MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152A4741999-05-19019 May 1999 Forwards Completed Registration Form for Renewal of ASTs at Surry Nuclear Power Station,Iaw Section 9VAC 25-91-100.F ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML20217D6621999-05-14014 May 1999 Forwards NRC Operator Licensing Exams 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15.Nine Candidates Passed (& One Failed) Exam ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr ML18153A3421999-03-26026 March 1999 Provides Updated Medical Status Rept for Wb Gross in Accordance with License SOP-20476-02,Docket 55-5228,as Amended by 980320 License Amend.Informs That Gross Exhibits No Performance Problems & Will Continue on Current Medicine ML20204H0331999-03-17017 March 1999 Forwards Rev 5 to PSP for Surry & North Anna Power Stations & Associated Isfsis.Description & Justification for Changes Included with Plan Rev.Rev 5 to PSP Withheld Per 10CFR73.21 ML18153A3411999-03-15015 March 1999 Forwards Signed Applications & Medical Certificates for Initial License at Surry Power Station Units 1 & 2 for Listed Individuals.Without Encls 1999-09-08
[Table view] |
Text
.'
VIRGINIA ELECTRIC AND PowER CoMPANY RICHMOND, VIRGINIA 23261 September 24, 1998 U. S. Nuclear Regulatory Commission Serial No.98-125 Attention: Document Control Desk NL&OS/GDM RO Washington, D.C. 20555 Docket Nos. 50-280 -
50-281 License Nos. DPR-32 DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 TECHNICAL SPECIFICATIONS CHANGE SUPPLEMENT RELOCATION OF FIRE PROTECTION REQUIREMENTS Virginia Electric and Power Company submitted a Technical Specifications (TS) change request on January 26, 1993 (Serial No.92-727) to relocate the fire protection requirements from the TS to the Updated Final Safety Analysis Report (UFSAR). The request was subsequently withdrawn by our letter dated April 23, 1996 (Serial No.96-104) to facilitate a detailed review and clarification of our fire protection licensing basis as specified in the NRC's Fire Protection Safety Evaluation Report for Surry Power Station dated September 19, 1979. Upon completion of this review, we provided clarifications to the NRC's SER and resubmitted the TS change request to the NRG for\
I approval in its original form in our letter dated September 12, 1996 (Serial No. J 96-104A). However, since the TS change request was originally submitted, certain TS requirements assumed by the original Technical Specifications change request have been deleted by a separate, unrelated TS amendment. Therefore, to ensure that the necessary TS requirements are in place to meet Generic Letter guidance for relocating fire protection requirements from the TS to the UFSAR, one previously requested TS
- rao b change item has been revised and a new TS requirement has been added.
A discussion of the supplemental Technical Specifications change is provided in Attachment 1. The two proposed Technical Specifications pages affected by this supplement are provided in Attachment 2. It has been determined that the proposed Technical Specifications change supplement does not involve an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92. The basis for our determination that the supplemental change does not involve a significant hazards consideration is provided in Attachment 3. The proposed Technical Specifications change supplement has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Management Safety Review Committee. The complete proposed TS change request
____**, JS'*(~ 3 ~~
9809290252 980924 " -~
PDR ADOCK 05000280 P PDR,
/~
e
- pages, which incorporate the two changes made by this supplement, are provided in Attr;:ichme!lt 4 for your information. Due to the extensive number of procedures that will require revision upon the approval of this Technical Specification change request, a sixty (60) day implementation period is requested.
Should you have any questions or require additional information, please contact us.
Very truly yours, James P. O'Hanlon Senior Vice President - Nuclear Attachments
- 1. Discussion of Change
- 2. Proposed Supplemental Technical Specifications Change
- 3. Significant Hazards Consideration Determination
- 4. Complete Proposed Technical Specifications Pages cc: U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station Commissioner Bureau of Radiological Health Room 104A 1500 East Main Street Richmond, Virginia 23219 Commitment Summary
- 1. The commitments made in this letter are as indicated in the proposed Technical Specifications.
