()CT O 5 'S84 ENCLOSURE 1 NOTICE OF VIOLATION Virginia Electric and Power Company Surry Units 1 and 2 Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 The following violations were identified during an inspection conducted on August 1-31, 1984.
The Severity Levels were assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).
- 1.
Technical Specification 6.4.D requires that the detailed written procedures provided for operation of the unit and of al 1 systems and components involving nuclear safety of the station, including corrective maintenance on these systems and components, shall be followed.
ADM-29.5 requires the bypass of safety functions to be performed in accordance with written, approved procedures.
Contrary to the above Technical Specification requirements; Administrative Procedure ADM-29.5, Section 4.2, and Electrical Maintenance Procedure EMP-C-RT-24 were not followed on August 21, 1984, when Unit 2 18 1 train RPS reactor trip logic was bypassed during full power operation.
Procedure EMP-C-RT-24, which was used to replace the failed BF relay in the RPS, did not specify bypassing the 18 1 train reactor trip logic.
The 18 1 reactor trip bypass breaker was closed during the maintenance, and the 1A1 RPS train and breaker were fully operable as required.
This is a Severity Level V violation (Supplement I), and applies to Unit 2.
- 2.
10 CFR 50.59 requires records of written safety evaluations which determine that an unreviewed safety question is not involved when the licensee makes changes in the facility as described in the safety analysis report (FSAR).
Contrary to the above requirement, as of August 31, 1984, a written safety evaluation of the facility change which removed the automatic trip valve isolation function on high flow from the RCP thermal barrier coolers and the primary drain coolers, as described in Section 9.4 of the Surry FSAR, was not provided and maintained.
This is a Severity Level IV violation (Supplement I), and applies to both Units.
Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.
--- -850206(f313 841005 PDR AD0CK 05000280 G
Virginia Electric and Power Company cc w/encls:
J. H. Ferguson, Chief Operating Officer W. S. Mistr, Manager - Security R. F. Saunders, Station Manager OCT O 5 1984 2