Virginia Electric and Power Company ATTN:

Mr. W. L; Stewart, Vice President, Nuclear Operations P. 0. Box 26666 Richmond, VA 23261 Gentlemen:

SUBJECT:

DOCKET NOS. 50-338 AND 50-339, AND 50-280, 50-281 As part of the NRC Confirmatory Measurements Program, 1 iquid samples spiked with radionuclides will be sent to the North Anna and Surry facilities for radiochemical analyses. These samples are,to be analyzed for tritium, iron-55, strontium-89, and strontium-90 in accordance with your approved procedures for analysis of liquid waste samples.

If routine analyses of this type are

, normally performed by a vendor, this vendor should be used to analyze the spiked samples.

The spiked samples, with instructions, will be sent under separate cover from the Department of Energy 1s Radiological and Environmental Sciences Laboratory, within approximately 30 days.

We request that the analyses be completed as soon as practicable, but not later than 60 days from receipt of the samples.

Results should be sent to:

U. S. Nuclr:ar Regulatory Commission, Attn:

Mr. J. B. Kahle.

Our evaluation of your re~ults will be discussed with your staff and transmitted in a letter~

Spiked samples will be sent to you on an annual basis as part of our routine inspection program.

If you have any questions regarding this program, please contact Mr. Kahle by telephone at (404) 331-6968.

cc:

(See page 2)

B70504Ag~~ ~86~~80 PDR PDR.

p Sincerely, Thomas A. Peebles, Acting Chief Reactor Projects Branch 2 Division of Reactor Projects

\\

e Virginia Electric and Power Company cc:

E. W. Harrell, Nor.th Anna Station Manager N. E. Clark, Manager - Nuclear Programs and Licensing R. F. Saunders, Surry Power Station Manager L. B. Jones, Chemistry Supervisor 2

S. P. Sarver, Superintendent, Health Physics, Surry Power Station W. C. Barnes, III, Assistant Health Physics Supervisor, Count Room/

Environmental, North Anna bee: NRC Resident Inspector Document Control Desk Commonwealth of Virginia RII RI!

,/,I~

.,LJtu SAdamov i tz /p1lJ Kahle 4//,)187

~ 4/.P//87

~