. .) '
COMMONWEALTH OF VIRGINIA )
)
COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by J. P. O'Hanlon, who is Senior Vice President - Nuclear, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me thisJ~U'.) day of !oknLVJl/L ,19 qJ.
My Commission Expires: March 31, 2000.
(' ,
Attachment 1 Discussion of Change
. t
INTRODUCTION Virginia Electric and Power Company (Virginia Power) previously submitted a Technical Specifications change request to relocate the Fire Protection (FP) requirements from the Technical Specifications (TS) to the Updated Final Safety Analysis Report (UFSAR). The submitted TS change request was based on the NRC guidance provided in Generic Letters (GL) 86-10, "Implementation of Fire Protection Requirements," and 88-12, "Removal of Fire Protection Requirements From Technical Specifications." During the NRC's review of the TS change request, certain areas that deviated from the guidance provided in the Generic Letters were questioned, and the NRC requested Virginia Power to revise the change request to adhere to the GL guidance in its entirety or to provide additional justification of how the intent of the GL guidance was being met. This revised TS change request resolves the NRC comments as discussed in detail below.
This revised TS change request is administrative in nature, and, as such, does not result in an unreviewed safety question or a significant hazards consideration.
BACKGROUND Pursuant to NRC guidance provided in Generic Letters (GL) 86-10, "Implementation of Fire Protection Requirements," and Generic Letter 88-12, "Removal of Fire Protection Requirements From Technical Specifications," Virginia Power submitted a Technical Specifications (TS) change request to relocate FP requirements from the TS to the UFSAR. The. Generic Letters' guidance consisted of various elements to be implemented that would assure NRC approval. Deviation from these elements, it was noted, would require more detailed NRC review for approval.
Licensing Basis Generic Letters 86-10 and 88-12 permit licensees to remove their fire protection programs from their Technical Specifications and incorporate them into their UFSARs.
GL 88-12 provided the elements that a licensee should include in a license amendment request to remove fire protection requirements from the TS. The five elements specified are as follows:
- 1. The NRC-approved Fire Protection Program must be incorporated into the Final Safety Analysis Report and submitted with certification as required by 10 CFR 50.71 (e)(2).
- 2. The Limiting Conditions for Operation (LCO) and Surveillance Requirements associated with the fire detection systems, fire suppression systems, fire barriers, 1 of 4
\.*
and the administrative controls that address fire brigade staffing would be relocated
.from tbe TS.
- 3. All operational conditions, remedial actions, and test requirements presently included in the TS for these systems, as well as the fire brigade staffing requirements, shall be incorporated into the Fire Protection Program.
- 4. The standard fire protection license condition in Generic Letter 86-10 must be included in the license. Any other current fire protection license conditions shall be removed.
- 5. The Administrative Controls section of the TS shall be augmented to support the Fire Protection Program by adding two specifications. First the Onsite Review Group shall be given the responsibility for the review of the Fire Protection Program and implementing procedures and the submittal of recommended changes to the Offsite or Corporate Review Group. Second, Fire Protection Program implementation shall be added to the list of elements for which written procedures shall be established, implemented and maintained.
Virginia Power submitted a Technical Specifications change request on January 26, 1993 (Serial No.92-727) to relocate the fire protection requirements from the TS to the UFSAR. The request was subsequently withdrawn by our letter dated April 23, 1996 (Serial No.96-104) to facilitate a detailed review and clarification of our fire protection licensing basis as specified in the NRC's Fire Protection Safety Evaluation Report for Surry Power Station dated September 19, 1979. Upon completion of this review, we provided clarifications to the NRC's SER and resubmitted the TS change request to the NRC for approval in its original form in our letter dated September 12, 1996 (Serial No.
96-104A).
The original TS change request met elements 1-4 above as requested by GL 88-12.
