Text
.. __
Virginia Electric and Power Company
ATTN:
Mr. J. H. Ferguson
Executive Vice President-Power
P. 0. Box 26666
Richmond, VA 23261
Gentlemen:
- - - - - - - -
JUL i 5 1981
Subject: Report No~and 50-281/81-18
e
This refers to the special safety inspection conducted by Mr. J. J. Lenahan of
this office on June 17-18, 1981, of activities authorized by NRC Operating
License Nos. DPR-32 and DPR-37 for the Surry facility.
Our preliminary findings
were discussed with Mr. J. L. Wilson, Station Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examin~tions of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
We have examined actions you have taken with regard to previously reported unre-
solved items. The status of these items is di~cussed in the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from disclo-
sure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such infor-
mation.
If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so
that a new due date may be established.
Consistent with section 2.790(b)(l),
such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part thereof sought to be with-
held, and a full statement of the reasons on the basis of which it is claimed
that the information should be withheld from public disclosure.
This section
further requires the statement to address with specificity the considerations
listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit. If we
do not hear from you in this regard within the specified periods noted above,
-.
the report will be placed in the Public Document Room .
r"-sio9010504 810820 ,*\\
, PDR. ADOCK 05000280*
G
PDR,
..
e
Virginia Electric and Power Company
2
JUL 1 5 1981
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos.
50-280/81-18 and 50-281/81-18
cc w/encl:
J. L. Wilson, Manager
bee w/encl:
NRC Resident Inspector
Central Files
Local Public Document Room
Washington Public Document Room
Nuclear Safety Information Center
Technical Information Center
Document Management Branch
Commonwealth of Virginia
RI!~
RII~t/
RI~
CE~urp y
Jlenahan:aw
TC nlon
0114 /81
0711J/ l8l
01 ;) (81
Sincerely,
P. J. Kellogg, Acting Chief
Reactor Projects Branch #2
Division of Resident and
Reactor Project Inspect i.on
RI!
Rllf::!
~G~
MSh 'ml ock
. 07/f /81
071f!81
!
RI1#.;;
PJ
ogg
07jf81