Text
ENCLOSURE 1 NOTICE OF VIOLATION Virginia Electric and Power Company Surry Power Station Docket Nos.:
50-280 and 50-281 License Nos.:
DPR-32 and DRR-37 During the Nuclear Regulatory Commission (NRC) inspection conducted on May 4-8, 1987, a violation of NRC requirements was identified. The violation involved a failure to provide training to members of the emergency organization in accordance with the Emergency Plan.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1987), the violation is listed below:
10 CFR 50.54(q) requires that nuclear power reactor licensees follow and maintain in effect emergency plans which meet the requirements of 10 CFR 50, Appendix E and the Planning Standards of 10 CFR 50.47(b).
10 CFR 50.47(b)(15) requires that radiological emergency response training be provided to those who may be called upon to assist in an emergency.
10 CFR 50, Appendix E, Section IV.F requires that specialized initial and periodic retraining be provided for nine categories of emergency personnel.
Section 8.3 of the Surry Emergency Plan requires that emergency response personnel be instructed annually covering their functional responsibility during an emergency.
The specific training requirements for each functional position is detailed in Table 8.1, "Emergency Preparedness Training."
- Contrary to the above, all personnel expected to respond in the event of an emergency have not been trained in accordance with the Emergency Plan training requirements.
A random sampling of training records for approximately twenty (20) individuals indicated that eight (8) had either not received initial specialized emergency training or had not been retrained within the applicable time frame.
The individuals lacking the required training held both primary and alternate positions in the emergency organization and were typically the mid-level management in the normal plant organization.
This is a Severity Level IV violation (Supplement VIII).
Pursuant to the provisions of 10 CFR 2.201, Virginia Electric and Power Company is hereby required to submit to this Office within 30 days of the date of the letter transmitting this Notice a written statement or explanation in reply including:
(1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the 30045 870526 87060 05000280 PDR ADOCK PDR G
Virginia Electric and Power Company Surry Power Station 2
Docket Nos:
50-280 and 50-281 License Nos.:
DPR-32 and DPR-37 results achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved.
When cause is shown, consideration will be given to extending the response time.*
Dated at Atlanta, Georgia this 26 day of May 1987 FOR-THE NUCLEAR -REGULATORY COMMl5SI0N -
~>11*~
J. Philip Stohr, Director Division of Radiation Safety and Safeguards
.