days with a non-isolable fault in the
RCS pressure barrier.
In addition, the enclosed inspection report identifies
activities that violated NRC requirements but will not be subject to
enforcement action because the licensee's efforts in identifying and/or
correcting the violation meet the criteria specified in Section VII.B of the
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
Pursuant to 10 CFR 2.790 of the NRC's "Rules of Practice", a copy of this
letter and its enclosure will be placed in the NRC Public Document Room.
080082
9310120012 930929
ADOCK 05000280
G
\\\\
- r£01
\\
Virginia Electric & Power Company
2
SEP 2 9 1993
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Enclosures:
NRC Inspection Report
cc w/encls:
M. L. Bowling, Jr., Manager
Nuclear Licensing
5000 Dominion Boulevard
Glen Allen, VA
23060
M. R. Kansler
Station Manager
Surry Power Station
P. 0. Box 315
Surry, VA
23883
Ray D. Peace, Chairman
Surry County Board of Supervisors
P. 0. Box 130
Dendron, VA
23839
Dr. W. T. Lough
Virginia State Corporation Conunission
P. 0. Box 1197
Richmond, VA
23209
Michael W. Maupin
Riverfront Plaza, East Tower
951 E. Byrd Street
Richmond, VA
23219
Robert B. Strobe, M.D., M.P.H.
P.O. Box 2448
Richmond, VA
23218
cc w/encls cont'd:
(See page 3)
Sincerely,
OltctNAL t:~~i~ 8V
')
'KERRY 0. LAN-Di-! Lr.
Marvin V. Sinkule, Chief
Reactor Projects Branch 2
Division of Reactor Projects
..
Virginia Electric & Power Company
cc w/encls cont'd:
Attorney General
Supreme Court Building
101 North 8th Street
Richmond, VA
23219
bee w/encls:
G. Belisle, RII
L. Garner, RII
B. Buckley, NRR
Document Control Desk
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 1, Box 166
Surry, VA
23883
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 2, Box 78-A
Mineral, VA
23117
- 1:
09/11\\/93
G:\\SU93-22
RIV{IJP
ABELISLE
09/J/93
3
SEP 2 9 1993