e
OEC O 11981.
Virginia Electric and Power Company
ATTN:
Mr. R. H. Leasburg, Vice President
Nuclear Operations
P. 0. Box 26666
Richmond~ VA 23261
Gentlemen:
Subject: Repo~t Nos. ~and 50-281/81-25
This refer*s to the routine safety inspection conducted by Mr. J. M. Puckett of
this office on September 21-25, 1981, of activities authorized by NRC Operating
License Nos.* DPR-32 and DPR-37 for the Surry facility. Our preliminary findings
were discussed with Mr. J. L. Wilson, Station Manager, at the conclusion of the
inspection.
The inspection was an examination of the activities conducted under your license
as they relate to*radiation safety and to compliance with the Commission's rules
and.regulations and the conditions of your license. The inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by t~e inspector.
"
During this inspection it was found that certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in .the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
- Appendix A.
We have.examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspettion report.
In accordance with 10 CFR 2.790(a), 'a ~opy of this letter and the enclosure(s)
will be placed in the NRC's Public Document Room unless you notify this office,-_
by.telephone, within ten days of the date of this letter and submit written
app.lication to withhold information contained therein within thirty qays of the
date of thii letter. Such application must be consistent with the re~uirements
of 2.790(b)(l).
Should you have any questions concerning this letter, we will be glad to discuss
them with you;
Enclosures:
See Page 2
Sincerely,
Is!
Paul J. Kellogg,-Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
. '.
Virginia Electric and Power Co.
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-280/81-25
and 50-281/81-25
cc w/encl:
E. Davis, Director Nuclear Security
J. H. Ferguson, Executive
Vice President-Power
J. L. Wilson, Manager
bee w/encl:
Document Management Branch
Commonwealth of Virginia
2
RII~
JPuckett:es
11/1.';/81
RII~
~
CMHosey
111,,;1s1
GR~ on
m!~sl
DEC O 11981
RII J//
PJ~g
1111 781