Docket Nos. 50-280, 50-281
Virginia Electric and Power Company
ATTN:
Mr. W. L. Stewart
SEP - \\ 1993
Senior Vice President - Nuclear
5000 Dominion Boulevard
Glen Allen, VA
23060 *
Gentlemen:
SUBJECT:
SURRY SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE
(NRC INSPECTION REPORT NOS. 50-280/93-16 AND 50-281/93-16)
The NRC Systematic Assessment of Licensee Performance (SALP) has been
completed for your Surry facility. The facility was evaluated for the period
April 5, 1992, through July 3, 1993.
The results of the evaluation are
documented in the enclosed Initial SALP Report.
This report will be discussed
at a public meeting to be held at the Surry facility on September 14, 1993, at
10:00 a.m.
The performance of your Surry facility was evaluated in the functional areas
of Plant Operations, Radiological Controls, Maintenance/Surveillance, Emergen-
cy Preparedness, Security, Engineering/Technical Support and Safety Assess-
ment/Quality Verification.
The assessment indicates that your staff continued to maintain superior
performance in the areas of Plant Operations, Radiological Controls, Emergency
Preparedness, and Security. The report also recognizes your staff's improving
performance in the Safety Assessment/Quality Verification area and the
improving trend in the Maintenance/Surveillance area.
Good performance was
maintained in the Engineering/Technical Support area.
Examples of areas for
improvements include elimination of transients caused by equipment problems
and resolution of issues arising from setpoint calculation control.
Any comments you have concerning our evaluation of the performance of your
Surry facility should be submitted to this office within 30 days
following the date of our meeting.
Your comments will be considered in the
development of the Final SALP Report and will be issued, along with a summary
of our meeting, as an appendix to the Final SALP Report.
930914025~ 9309
~
- DR
ADOCK osoo8~ao jt~
6J}
SEP - \\ l993
Virginia Electric and Power Company
2
Should you have any questions concerning this letter, we will be pleased to
discuss them with you.
Enclosure:
Initial SALP Report - Surry
cc w/encl:
M. L. Bowling, Jr., Manager
Nuclear Licensing
Virginia Electric & Power Company
5000 Dominion Boulevard
Glen Allen, VA
23060
M. R. Kansler
Station Manager
Surry Power Station
P. 0. Box 315
Surry, VA
23883
Ray D. Peace, Chairman
Surry County Board of Supervisors
P. 0. Box 130
Dendron, VA
23839
Dr. W. T. Lough
Virginia State Corporation Commission
Division of Energy Regulation
P. 0. Box 1197
Richmond, VA
23209
Michael W. Maupin
Hunton and Williams
Riverfront Plaza, East Tower
951 E. Byrd Street
Richmond, VA
23219
Robert B. Strobe, M.D., M.P.H.
State Health Commissioner
P. 0. Box 2448
Richmond, VA
23218
cc w/encl cont'd:
(See page 3}
Sincerely,
Original signed by
Stewart D. Ebneter
Regional Administrator
Virginia Electric and Power Company
3
cc w/encl cont'd:
Attorney General
Supreme Court Building
101 North 8th Street
Richmond, VA
23219
700 Galleria Parkway
Atlanta, GA 30339-5957
SEP - l 1993
Virginia Electric and Power Company
4
bee w/encl:
M. Sinkule, DRP, RII
G. Belisle, DRP, RII
L. Garner, DRP, RII
S. Vias, Chief, TSS (2 copies)
H. Berkow, NRR
B. Buckley, NRR
Document Control Desk
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 1, Box 166
Surry, VA
23883
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 2, Box 78-A
Mineral, VA
23117
bee w/encl.
The Chairman
K. C. Rogers, Commissioner
F. J. Remick, Commissioner
E. G. de Planque, Commissioner
J.M. Taylor, EDO
H. L. Thompson, J'r. , EDO
L. R. Plisco, Regional
Coordinator, EDO
T. E. Murley, NRR
S. Varga, NRR
L. Engle, NRR
F. Allenspach, SALP Coordinator, NRR
Regional Administrators, RI, RIii
RIV, and RV
K. Clark, RII, PAO
DRS and DRSS Branch Chiefs,
and Section Chiefs
RII :DRP
Aife'i ifs l e
r h.1/93
R!~
Mj;~h
4i' I '2.'I /93
HQ:NRR
(Al(;., ~
HBerkow
e--(Jo /93
RII :DRP
f,A. vS
MSinkule
~ /)-1/93
RII :DRP
Jy{t~
Y/JJ93
RII :DRS
JJaudon
1J ltj)/93
RII:DRSS
~""'
Bfttfl lett
\\ /7-7 /93
SEP - \\ \\993
RII :ORA
LReyes
I /93