Forwards IE Insp Repts 50-280/81-27 & 50-281/81-27 on 810901-30.No Noncompliance Noted
ML18139B640
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/30/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18139B641 List:
References
NUDOCS 8112070464
Download: ML18139B640 (2)


See also: IR 05000280/1981027

Text

OCT 3 o 1981

Virginia Electric and Power Company

ATTN:

Mr. R. H. Leasburg, Vice President

Nuclear Operations

P. 0. Box 26666

Richmond, VA

23261

Gentlemen:

Subject:

Report Nos. ~~and 50-281/81-27

This refers to the routine safety inspection conducted by Mr. D. J. Burke of this

office on September 1-30, 1981, of activities authorized by NRC Operating License

Nos. DPR-32 and DPR-37 for the Surry facility and to the discussion of our

findings held with Mr. J. L. Wilson, Plant Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the~scope of this inspection, no violations or deviations were disclosed .

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790 of the Commission

1s regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from dis-

closure unqer 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this office

by telephone within ten days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five days from the

date of this letter a written application to this office to withhold such infor-

mation.

If your receipt of this letter has been delayed such that less than

seven days are available for your review, please notify this office promptly so

that a new due date may be established. Consistent with section 2.790(b)(l),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure. This sec ti on further

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear from

you in this iegard within the specified periods noted above, the report will be

placed in the Public Document Room .

( 8112070464 811030 1

PDR ADOCK 05000280 J

-- G

_

PDR,

\\r, *

e

Virginia Electric and Power Company

.2

OCT 3 0 1981

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Enclosures:

Inspection Report No. 50-280/81-27

and 50-281/81-27

cc w/encl:

J. H. Ferguson, Executive

Vice President

J. L. Wilson, Manager

bee w/encl:

Document Management Branch

State of Virginia

\\

Sincerely,

fs(

Paul J. Kellogg, Chief

Reactor Projects Branch 2,

Division of Resident and

Reactor Project Inspection

RII :RR~~1

l:J-Cy

HDance

l0/17/81

RII: Rt'7

PJK~

10/?0/81