- Docket Nos. 50-280 and 50-281 Mr. W. L. Stewart May 28, 1985 Vice President - Nuclear Operations Virginia Electric and Power Company Post Office Box 26666 Richmond, Virginia 23261
Dear Mr. Stewart:
DISTRIBUTION
. *** Docket Fi 1 e L*PDR HThompson EJordan JPartlow ACRS 10 Gray File NRC PDR ORB#l Rdg OELD BGrimes JDNeighbors CParrish We are reviewing the proposed Technical Specifications related to Inservice Inspection for the Surry Power Station submitted by your letter dated September 21, 1982.
We find that we need additional information to continue our review.
It is requested that you provide the information listed in the enclosure within 30 days of receipt of this letter or provide us with your schedule for doing so.
The reporting and/or recordkeeping re*quirements of this letter affect fewer than ten respondents; therefore, 0MB clearance is not required under P.L.96-511.
Enclosure:
As stated cc:
See next page ORB#l:~ORB~.
CP<)i!'rish DNe1 ors;ps 5/l,..1'85 5/'J_'?
5 Sincerely, Steven A. Varga, Chief Operating Reactors Branch #1 Division of Licensing Cf 1"t? 52
e Mr. W. L. Stewart Virginia Electric and Power Company cc:
Mr. Michael W. Maupin Hunton and Williams Post Office Box 1535 Richmond, Virginia 23213 Mr. Robert F. Saunders, Manager Surry Power Station Post Office Box 315 Surry, Virginia 23883 Donald J. Burke, Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission Post Office Box 166, Route 1 Surry, Virginia 23883 Mr. Sherlock Holmes, Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 W. T. Lough Virginia Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23209 Mr. J. H. Ferguson Executive Vice President - Power Virginia Electric and Power Company Post Office Box 26666 Richmond, Virginia 23261 Dr. J. Nelson Grace Regional Administrator - Region II U.S. Nuclear Regulatory Co11i11ission Suite 2900 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 James B. Kenley, M.D., Conmissioner Department of Health 109 Governor Street Richmond, Virginia 23219 Surry Power Station Attorney General Supreme Court Building 101 North 8th Street Richmond, Virginia 23219
ENCLOSURE ADDITIONAL INFORMATION REQUESTED -
PROPOSED TECHNICAL SPECIFICATION CHANGES, SURRY UNITS 1 AND 2
- 1.
Provide a detailed description giving the reasons and justifications for your proposed changes.
This could be similar to the 11Description of Changes 11 provided with your February 14, 1979, request for Technical Specification (TS) changes.
- 2.
With regard to your proposed wording for TSs 4.0.2 and 4.0.3, we encourage you to use instead the wording indicated in 4.0.2 and 4.0.5 of the Standard Technical Specifications (STSs) for Westinghouse Pressurized Water Reactors (NUREG-0452, Revision 4). Please indicate whether you have any objection to this STS wording as a modification to your proposed changes.
- 3.
With regard to the bases you propose for TS 4.0, please indicate whether you have any objection to substituting, as a modification to your proposed changes, the wording of STS Bases 4.0.2 and 4.0.5.
- 4. For TS Table 4.1-2A, item 13, explain what effect the proposed changes will have on test frequency and type of stroking requirements (i.e., full versus partial stroking).
- 5. Verify that you will continue to maintain as pennanent records the past Inservice Inspection (ISI) data that were generated in complying with TS Table 4.2-1.
- 6.
Provide detailed justification for your deletion of most of TS Table 4.2-1, Section G, Miscellaneous Inspections.
- 7.
Indicate whether the changes that you propose in pump test frequency require changes to your flushing requirements referred to in TS Table 4.1-3.
- 8. Provide detailed justification for your deletion of the special inspections of sensitized stainless steel piping in TS Table 4.2-1, Section H.
- 9.
Explain the significance of the changes you propose in the pump flywheel inspection requirements.
- 10.
With regard to your proposed changes to TS 4.3, explain and justify in detail, your deletion of the reactor coolant system leakage test in TS 4.3.0.
Include an explanation of why this test was originally included in the TSs.
- 11.
Provide a revised TS index identifying your proposed changes.
2
- 12.
Check your submittal to assure that TS changes you proposed are still appropriate.
You may wish to modify the your September 21, 1982, submittal in order to incorporate corrections that were proposed and accepted subsequent to the submittal.