However, we took exception to element 5 to maintain TS consistency. Element 5 above requires SNSOC review of changes to the Fire Protection Program and implementing procedures and the submittal of recommended changes to an offsite review group. The proposed TS change request, however, revised the TS to require the submittal of recommended changes to the Station Manager (now the Site Vice President) as opposed to an offsite review group. As noted in GL 88-12, the Emergency Plan and the Security Plans were used as models to determine the appropriate administrative controls for the FP Program. At the time of the original TS change request submittal, Surry's TS included a requirement for SNSOC to review changes to the Emergency and Security Plans and their implementing procedures and to submit recommended changes to the Station Manager. Therefore, to maintain consistency with the TS and the intent of the GL 88-12, the FP Program administrative specification was also written to provide recommended changes to the Station Manager, as opposed to an offsite review group.
2 of 4
\.,')
. However, since the TS change request was originally submitted, the specific Technical Specifications that required Station Manager approval for changes to the Emergency and Security Plans have been deleted by a separate, unrelated TS amendment. In a letter dated July 20, 1993 (Serial No.93-356), Virginia Power submitted a TS change request as a Cost Beneficial Licensing Action to delete certain specific review and audit frequency requirements from the TS. Part of the basis for the TS change request was that the review and audit requirements being deleted were already addressed in other documents (e.g., Code of Federal Regulations, TS License Condition I, Operational Quality Assurance Program Topical Report, etc.) However, when that TS change request was submitted, and later approved by the NRC in their Safety Evaluation Report for TS Amendment No. 188 dated March 1, 1994, the inconsistency with the proposed fire protection TS relocation change request was not recognized.
Therefore, an administrative TS that requires SNSOC review of changes to the Fire Protection Program and implementing procedures and the submittal of recommended changes to the designated offsite management responsible for reviewing changes that pertain to Fire Protection is being incorporated into the TS. The offsite review function for changes to the Fire Protection Program and its implementing procedures is already addressed in station procedures.
Element 5 above also requires that a statement must be included in the administrative controls section qf the Technical Specifications that states that the facility FP program and implementing procedures have been established and are implemented and maintained. Such a statement resided in the Surry TS at the time of the original TS change submittal to the NRC, therefore no TS changes were required to meet this requirement. However, the same TS amendment that deleted the requirement for the Station Manager to review changes to the Emergency and Security Plans and implementing .procedures also deleted the required FP Program and procedure statement from the TS. As noted above, the basis for the deletions was that these requirements are redundant with other higher-tier regulatory documents. This TS change request re-instates the deleted statement, in part, consistent with GL 88-12 guidance.
SPECIFIC CHANGES Specific changes to Section 6 of the Technical Specifications (TS) are being made as indicated below. These changes either revise, or are in addition to, the original proposed TS change provided in our letter dated January 26, 1993 (Serial No.92-727).
- TS 6.1.C.1.f.13 TS 6.1.C.1.f.13, added in our original Technical Specification change request dated January 26, 1993 (Serial No.92-727), is being revised. Our original 3 of 4
' t
- e submittal noted that changes to the Fire Protection Program and implementing pro.cedures require review by the Station Nuclear Safety and Operating Committee (SNSOC) and recommended changes shall be submitted to the Station Manager. However, consistent with element #5 of GL 88-12, the proposed TS is being revised to require SNSOC to submit recommended changes to the offsite review group. Therefore, TS 6.1.C.1.f.13 is revised to read as follows:
- 13. Review of the Fire Protection Program and implementing procedures and shall submit recommended Program changes to the designated offsite management responsible for reviewing changes that pertain to Fire Protection.
- TS 6.4.E TS 6.4.E is added to re-instate a portion of the previously deleted TS 6.4.J that requires the establishment, implementation and maintenance of the Fire Protection Program and implementing procedures. The new TS 6.4.E is included as follows:
- E. The facility Fire Protection Program and implementing procedures which have been established for the station shall be implemented and maintained.
SAFETY SIGNIFICANCE These changes are administrative in nature and only incorporate two additional programmatic requirements into the TS. Plant modifications are not being implemented, nor are station operations being affected in any way. The Fire Protection Program is being retained and maintained in the UFSAR and station procedures. Since the TS changes are administrative in nature, there is no increase in the probability or consequences of an accident, no accident of a different type is created, and the margin of safety is unaffected. Therefore, the proposed change to the Technical Specifications has no impact on safety and does not result in an unreviewed safety question.
4 of 4