ML18149A191
| ML18149A191 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 06/19/1986 |
| From: | Chandu Patel Office of Nuclear Reactor Regulation |
| To: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18149A192 | List: |
| References | |
| GL-83-28, NUDOCS 8606250561 | |
| Download: ML18149A191 (2) | |
Text
- -*:
Do~iet Nos.:
50-280 50-281 e
Mr. W. L. Stewart, Vice President Nuclear Operations Virginia Electric and Power Company Post Off i c-e Box 26666 Richmond, Virginia 23261
Dear Mr. Stewart:
June 19, l 98~
DISTRIBUTION:
Docket File NRC PDR Local PDR PAD#2 Rdg.
T. Novak DELO E. Jordan B. Grimes J. Partlow N. Thompson, DHFT C. Patel D. Miller ACRS ( 10)
Tech Branch By letter dated November 4, 1983, you provided a response to Generic Letter 83-28 including Item 4.3, 11 Reactor Trip System Reliability.
11 By letter dated November 15, 1984, we issued our Safety Evaluation which found the design modifications for Item 4.3 to be acceptable except for the following issues:
A.
Final seismic qualifications of the shunt trip attachment; B.
Provision of breaker position indication on the main control board to provide the operator with the status of the reactor trip and bypass breakers; C.
Submission of proposed technical specifications for the Item 4.3 modifications.
By letters dated April 1, September 9, October 7, October 31, and December 30, 1985, you submitted additional information on these issues.
We have reviewed these submittals, except for the proposed technical specifications.
Based on our review we conclude that your responses to Item 4.3 of Generic Letter 83-28 are acceptable.
Our Safety Evaluation is enclosed.
The proposed technical specifications will be evaluated separately.
It is our understanding that this item has been implemented at both Surry units. If this is not the case, please provide us with the expected dates of completing the modifications and actual implementation dates when it is implemented.
Enclosure:
As stated cc:
See next u{)A~
o~]t~~-
6/\\fl86 page e,fP PM:PAD#2 CPatel 6/ /~ /86
- 8606250561 860619 PDR ADOCK 05000280 p
PDR Sincerely,
~~ p,f~
Chandu P. Patel, Project Manager PWR Project Directorate #2 Division of PWR Licensing-A D:PAD#2 LRuEr.nstein 6/ f16'86
e Mr. W. ~- Stewart Virginia Electric and Power Company cc:
Mr. Michael W. Maupin Hunton and Williams Post Office Box 1535 Richmond, Virginia 23213 Mr. Robert F. Saunders, Manager Surry Power Station Post Office Box 315 Surry, Virginia 23883 Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission Post Office Box 166, Route 1 Surry, Virginia 23883 Mr. Sherlock Holmes, Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 W. _T. Lough Virginia Corporation Corrmission Division of Energy Regulation Post Office ~ox 1197 Richmond, Virginia 23209 Mr. J. T. Rhodes Senior Vice President - Power Ops.
Virginia Electric and Power Company Post Office Box 26666 Richmond, Virginia 23261 Regional Administrator, Region II
~-
U.S. Nuclear Regulatory Comnission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30323 James B. Kenley, M.D., Comnissioner Department of Health 109 Governor Street Richmond, Virginia 23219 e
Surry Power Station Attorney General Supreme Court Building 101 North 8th Street Richmond, Virginia 23219