Insp Repts 50-280/87-10 & 50-281/87-10 on 870504-06 & 18-19. Violations Noted:Failure to Conduct Annual Physical Inventory of All SNM & Failure to Maintain Adequate Records for Control of All SNM
ML18150A192
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/15/1987
From: Mcalpine E, Son Ninh
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18150A190 List:
References
50-280-87-10, 50-281-87-10, NUDOCS 8706260367
Download: ML18150A192 (4)


See also: IR 05000280/1987010

Text

Report Nos. :

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, N.W.

ATLANTA, GEORGIA 30323

JUN 171987

50-280/87-10 and 50-281/87-10

Licensee:

Virginia Electric and Power Company

Richmond, VA

23261

Docket Nos.:

50-280 and 50-281

Facility Name:

Surry 1 and 2

License Nos.: DPR-32 and DPR-37

Inspection ConduJ:..t.ttd:

May 4-6 and 18-19, 1987

~-~ /1/ t

Inspector:

/ ..,.,/f_//\\.P1k-1./.

S. Q. Ninh~~uel Facilities Inspector

Approved by:

  • ,~ t

E. J. McAlpine, Chief, Ma erial Control and

Accountability Section, Nuclear Materials

Safety and Safeguards Branch, Division of

Radiatfon Safety and Safeguards

SUMMARY

6 /is- /8'7

Date Signed

6 (tS/-g,

Date Signed

Scope: This routine, unannounced inspection was conducted by one NRC inspector

in the areas of nuclear material accounting procedures, records and reports,

and physical inventory.

Results:

One violation was identified for failure to establish and maintain an

adequate material control and accounting procedure which resulted in a failure

to conduct an annual physical inventory of all special nuclear material (SNM),

and a failure to maintain adequate records for control of all SNM.

.. -* '.; _.,_ :. - **---; .. -..

REPORT DETAILS

Report Nos. 50-280/87-10 and 50-281/87-10

1.

Key Persons Contacted

  • H. Miller, Assistant Manager
  • J. Bailey, Superintendent Operations
  • R. Blount, Superintendent Technical Services
  • T. Brookmire, Fuel Engineer

The inspector also interviewed several other licensee employees.

  • Denotes those present at the exit interview.

2.

Exit Interview

The inspection scope and findings were summarized on May 19, 1987, with

those persons indicated in paragraph 1 above.

One violation was identified

for failure to establish and maintain adequate material control and

accounting procedures which resulted in a failure to conduct an annual

physical inventory of all SNM, and a failure to maintain adequate records

for control of all SNM were discussed in detail (paragraph 3).

The

licensee acknowledged the inspection findings and stated that all incore

detectors were still onsite.

3.

Material Control and Accounting - Power Reactors (85102)

The inspection was conducted to determine the adequacy of Virginia

Electric and Power Company 1s program to account for and control the SNM in

its possession and to l~mit the use of possessed SNM to the locations and

purposes authorized by licensee at the Surry Nuclear Power Station.

The licensee

1 s material controls were examined by review of procedures,

audit of records and reports, review of the conduct of physical inventory

and interviews with appropriate licensee personnel.

a.

Procedure Review

The inspector reviewed the procedures and documents listed below:

(1)

DOE/NRC 741

Nuclear Material Transaction Report

(2)

DOE/NRC 742

Material Balance Report

(3)

DOE/NRC 742c

Physical Inventory Listing

(4)

Fuel Assembly History Sheets

(5)

Insert Component History Sheets

( 6)

Fuel Assembly and Insert Component Accountability and Control

Audit Procedure No. FQAI-18.10, Rev. 0, dated January 27, 1986

b.

(7)

(8)

(9)

(10)

2

Nuclear

Material

Handling

and

Accountability

No. ADM-32, dated March 6, 1986

Virginia Nuclear Fuel Handling Report VNF-7

Fuel Assembly and Insert Component Index Sheets

Fuel Assembly Physical Inventory Records

Procedure

The licensee 1 s Nuclear Fuel Handling and Accountability Procedure

No. ADM-32 was determined to be inadequate in that it did not address

the fundamental elements of material control in the area of storage,

inventory, and internal transfer of SNM incore and excore detectors.

In addition, no written statements of responsibility and authority

for the positions responsible for SNM incore and excore detector

receiving, shipping, inventory, storage and i nterna 1 transfers were

addressed in the procedure.

Therefore, failure of the licensee to

establish and maintain a material control and accounting procedure

sufficient to account for all SNM is in violation of 10 CFR 70.5l(c)

(50-280, 281/87-10-01) which resulted in additional violations of

NRC regulatory requirements (see paragraph 3.b and 3.c).

Records and Reports Audit

Receipts and shipments of SNM for the period September 30, 1984

through March 31, 1987, were verified by examination of

DOE/NRC-Form 741s,

"Nuclear Material

Transaction

Report.

11

The

transaction .reports had been completed in accordance with NUREG/BR-006

instructions.

To determine the adequacy of the licensee 1 s fuel

accountability records, a sampling of several fuel assemblies stored

in the spent fuel storage area were traced through Transaction Report

(Form DOE/NRC 741), and compared to a schematic diagram located in

the operations office for verification of the fuel assembly identifi-

cation and location.

The licensee 1 s Materi*al Balance Reports (Form

DOE/NRC 742s) were reviewed for the period September 30, 1984 through

March 31, 1987, to determine whether the reports accurately reflected

quantities of SNM in the material balance .

The reports were

completed in accordance with NUREG/BR-007 and recorded data including

nuclear material depletion and production were found to be in

agreement with the accountability records for fuel assemblies on

inventory for Un it 1 and 2, spent fue 1 * storage, and new fue 1 storage

area.

It was determined from the discussion held with the licensee during

the inspection that to date the Surry Nuclear Power Station has

received 88 SNM i ncore detectors and four excore detectors.

Ten

i ncore detectors and four excore detectors are currently in use,

eight incore detectors are stored in warehouse, three incore detectors

are located in the power storage wall.

Since licensing, approximately

67 i ncore detectors were transferred to the hi gh-1 eve l radwaste

drums.

The inspectors determined that the licensee had no control

documentation or working knowledge of any movement of incore detectors

3

once they had been removed from ~ower storage wall to the high-level

radwaste drums.

Failure to maintain a records system which provides

documentation to support the transfer and storage of SNM i ncore

detectors between item control areas within the plant is in violation

.of 10 CFR 70.5l(b)(l) (50-280, 281/87-10-01).

c.

Physical Inventory

The inspector determined that the licensee has conducted a physical

inventory of the new and spent fuel storage after each refueling or

at least annually in accordance with the licensee's procedure.

The

physical inventory consisted of a 100% piece count in the spent fuel

storage area (SFSA), with a random selection of fuel assemblies in

the SFSA for serial number verification at 95% confidence level. A

100% serial number verification was also conducted in the new fuel

storage area.

A video tape of the reactor core is being saved as a

record of physical inventory of the reactor cores.

The inspector observed that discrete irradiated i ncore, irradiated

excore and unirradiated incore detectors containing SNM, had been

excluded from the annual physical inventory listing since the

licensee was not aware of such requirements.

Failure of the licensee

to conduct an annual physical inventory of all incore and excore

detectors is in violation of 10 CFR 70.5l(d) (50-280, 281/87-0-10-0l).